230-145-40.20
Said plan shall contain, but not be limited to: A. A narrative describing: 1. the development; 2. the schedule for grading and construction activities including: a. start and completion dates; b. sequence of grading and construction activities; c. sequence for installation and/or application of soil erosion and sedimentation control measures; d. sequence for final stabilization of the project site. 3. the design criteria for proposed soil erosion and sediment control measures and storm water management facilities. 4. the construction details for proposed soil erosion and sediment control measures and storm water management facilities; 5. the installation and/or application procedures for proposed soil erosion and sediment control measures and storm water management facilities; 6. the operations and maintenance program for proposed soil erosion and sediment control measures and storm water management facilities. B. A site plan at a scale of at least one inch equals forty feet on sheets of either 18" x 24" or 24" x 36" in size prepared by a land surveyor licensed to practice in the State of Connecticut to show: 1. the location of the proposed development and adjacent properties; 2. the existing and proposed topography including soil types, wetlands, water courses and water bodies; 3. the proposed area alterations including cleared, excavated, filled or graded areas and proposed structures, utilities, roads and, if applicable, new property lines; 4. the existing structures on the project site, if any; 5. the location and details for all proposed soil erosion and sediment control measures and storm water management facilities; 6. the sequence of grading and construction activities; 7. the sequence and installation and/or application of soil erosion and sediment control measures; 8. the sequence for final stabilization of the development site. C. Any other information deemed necessary and appropriate by the applicant or requested by the Commission or its designated agent.
Ask a question about New Britain law
Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.