For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-171 — Installation of water service

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 23-171

Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/cf1e4a2c-fd31-489b-91df-3b795fce6c5c

Sec. 23-171. - Installation of water service.

Corporation stops shall be installed by the water department only at the distribution main in the street. The charge for the installation of the corporation stop shall be at the rate established in [the] annual budget of the board of water commissioners and must be paid in advance by the owner of the property or its agent. The property owner or its agent shall excavate around the water main and properly shore the excavation site in order for the corporation stop to be installed by the water department. The water service line must lay in a straight line from the corporation stop to the inside of the building perpendicular to the distribution main. The water service line must have at least four (4) feet of cover to avoid freezing. All water service lines two (2) inches or smaller in diameter shall be type K, extra heavy, soft temper, cold drawn, seamless, deoxidized copper tubing, having a minimum ultimate tensile strength of not less than thirty thousand (30,000) pounds per square inch. Water service lines larger than two (2) inches shall be class 52 cement-line ductile iron pipe in accordance with ASA specifications. All water service lines shall have a shutoff valve as close to the property line as possible. The shutoff valve must be accessible through a curb box bottom and top section. No water service line shall be laid in the same trench with a building drain or sewer pipe. The water service line shall be no closer to any sewer pipe than six (6) feet at any point. The water service line installation shall be inspected and approved by a representative of the water department before being covered. If the water service line is covered prior to inspection, the water department representative will order the area to be uncovered and will not approve the line until an inspection has taken place and is approved.

(Ord. of 5-5-99)

Ask a question about New Britain law

Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.