§ 23-74 — Owner to provide sampling structure when required by commissioner
Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 23-74
Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/8dd06a93-ec2f-43e0-b5d9-51071033854c
Sec. 23-74. - Owner to provide sampling structure when required by commissioner.
When required by the commissioner, the owner of any property serviced by a public sanitary sewer carrying industrial wastes shall install a suitable structure together with such necessary meters and other appurtenances in the building sewer to facilitate observations, sampling, and measurement of the wastes. Such structure, when required, shall be accessible and safely located and shall be constructed in accordance with plans approved by the commissioner. The sampling structure shall be located at a point along the industrial waste stream where a representative sample of the industrial wastewater may be obtained prior to its being diluted by domestic sewage in the sanitary sewer connection. The structure shall be installed by the owner at his expense and shall be maintained by him so as to be safe and accessible at all times.
(Code 1970, § 19-13(5.10); Ord. of 3-82))
Ask a question about New Britain law
Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.
