§ 58 — Soil erosion and sediment control
Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Zoning Ordinance § 58
Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/dc05b40a-2c4c-4498-801f-64d83c02f921
Section 58. - Soil erosion and sediment control.
(a) Purpose: The purpose of soil erosion and sediment control is to minimize land form change that occurs as a result of development, to preserve the nature of a site, to sustain aesthetic, recreational and fish and wildlife habitat and values, to maintain the capability of soil to support vegetation, to reduce sediment entering water bodies and sewers, and to conserve and protect the water, land, air, and other environmental resources of the City. (b) Authority: The provisions of Public Act 83-388, entitled "An Act Concerning Soil Erosion and Sediment Control", and Sections 8-2 and 8-25 of the Connecticut General Statutes, as amended. (c) Definitions: For the purposes of this Section, certain words, terms, and phrases shall have the meanings presented in this subsection. All words used in the present tense include the future tense, and the word "used" shall be deemed to include "designed, intended, or arranged to be used". Words not defined in this Section shall be as defined in the most current edition of Webster's New World Dictionary, College Edition. Agricultural activities: Cultivation of the soil, dairying, forestry, raising or harvesting any agricultural or horticultural commodity, including livestock, or the operation, management, conservation, improvement, or maintenance of a farm and its buildings, tool, and equipment. Approval: A signed, written document constituting a finding by the City Plan Commission that a Soil Erosion and Sediment Control (SESC) plan complies with the applicable requirements of this Section. Commission: The City Plan Commission of New Haven, Connecticut, or its designated agent. County Soil and Water Conservation District: The New Haven County Soil and Water Conservation District established under Section 22A-315(A) of the General Statutes of the State of Connecticut. Date of receipt: The day of the next regularly scheduled meeting of the Commission immediately following the day of submission of an application to the Commission, provided such meeting is no earlier than three (3) business days after submission, or thirty-five (35) calendar days after such submission, whichever is sooner. Development: Includes, but shall not be limited to, any construction or grading activities to improved or unimproved real property. Disturbed area: An area where the ground cover is destroyed or removed leaving the land subject to accelerated erosion. Erosion: The detachment and movement of soil or rock fragments by water, wind, ice, or gravity. Forestry: An on-going commercial forestry operation. Grading: Any excavating, grubbing, filling (including hydraulic fill), removal, or stockpiling of earth materials or any combination thereof including the land in its excavated or filled condition. Inspection: The periodic review of sediment and erosion control measures required by the approved SESC plan. Sediment: Solid material, either mineral or organic, that is in suspension, is transported, or has been moved from its site of origin by erosion. Soil: Any unconsolidated mineral or organic material of any origin. Soil erosion and sediment control (SESC) plan: A clear delineation of specific measures that minimize or eliminate soil erosion and sedimentation resulting from development. Such plan shall include, but is not limited to, an application form, a narrative, and a map or maps. The narrative shall describe the project, the schedule of major activities on the land, the application of conservation practices, design criteria, construction details and the maintenance program for any erosion and sediment control facilities that are installed. The map(s) shall show topography, cleared and graded areas, proposed area alterations map(s) and the location of and detailed information concerning erosion and sediment measures and facilities. (d) When an application is required: (1) No SESC permit shall be issued for a building, sue or structure unless the building, use or structure is exempted in accord with the provisions of subsection (e) of this section, or has been reviewed and approved in writing by the Commission in accordance with the provisions of this section. Projects that do not require a SESC plan or are exempt under subsection (d) below must still conduct soil and erosion control measures consistent with the Connecticut Guidelines For Soil Erosion And Sediment Control (2002 or latest edition). (2) A soil erosion and sediment control plan (hereinafter SESC plan shall be submitted with any application for development when (I) the site of such development is one-half acre or more, unless exempted in subsection 58(e) below; or (II) more than 30% the total lot area will be regarded by more than two feet; or (III) more than 800 cubic yards of soil and/or rock will be moved, removed or added; or (IV) the site contains slopes of greater than 15 percent; or (V) the application pertains to any site within the coastal boundary as defined in Section 22A-94 of the General Statutes. (e) Exempt activities: (1) Single family dwelling exempt. Construction of a single family detached dwelling that is not part of a subdivision or larger development of land shall be exempt, provided that there is no grading or excavation on the lot more than four feet beyond the perimeter of the dwelling itself and the site does not contain slopes of greater than 15 percent within 50 feet of the disturbed area. It is the intent of this ordinance not to allow a fragmented parcel-by-parcel development of a subdivision without required erosion and sediment control provisions. (2) Existing activities exempt. Any regulated activity legally existing as of the effective date of this section shall be exempt therefrom and permitted to continue within any time limits previously established provided that no new or additional regulated activity requiring approval under is conducted after the effective date without such approval. If originally approved time limits expire before completion (not including any extensions of such time limits), approval shall be required for remaining work unless such extensions were approved prior to the effective date. (3) Defined agricultural activities exempt. The following agricultural activities are exempt from this section: (i) cultivation of the soil, dairying, forestry, raising or harvesting any agricultural or horticultural commodity, including livestock; or (ii) operation, maintenance, conservation, improvement, or management of a farm and its buildings, tools, and equipment. The Commission which has jurisdiction or a designated agent thereof shall have the power to determine if an activity is exempt from this section. Such determination shall be in writing and a file of exemptions shall be maintained. For the convenience of an applicant, lender, seller, buyer, or other interested party, a written determination of exempt activity may be requested. Such written request shall be accompanied by a fee payable to the City of New Haven in accord with Section 17-22 of the Code of Ordinances. (f) SESC plan requirements: (1) SESC plan. When any person intends to conduct an activity that is not specifically exempted in these regulations a SESC Plan shall be filed. The SESC plan shall include an application form, a narrative, and a map, as described below. (2) Classification and filing fees. Each SESC plan submitted to the Commission for Approval shall be accompanied by a filing fee payable to the city in accord with section 17-22 of the Code of Ordinances of the City of New Haven. Staff shall determine the filing fee based on the anticipated level of disturbance from a preliminary review of submitted materials. A SESC plan shall be classified as: Class A (minimal impact) Class B (significant impact) Class C (significant public effect, public hearing required) The applicant may appeal the classification to the commission, which shall make a final determination as it may deem appropriate upon a review of the submitted materials, and may adjust the fee in accord with the Schedule of Fees of Section 17-22 of the Code of Ordinances. (3) Application form. The application for SESC plan review shall be on a form provided by the Commission. The Commission may prescribe such forms, contents, and rules as it deems necessary for the filing of SESC plans and other matters not specified in this section. All application forms shall include the following information: a. The applicant's name, address and telephone number; and b. The owner's name (if applicant is not property owner), home and business address, telephone number(s) and written consent to the proposed activity set forth in the application; and c. Applicant's legal interest in the land (i.e., owner, option holder); and d. The geographical location of the property which is to be affected by the proposed activity (Tax Assessor's Map(s), Block(s) and Parcel number(s) of the subject property or properties). e. Certification that the applicant is familiar with all the information provided in the application and is aware of the penalties for obtaining a permit through deception or through inaccurate or misleading information; f. Authorization for the members and agents of the Commission, the City Engineer and the Building Department to inspect the property at reasonable times, both before and after a finding has been issued. (4) Narrative. A narrative shall be filed which describes provisions to adequately control erosion and sedimentation and reduce the danger from stormwater runoff, both on and off site during and after construction based on the best available technology. Such principles, methods and practices necessary for approval are found in the Connecticut Guidelines for Soil Erosion and Sediment Control (2002 or latest edition). Alternative principles, methods and practices may be used with prior Commission approval, if recommended by the City Engineer. Emphasis shall be placed on prevention of erosion and vegetative or non-structural control measures. The narrative may be included on the site plan map(s), and shall describe the development, including the schedule for grading and construction activities, with: a. Start and completion dates; and b. Sequence of grading and construction activities; and c. Phasing of project, if applicable; and d. Sequence for installation and/or application of SESC measures; and e. Sequence for final stabilization of the project site. f. The construction details for proposed SESC measures and storm water management facilities. g. The installation and/or application procedures for proposed SESC measures and stormwater management facilities. h. The operations and daily maintenance program for proposed SESC measures and stormwater management facilities. i. The individual responsible for monitoring control measures, with office address and telephone number(s) for 24 hour a day contact. j. Provisions for contingency plans if unforeseen erosion or sedimentation problems arise, including emergency situations caused by storms. k. Any features of the site which may be particularly vulnerable to erosion, such as ridge tops, swales, and soil types and control measures specific to these features shall be noted (soil types may be found in the Soil Survey of New Haven County). (5) Map. A map or maps shall be filed to accompany the application required in the SESC Regulations. No map shall be deemed complete unless it shall be in such form and contain such information as the Commission deems necessary for a fair and full determination of the issues. A site visit and field report may be deemed necessary. The map(s) shall include, at a minimum, the following information: a. A site plan map(s). The suggested scale of the map is 1 inch = 40 feet with one-foot contour intervals, but may be more or less detailed to meet specific site needs. b. A north arrow, street names, scale, date prepared, and name of preparer. c. Location of the proposed development and adjacent properties, including all buildings within 25 feet of the property line. d. Existing and proposed topography showing one-foot contours, including flood zones, wetlands, watercourses, water bodies, and soil types if pertinent. e. Existing vegetation and natural resources on the site including major trees and proposed changes. f. Existing structures on the project site, including but not limited to paving, fencing, buildings, and archaeological sites. g. Proposed alterations including cleared, excavated, filled or graded areas and proposed structures, utilities, roads and, if applicable, new property lines. h. Location of and design details for all proposed SESC measures and storm water management facilities over the period of construction. i. The construction details for proposed SESC measures and storm water management facilities. j. The Commission may require map preparation by a Connecticut licensed engineer. (6) A-2 survey may be required. The Commission may require a Type A-2 survey. (7) Additional information may be required. Any other information deemed necessary and appropriate by the applicant or requested by the Commission or its designated agent shall be included in the SESC plan. (8) Information binding. All information submitted for review in the SESC plan shall be considered factual, or in the case of an anticipated activity, binding. A failure of the applicant or any agents thereof to provide correct information or to conduct development activities within the levels anticipated in the approved SESC plan shall be sufficient grounds for penalties to be imposed. Each day of violation or deception shall be considered as a separate offense. (g) Minimum acceptable control standards. (1) Minimum standards for individual control measures. The Connecticut Guidelines for Soil Erosion and Sediment Control (2002 or latest edition) shall be the standard. The Commission may grant exceptions when requested by the applicant, if the City Engineer presents and recommends technically sound reasons. SESC plans shall result in a development that minimizes erosion and sedimentation during construction; is stabilized and protected from erosion when completed; and does not cause off-site erosion and/or sedimentation. (2) Determination of peak flow rates and volumes of runoff. The appropriate method from the Connecticut Guidelines for Soil Erosion and Sediment Control (2002 or latest edition) shall be used unless an alternative method is approved by the Commission, following the favorable recommendation of the City Engineer. (h) Issuance of finding. (1) Issuance of finding required. The Commission which has jurisdiction shall make a finding of approval if the SESC plan as filed, or with conditions of approval it may impose, complies with the requirements and objectives of this section, or denial if the development proposal does not comply with this section. A finding of approval, approval with conditions, or denial shall be made in writing within sixty-five (65) days of the date of Commission receipt of the completed SESC Plan or within 65 days of the close of the public hearing if one is held. (2) Extension of time for approval. The applicant may consent to one or more extensions of any period specified herein, provided that the total extension of all such periods shall not be for longer than 65 days, or may withdraw the application. (3) Referral to County Soil And Water Conservation District. Following receipt of an application a copy of any SESC plan submitted to the municipality may be referred to the County Soil and Water Conservation District for review. The District may make recommendations concerning such plan, provided such review shall be completed within 15 days of the receipt of the plan. (4) Referral to city engineer. Following receipt of an application a copy of the SESC plan may be referred to the city engineer, who may return comments on the plan to the Commission within 15 days of receipt of the plan. Such comments shall be advisory only. (5) Optional referrals. The commission may forward a copy of the development proposal to any other commission or review agency or consultant for review and comment. (6) Public hearing may be required. The Commission may, at its discretion, hold public hearings. (7) Notice if public hearing required. Notice of a public hearing shall be published at intervals of not less than two days, the first not more than 15 days and not fewer than ten days, and the last not less than two days before the date set for the hearing in a newspaper having a substantial circulation in the City of New Haven. Notices of hearings shall be sent to the applicant at the address provided. (8) Notices by applicant if public hearing required. The Commission shall give written notice to adjacent owners of record within 200 feet, not less than seven work days prior to the public hearing. A copy of the mailing list and notice shall be filed with the City Plan Department. (9) Public inspection of documents. All applications, maps, and documents relating to a public hearing shall be open for public inspection in the City Plan Department not less than 15 days prior to the day of the public hearing. (10) Hearing continuation. Where possible, public hearings shall be completed in a single session. However, the public hearing may, consistent with the legal deadlines for conducting a hearing, be continued (to a date certain) where necessary for the full development of the evidence, or for the full and adequate participation of the parties, or for such other substantial purposes. In no case shall continuances be used as a device for delay. (11) Completion of hearing. The public hearing must be scheduled within 65 days of receipt of the application and shall be completed within 35 days of its commencement. Action shall be taken on applications within 65 days after completion of the public hearing. (i) Conditions of plan approval. (1) Standard and optional conditions of approval. The Commission with jurisdiction may establish such conditions of approval as binding requirements for an SESC plan as it deems necessary to fulfill the purposes of this ordinance. In addition the following conditions shall apply to all approved SESC plans. a. Performance sureties. The Commission may require a performance bond with sureties or other binding financial instrument in an amount and in a form approved by the Commission as a condition of approval of the Plan, and may cover corrective measures, if required. The bond and sureties shall be conditioned on compliance with all provisions of this ordinance and conditions of approval of the Plan. b. Public liability insurance certification. The applicant may be required to certify that he or she has public insurance against liability which might result from the proposed operation or use covering any and all damages which might occur within one year of completion of such operations, in an amount to be determined by the Commission commensurate with projected operation and the potential for damage on or off site. c. City held harmless. The applicant shall hold the City of New Haven harmless from damages arising out of the regulated activities. d. Start of work. Site development shall not begin unless the SESC plan is approved and those control measures and facilities in the SESC plan scheduled for installation prior to site development are installed and any required bond is posted. e. Contractors to be informed. The approved SESC plan soil erosion and sediment control measures and facilities shall be installed as scheduled and all contractors shall be made aware of the requirements of the approved SESC plan and shall work in accordance with its provisions. f. Measures required to be maintained. All control measures and facilities shall be maintained in effective condition to ensure compliance with the approved SESC plan. (j) Inspections. (1) Site inspection may be required for approved SESC plan. Site inspections may be made by the Commission during development to ensure compliance with the approved SESC plan. A site inspector shall determine that control measures and facilities are properly performed or installed and maintained throughout the construction period. The applicant, or an agent thereof, shall have the approved SESC plan document readily available at the job site and shall make the document available for inspection upon request. (2) Applicant report. The commission may require the applicant to verify through progress reports that soil erosion and sediment control measures and facilities have been performed or installed according to the approved SESC plan and are being operated and maintained. (3) Additional control measures. If, upon inspection of the site, the site inspector determines that the control measures in place are not adequate to control erosion, additional measures may be required to be immediately installed by the inspector. Any such request for additional control measures shall be made in writing and shall be brought to the attention of the Commission within five working days of the inspection. (k) Enforcement. (1) Delegation of enforcement. The Commission or a designated agent thereof, such as the Zoning Enforcement Officer or staff of the City Plan Department or City Engineer, shall have the power to enforce these Regulations. (2) Violation if plan not filed. Any person engaged in development activities who fails to file a SESC plan in accordance with this section, or who conducts a development activity except in accordance with provisions of an approved SESC plan shall be deemed in violation of this section. (3) Violation penalties. Should any person be found to be in violation of this section, a written order may be issued by certified mail to that person to immediately correct the condition causing the violation. The Superior Court of the State of Connecticut, in any action brought by the Commission, the City of New Haven, or any person, shall have jurisdiction to restrain a continuing violation of this section or to issue orders directing that the violation be corrected or removed. (l) Duration of approval; lapse of approval; renewal; transferability; revocation. (1) Duration of approval. Pursuant to Section 8-3(i) of the Connecticut General Statutes, any site plan approved after June 30, 2011 is valid for a period of five years after the date of decision. Upon petition of the applicant, the Commission may, at its discretion, grant extensions totaling no more than an additional five years to complete all work connected to the original approval. Pursuant to Section 8-3(m) of the Connecticut General Statutes, any site plan approved prior to July 1, 2011 and that has not already expired prior to May 9, 2011 is valid for a period of nine years after the date of decision. Upon petition of the applicant, the Commission may, at its discretion, grant extensions totaling no more than an additional five (5) years to complete all work connected to the original approval. (2) Lapse of approval. Consistent with Section 62, the Zoning Enforcement Officer shall determine the status of an approval and make a determination if the approval is valid or if the approval has lapsed. (3) Transferability. The validity of an approval shall not be affected by changes in ownership.
(Ord. No. 1662, 9-19-11; Ord. No. 1662, 9-19-11)
Ask a question about New Haven law
Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.
