For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 60 — Stormwater management plans

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Zoning Ordinance § 60

Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/98b0d4c8-aaa1-4e2b-b144-60150f11f21c

Section 60. - Stormwater management plans.

(a) Purpose and authority. Increased development without proper consideration of stormwater impacts can be a significant source of pollution to Long Island Sound, its tributaries, and other waters of the state. The state's water resources are valuable natural, economic, recreational, cultural, and aesthetic resources. The protection and preservation of these waters is in the public interest and is essential to the health, welfare, and safety of the citizens of the City of New Haven. It is, therefore, the purpose of this ordinance to protect and preserve the waters within New Haven from nonpoint sources of pollution through the proper management of stormwater flows and minimization of inputs of suspended solid, pathogens, toxic contaminants, nitrogen, and floatable debris to these flows. (b) Definitions. Aquifer: Geologic formation, group of formations, or part of a formation that contains sufficient saturated, permeable materials to yield significant quantities of water to wells and springs. BMPs—best management practices: Techniques or structural devices that are effective practical ways of preventing or reducing pollution. First inch of rain: The first inch of rainfall during a single event. Groundwater: Water found beneath the ground surface that completely fills the open spaces between particles of sediment and within rock formations. Impervious surface: Material or structure on, above, or below the ground that does not allow precipitation or surface water to penetrate directly into the soil. Sediment: Solid material, either mineral or organic, that is in suspension, is transported, or has been moved from its site or origin by erosion. Site: A single parcel, together with any adjacent waters, which is the subject of an application for zoning approval, coastal site plan review, or an inland wetlands permit. Trash hood: Feature in a catch basin which traps debris such as litter and keeps it from being discharged from the catch basin. Urban stormwater runoff: Precipitation that falls onto the surfaces of roofs, streets, parking lots, roads, and the grounds of developed areas. Urban precipitation is not absorbed by the ground or retained in its surface, but collects and runs off, carrying a wide variety of pollutants such as oil-based contaminants, heavy metals (copper and lead), nutrients, and bacteria. (c) Application requirements. A stormwater management plan shall be included as a part of any application for zoning approval (including but not limited to special permit and special exception), coastal site plan review, or an inland wetlands permit where: (1) The application pertains to a development or construction disturbing one-half or more acres of total land area on a site; or (2) The application pertains to any site with one-half acre or more of existing and/or proposed impervious cover; or (3) The application proposes new residential development of three or more units; or (4) The application pertains to any new or expanding industrial or commercial use which increases the amount of on-site impervious surface by more than 500 square feet; or (5) The application pertains to any site within the coastal boundary as defined in section 22a-94 of the General Statutes; or (6) The commission which has jurisdiction over the application has required submission of a stormwater management plan pursuant to written findings by that commission that the activity proposed in the application has the potential to cause significant nonpoint source pollution to groundwater or surface water drinking supplies, or to Long Island Sound, or any other waters of the state. If the commission which has jurisdiction determines that the activity proposed in an application may result in significant nonpoint source pollution to groundwater or surface water drinking supplies, or to Long Island Sound or any other waters of the state, it may refer the application, including the stormwater management plan, to the Commissioner of Environmental Protection for a determination as to whether a discharge permit under section 22a-130 of the General Statutes, or other state authorization, is required. The commission which has jurisdiction over the application may, upon request, waive some or all of the requirements of this section if it makes a finding based on the proposed project that such requirements are not necessary to determine the impact of the proposed project on the surface or groundwater of the state. (d) Contents of stormwater management plan. Where a stormwater management plan is required, such plan shall provide, at a minimum, the following information: (1) Soil characteristics of the site. (2) Location of the closest surface water bodies and wetlands to the site, and the depth to any groundwater or aquifer areas on or adjacent to the site. In the case of tidal waters, provide the mean high water and high tide elevations. (3) DEP ground and surface water quality classification of waterbodies on and adjacent to the site. (4) Identification of any waterbodies on and adjacent to the site documented by DEP as not meeting water quality standards. (5) Location and description of all proposed stormwater control BMPs for both construction activities and post-construction, long-term stormwater control. (6) Proposed operation and maintenance manual and a schedule for maintaining any trash hoods, catch basins, or other BMP devices used to prevent runoff, facilitate sheet flow or infiltration, or treat stormwater. (7) Calculations of stormwater runoff rates, suspended solids removal rates, and soil infiltration rates before and after completion of the activity proposed in the application. (8) A hydrologic study of pre-development site conditions. Hydrology studies shall be conducted at a level of detail commensurate with the probable impact of the proposed activity and should extend downstream to the point where the proposed activity causes less than a five percent change in the peak flow rates. (e) Standards and criteria for decision. In order to approve any application for which a stormwater management plan is required, the commission shall find the stormwater management plan consistent with the following criteria: (1) Direct channeling of untreated surface water runoff into adjacent ground and surface waters shall be prohibited. (2) No net increase in the peak rate or total volume of stormwater runoff from the site, to the maximum extent possible, shall result from the proposed activity. (3) Design and planning for site development shall provide for minimal disturbance of pre-development natural hydrologic conditions, and shall reproduce such conditions after completion of the proposed activity, to the maximum extent feasible. (4) Pollutants shall be controlled at their source to the maximum extent feasible in order to contain and minimize contamination. (5) Stormwater management systems shall be designed and maintained to manage site runoff in order to reduce surface and groundwater pollution, prevent flooding, and control peak discharges and provide pollution treatment. (6) Stormwater management systems shall be designed to collect, retain, and treat the first inch of rain on-site, so as to trap floating material, oil, and litter. (7) On-site infiltration and on-site storage of stormwater shall be employed to the maximum extent feasible. (8) Post-development runoff rates and volumes shall not exceed pre-development rates and volumes for various storm events. Stormwater runoff rates and volumes shall be controlled by infiltration and on-site detention systems designed by a professional engineer licensed in the state of Connecticut except where detaining such flow will affect upstream flow rates under various storm conditions. (9) Stormwater treatment systems shall be employed where necessary to ensure that the average annual loadings of total suspended solids (TSS) following the completion of the proposed activity at the site are no greater than such loadings prior to the proposed activity. Alternatively, stormwater treatment systems shall remove 80 percent TSS from the site on an average annual basis. (10) Use of available BMPs to minimize or mitigate the volume, rate, and impact of stormwater to ground or surface waters.

(Ord. No. 1662, 9-19-11)

Ask a question about New Haven law

Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.