For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-23 — Subways—Power lines to be located in conduits

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 21-23

Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/53fb06b8-cbe8-42cd-ba80-2db0fef33f92

Sec. 21-23. - Subways—Power lines to be located in conduits.

All persons owning or operating electric wires over or along the streets and highways in the city where main conduits are built and constructed, are hereby required to place such electric wires underground in such conduits and to remove the poles carrying only such wires within two (2) months after written notice thereof has been given to such persons by the clerk, except for such wires as are used in operating signals on any railroad, or wires used in connection with the operation of any railroad by means of electricity upon a third rail system.

(Code 1970, § 2-268)

Ask a question about New Britain law

Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.