Sec. 21-92. - Backfilling.

(a) Specifications. Each person who shall by authority of a license and excavation permit, excavate or take up any portion of any highway in the City of New Britain between street lines or in easement in right-of-way: (1) In the case of main line and laterals consisting of PVC (polyvinyl chloride) plastic sanitary or stormwater sewer pipe shall place a layer of three-quarters of an inch of trap rock six (6) inches under the pipe for support in order to bring the pipe up to the proper grade and also place trap rock twelve (12) inches on either side of the pipe and twelve (12) inches over the top of the pipe. A layer of six-mil polyethylene plastic or filter fabric over the stone to a minimum width of one foot wider than the trench. (2) In the case of main line sewer and water shall place a layer of three-quarters of an inch trap rock under the pipe to bring the pipe up to proper grade and also place trap rock around the pipe to its spring line. Said trap rock shall be wall tamped to prevent the pipe from shifting. (3) In the case of water and gas laterals and cable TV shall encase the same in a one-foot sand cushion. (4) In the case of a situation where material is found which is unsatisfactory to support the base the excavation shall be carried to a point of firm material provided that such point does not exceed a depth of twelve (12) inches below the pipe. Processed gravel shall be set in the excavation which layer shall be at least six (6) inches in depth. Filter fabric shall be laid over said processed stone and encompass all of the required three-quarters-inch stone as specified in subsection (1) and (2) above and shall overlap on top a minimum of eighteen (18) inches. If firm material is not found at a depth of twelve (12) inches below the pipe, the director of public works shall be notified immediately and he shall then direct the procedure which will be required. (b) Compaction. (1) From the top of the three-quarters of an inch stone on sewer, water or gas mains and over the services to buildings, there shall be a layer of fine material free from stone over one inch, twelve (12) inches over the top of the pipe. This material is to be tamped with a vibratory compactor in layers not to exceed six (6) inches in depth. The remainder of the backfill from twelve (12) inches above the top of pipe to twenty-eight (28) inches shall be backfilled with approved gravel in layers not to exceed twelve (12) inches and shall be compacted with a vibratory compactor to a dry density of ninety-five (95) per cent of dry density achieved by A.A.S.H.O. T-180, Method D. (2) Compaction of the backfill by jetting or puddling shall not be allowed unless so directed by the director of public works, in order to obtain the necessary compaction. Any trench improperly backfilled, or where settlement occurs within or beyond the trench lines, shall be reopened to the depth required for proper compaction, then refilled with processed gravel and compacted until the surface is restored to the required grade and compaction, at the permittee's expense. (c) Back fill material. Approved bank run gravel or approved excavated material shall be used for backfilling up to twenty-eight (28) inches below the road surface. The next twenty-five (25) inches will be filled with processed stone. The contractor shall furnish all the bank run gravel, backfill, processed gravel backfill and all materials necessary for the temporary repairs and maintain such until permanent pavement, sidewalk and curb repairs are made. (d) Temporary road repairs. All trenches excavated in roadways will be carefully backfilled, and then provided with a temporary surface of three (3) inches bituminous material firm enough to prevent scattering and raveling. As the fill settles, new bituminous must be added and compacted. Trenches in traveled roads must not be crowned up above the adjoining surface. The director of public works may order a temporary surface specified above the roadways in any location where he deems public convenience requires it. (e) Permanent repairs to pavement. (1) Permanent repairs to pavement shall be made in any trench within the traveled roadway and shall not be made until such time as daily temperatures are forty (40) degrees Fahrenheit or higher and only after such time as the temporary road repairs have been subjected to vehicle traffic or other means so as to thoroughly consolidate the fill in the trenches. If temperature conditions permit, permanent pavement repairs will be made no earlier than sixty (60) days after completion of excavation and no later than ninety (90) days thereafter or as soon as possible thereafter, coincident with temperature considerations. Restoration of cuts is to be made during the months of April through November 15, so as to have a minimum of unrestored cuts during the winter months. (2) When daily temperatures are below forty (40) degrees Fahrenheit, permanent repairs to pavement shall not be made. (3) For permanent repairs to pavement the trench shall be restored by cutting out square and excavating a section at least twenty-four (24) inches wider than the original width, twelve (12) inches, plus on both sides of the trench, and shall also include pavement damaged in surrounding area because of construction activity, trench failure due to lack of trench support, cracking of pavement, etc., in the immediate areas of the excavation. Depth of excavation shall be four (4) inches below the adjoining pavement. All edges shall be tack coated with liquid asphalt prior to being filled with permanent paving material to the full depth of the existing undisturbed pavement of the trench. In the trench excavation shall be placed a two and one-half (2½) inch course, when compacted of a bituminous concrete state highway specification Class I Binder Course. Then the finish course of one and one-half (1½) inches, when compacted, of bituminous concreted state highway Specification Class 2, shall be brought flush with the adjoining pavement and finished to match it and shall be in accordance with the general practice for the construction of a four-inch bituminous concrete pavement. The binder and surface course shall be rolled to compaction with a minimum of ten (10) ton tandem roller or an equivalent vibratory roller. Trench edges shall be sealed with a joint sealing material conforming to the State of Connecticut Department of Transportation Form 813 Section MO4.02 Joint Seal Material. (f) City to take action to repair trench excavation when excavator fails to do so after being notified. Upon the failure of the person to restore the street excavation within sixty (60) to ninety (90) days or as directed by the director of public works, the director shall notify the contractor's surety company to have the excavation repaired. If in the opinion of the director an emergency exists requiring the immediate repair of the trench, the same shall be restored and resurfaced by the department of public works or its hired contractor after notice to the contractor and its surety. The expense of restoring such pavement and of any repairs thereto made necessary during the maintenance period after such restoration due to the settling of the fill of such excavation shall be paid to the department of public works by the contractor by whom such pavement was taken up or such excavation made. Such expense shall constitute a debt recoverable by the city from the contractor and his surety. No person while indebted to the city for such expense shall make any excavations or take up any pavement under any license or permit then outstanding or to be issued nor shall any license or permits be issued to said person until said indebtedness is paid in full to the city. (g) Specifications available for inspection. General specifications of the city for all the above are available at the department of public works.

(Code 1970, § 20-44(a)—(d), (f)—(h); Ord. of 5-86, 13; No. 26824-1, 2-27-02)