§ 49 — Regulation of wireless communications
Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Zoning Ordinance § 49
Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/e873b03f-9ce7-4243-8b76-53d1e29a495d
Section 49. - Regulation of wireless communications.
Description and purpose. These regulations exist to protect neighborhoods, minimize conflict with adjacent uses and the surrounding area, and to assure the health and safety of the public. The city recognizes the quasi-public nature of wireless communications systems and finds that these regulations are necessary to protect the ecological, scenic, historical and recreational values of the city and to ensure that adverse visual and operational effects will not contribute to blighting or deterioration of the surrounding neighborhood. More specifically, the purposes are: • To accommodate the need for wireless communications antennas while regulating their location and number. • To minimize adverse visual effects of wireless communications antennas and antennas or wireless site towers through proper design, siting and vegetative screening. • To avoid potential damage to adjacent properties from antennas or wireless site towers and falling ice through their proper siting and engineering. • To encourage the joint use of any new antennas or wireless site tower. • To reduce the number of antennas or wireless site towers needed in the future. (a) Definitions. When used in this section, the following words or phrases shall have the meaning defined below: ANTENNA: A device used to collect or transmit telecommunications or radio signals. Examples include panels, microwave dishes and single pole devices known as whips. ANTENNA HEIGHT: The vertical distance measured from the base of the antenna support structure at grade to the highest point of the structure. If the support structure is on a sloped grade, then the average between the highest and lowest grades shall be used in calculating the antenna height. WIRELESS SITE: The equipment and structures involved in receiving or transmitting telecommunications or radio signals from a mobile radio communications source and transmitting those signals to another wireless site, another communications source or receiver, or to a central switching computer which connects the mobile unit with land-based telephone lines. TOWER: A structure that is intended to support equipment used to transmit and/or receive telecommunications or radio signals. Examples of such structures include monopoles and lattice construction steel structures. (b) Site selection policies. Wireless sites shall be located in the following order of preference: (1) On existing structures such as buildings, communications towers and smokestacks. (2) In locations where the existing topography, vegetation, buildings or other structures provide the greatest amount of screening. On new towers on bare ground in business and industrial districts: (3) With visual mitigation. (4) Without visual mitigation in business and industrial districts. In residential districts: (5) On government or institutional structures. (6) On new towers with visual mitigation. (7) On new towers without visual mitigation. (c) Use regulations. (1) Application required. All applications for wireless sites and antennas shall be filed with the City of New Haven and concurrently with the Connecticut Siting Council filing if it is required. (2) The filing shall include a map showing the extent of planned coverage within the City of New Haven, approved locations of the applicant's other wireless sites in the city, and the location and service area of the proposed wireless site. (3) If the antenna is to be mounted on an existing structure and all associated equipment is contained within the structure or on its roof, a full site plan shall not be required. (d) Location constraints. (1) As-of-right. Any antenna that is attached to an existing communications tower, smoke stack, water tower, government or institutional building, or other tall structure is permitted in all zoning districts, subject to the following maximum height and other provisions: a. Omnidirectional or whip antennas shall not exceed 20 feet in height or seven inches in diameter. b. Directional or panel antennas shall not exceed six feet in height or two feet in width. c. Satellite and microwave dish antennas shall not exceed six feet in diameter and when building or rooftop mounted shall be located or screened so as not to be visible from abutting public streets. d. Materials and colors shall match the exterior of the building or structure, as may be determined by city staff. (2) An antenna may not be located on a building or structure that is listed on an historic register or is within an historic district, except by special permit from the City Plan Commission. (3) Special permit. An antenna that is not mounted on an existing structure or a new antenna or tower is permitted by special permit from the city plan commission in all districts, subject to the general standards of § 49(e) and review criteria of § 49(f). (e) General standards. The application shall include the following: (1) Site justification statement, including a description of the narrowing process that eliminated other potential sites. a. If a proposed antenna tower exceeds 200 feet height or is within 20,000 feet of Tweed-New Haven Airport, proof is required that the applicant has filed a notice of proposed construction with the Federal Aviation Administration. (2) Antenna height. The applicant shall demonstrate that the antenna is the minimum height required to function satisfactorily. No antenna that is taller than this minimum height shall be approved. (3) Antenna tower setback. If a new tower is constructed (as opposed to mounting the antenna on an existing structure, the minimum distance between the base of the tower and any guy wire anchors or any property line shall be the largest of the following: a. 30% of antenna height. b. The minimum setback in the underlying zoning district. c. 40 feet. (4) Roof mounted antenna. If the equipment is located on the roof of a building, the area of the equipment building and other equipment structures shall not occupy more than 25% of the roof area. Setbacks from roof edge shall be 10 feet, or 10% of roof depth (measured from edge facing public street to opposite edge of roof), whichever is greater. (5) Antenna tower safety. The antenna tower shall be designed and constructed to all applicable standards of the American National Standards Institute, ANSI/EIA-222-E manual, as amended. (6) Site soil report. A soil report complying with Appendix I: Geotechnical Investigations, ANSI/EIA-222-E manual standards, as amended, shall be submitted to verify the design specifications of the foundation for the tower and anchors for the guy wires, if used. (7) Fencing. Unless the antenna is mounted on an existing structure, a fence with a maximum height of eight feet shall be required around the tower and other equipment. (8) Landscaping. To soften the appearance of a wireless site and screen as much of the tower as possible, a fence surrounding the tower and other ground level features such as a building, ground landscaping shall be required. (9) Any combination of existing vegetation, topography, walls, decorative fences or other features instead of landscaping may be permitted if the same degree of screening as the required landscaping is achieved, as determined by the executive director (or designee) of the City Plan Department. a. An evergreen screen shall be required to surround the site. The screen can be either a hedge (planted three feet on center maximum) or a row of evergreen trees (planted ten feet on center maximum). The evergreen screen shall be a minimum height of six feet at planting and shall grow to a minimum of 15 feet at maturity. b. Existing vegetation on and around the site shall be preserved to the greatest extent possible. (10) Commercial advertising shall not be allowed on an antenna or antenna tower. (11) Signal lights or illumination shall not be permitted unless required by the Federal Communications Commission (FCC) the Federal Aviation Administration (FAA) or the Connecticut Siting Council. (12) All other uses ancillary to the antenna and associated equipment (including a business office, maintenance depot, vehicle storage, etc.) are prohibited. (13) Joint use accommodated. To minimize the number of antenna or wireless site towers in the community in the future, the proposed support structure shall be required to accommodate other users, including other wireless communication companies and local police, fire and ambulance companies unless it is determined to be technically unfeasible based on information submitted by the applicant. The city may require independent outside evaluation of such materials at the applicant's expense. (14) The related unmanned equipment and/or building(s) shall not contain more than 750 square feet of gross floor area or be more than twelve feet in height. (f) Standards for special permit approval. (1) Using technological evidence the applicant must demonstrate that the proposed location is necessary to satisfy its function in the company's grid system. Specific locations will be evaluated using the following criteria (not listed in any order of priority). • Availability of suitable structures for antenna mounting. • Topography as it relates to line of sight transmission for optimum service efficiency. • Leasable lands and willing landlords. • Screening potential of existing vegetation, structures and topographic features. • Compatibility with adjacent land uses. • Least number of sites to cover desired area. • Greatest coverage consistent with physical requirements. • Opportunities to mitigate possible visual impact. • Availability of sites not within an established single-family community. • Preservation of view corridors, vistas. • Potential for preservation of pre-existing character of site. • Minimal impact on residential areas surrounding commercial or industrial zoned sites. • Selection of sites which lend themselves to visual mitigation. • Availability of road access. • Availability of electric power. • Availability of land based telephone lines or microwave link capability. If a tower is proposed the application shall include support materials that show the location of tall structures within one quarter mile radius of the site proposed, that the owners of those locations have been contacted and asked for permission to install the antenna on those structures and denied for other than economic reasons. This would include smoke stacks, water towers, tall buildings, antennas or towers of other wireless communications companies, other communication towers (fire, police, etc.) and other tall structures. The City Plan Commission may deny an application to construct a new tower if it is determined that the applicant has not made a good faith effort to mount the antenna on an existing structure. (g) Certificate of continued use. The owner of the subject property shall submit to the zoning administrator annually during the month of January an affidavit that the facility is in active use as a wireless site and the owner or operator shall certify that such use will continue for the coming calendar year. (h) Abandonment. A wireless site not in use for six (6) months shall be removed by the service facility owner. This removal shall occur within 90 days of the end of such six-month period. Upon removal the site shall be restored to its previous appearance and, where appropriate, revegetated to blend with the surrounding area.
Ask a question about New Haven law
Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.
