§ 64 — City Plan Commission
Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025) · New Haven Zoning Ordinance § 64
Corpus is an independent public-information project, not the official City of New Haven website. Stable reference: corpuslaw.us/code/c6ee8f4d-0b8a-4d5c-a205-49200aac4e05
Section 64. - City Plan Commission.
(a) Continuous ordinance review. The City Plan Commission and its staff shall carry on a continuous review of the effectiveness and appropriateness of the zoning ordinance, and recommend such changes as they see fit. (b) Advice to other agencies. The City Plan Commission and its staff shall give such technical advice as they deem appropriate to the zoning enforcement officer, the Board of Zoning Appeals, and other agencies. (c) Maintenance of zoning map. The City Plan Commission and its staff shall keep up to date the official zoning map, and shall keep the zoning enforcement officer and the City Clerk supplied with a current copy of such map. (d) Amendment of the ordinance. (1) Petitions for amendment of the text of the zoning ordinance or the zoning map shall be filed with the City Clerk for transmission to the Board of Aldermen, and shall thereafter be referred and acted upon by the City Plan Commission and the Board of Aldermen as provided in sections 183 and 184 of the New Haven Charter. All such petitions may also be referred to any Neighborhood Planning Agency (NPA) of jurisdiction as defined in section 1 of this Ordinance which may issue an advisory report on the proposed zoning amendment to the Board of Aldermen prior to final aldermanic action. Any such petition shall contain sufficient information, including maps where necessary, to indicate the exact change or changes which are sought. The zoning enforcement officer shall be kept informed by the City Clerk of pending petitions. (2) In passing upon any such petition, the City Plan Commission shall take into account the various factors favoring and disfavoring a change, such as, but not limited to, the following: a. Errors in the existing ordinance, changes that have taken place in the city and in patterns of construction and land use, the supply of land and its peculiar suitability for various purposes, the effect of a map change on the surrounding area, the purposes of zoning and the comprehensive plan of the City of New Haven; b. Whether some other method or procedure under the zoning ordinance is more appropriate; and c. In the case of a map change, the size of the area involved. As a general policy, the City Plan Commission shall not consider favorably any petition which would result in a total contiguous area (separated only by streets, and excluding the area of streets) of less than two acres in the case of a residence district, less than one acre in the case of a Business District, or less than four acres in the case of an Industrial District. (e) Special permits—Statement of purpose. The development and execution of a comprehensive zoning ordinance is based upon the division of the city into districts, within which the use of land and structures and the bulk and location of structures in relation to the land are substantially uniform. It is recognized, however, that there are certain uses and features which, because of their unique characteristics, cannot be distinctly classified or regulated in a particular district or districts, without consideration, in each case, of the impact of such uses and features upon neighboring uses and the surrounding area, compared with the public need for them at particular locations. Such uses and features are therefore treated as special permits. (1) Special permit defined. A land use permitted when the City Plan Commission finds that the standards for the use as contained within this Ordinance have been met. Only those uses designated as needing a special permit in section 42: Use Table and in Table 1: Permitted Uses in Residential Districts may be permitted by special permit. (2) Finding required. Special permits shall be granted only where the City Plan Commission finds that the proposed use or feature or the proposed extension or substantial alteration of an existing use or feature is in accord with the public convenience and welfare after taking into account, where appropriate: a. Burden of proof. A special permit shall not be considered an entitlement, and shall be granted by the Commission only after the applicant has demonstrated to the satisfaction of the Commission that all ordinance requirements are met. b. Ordinance compliance. The proposed use shall comply with all applicable regulations, including any specific standards for the proposed use as set forth in this ordinance. Any accessory use to a special permit must receive express authorization from the commission. c. Comprehensive Plan of Conservation and Development. The commission shall determine if the proposed special permit's use and improvements comply with the City's development plans. d. Natural features. Special permits must preserve trees and other natural site features to the greatest extent possible so as to minimize their impact upon surrounding properties and the district, and must not have an adverse impact on significant scenic vistas or on significant wildlife or vegetation habitat. e. Hazard protection. The proposed use shall not have a detrimental impact upon the use or peaceable enjoyment of abutting or nearby properties as a result of vibrations, fumes, odor, dust, erosion, sedimentation, flooding, fire, noise, glare, hazardous material use, storage, transportation or disposal, or similar conditions. f. Historic preservation. Features of historic significance shall not be significantly adversely affected by the granting of any special permit. If the subject property is within or abuts a historic district, the Commission may request a report from the Historic District Commission regarding those features essential to preserve the historical integrity of a building, district, or site or historical significance. g. Design and architectural compatibility. The operational and physical characteristics of the special permit shall be compatible with the surrounding area and the neighborhood in which it is proposed. Site design and architectural features which contribute to compatibility include, but are not limited to, landscaping, drainage, access and circulation, building style and height, bulk scale, setbacks, open areas, roof slopes, building orientation, overhangs, porches, ornamental features exterior materials and colors. h. Property values. The use and site design shall not have a detrimental effect on the property values in the surrounding area. i. Traffic impact. The applicant shall demonstrate how the proposed use will not adversely affect the safety and convenience of vehicular and pedestrian circulation on, adjacent or nearby the site. The commission may require a traffic impact study be submitted to it by the applicant for any special permit use of land. The study shall consider traffic patterns and adequacy of proposed off-street parking and loading resulting from the proposed development. (3) Notice required. Public notice and hearing shall be furnished in accordance with the Connecticut General Statutes. (4) Filing fee. Each application for a special permit shall be accompanied by such fee as may be stipulated by the Commission of Aldermen from time to time in Section 17-22 of the City of New Haven Code of Ordinances. (f) Site plan standards and procedures: (1) Purpose. A site plan application is required to aid the City in determining the conformity of a proposed building, use, or structure with specific provisions of the Zoning Ordinance as adopted by the Board of Aldermen. (2) Applicability. Site plan approval shall be required for the following: a. All variance, special permit and special exception applications when required as a condition of approval; b. Any new construction or change in an existing use for three or more dwelling units, whether in a single structure or in multiple structures, whether in new structures or converted space; c. Any new construction or change in an existing use involving 5,000 or more square feet of gross building area; d. Any new construction or change in an existing use involving ten or more parking spaces; e. Any use involving a drive up service window or facility; f. Other uses and applications as specified in these regulations. g. Applications for coastal site plan review, inland wetlands review, and soil erosion and sediment control plan review shall meet the submission requirements of this section. Additional data as required by section 55, coastal management district, section 57, inland wetlands and watercourses, and section 58, soil erosion and sediment control shall be noted on submitted site plans as applicable. (3) Application submission requirements. Applications for site plan approval shall include the following: a. Completed application form and fee in accord with section 17-22 of the Code of Ordinances. Checks shall be made payable to Treasurer, City of New Haven. b. A written narrative describing the proposed use or development in sufficient detail to determine zoning compliance. c. A site development plan complying with section 64(f)(5) of these Regulations. (4) Standards for site plans—General. Site plans shall be prepared by appropriate design professionals (surveyor, engineer, architect, and or landscape architect) licensed to practice in the state and shall bear appropriate registration stamps. All drawings shall be at a scale of not less than one inch equals 40 feet. All site plan drawings shall be in sufficient detail and accuracy, (generally A-2), to enable the construction of all site improvements shown and approved on the drawings. Four copies of the site plan, application, narrative and all supporting materials shall be submitted. One copy of the site plan at 8.5 by 11 inches shall also be submitted. (5) Site plan contents. Site plans shall include the following: a. Title block in the lower right hand corner with project name, address of property, name and address of developer, property owner, and applicant; north arrow, scale of not more than 1″:40′, plan date with revision dates, seals and signatures, names and addresses of all appropriate design professionals; b. A location map at the scale of not less than 1″ to 600′ showing the proposed project and the nearest street intersection; c. Boundary survey of site including distances with angles or bearings, building/setback lines, and street lines; and right-of-way lines; d. Locations and descriptions of all existing and proposed easements and rights-of-way; e. Zoning classification of property; f. Area of lot; g. Buildings and improvements on abutting parcels within 25 feet of property lines to include the name of adjacent owners and zoning classification of their property; h. Existing and proposed contours or spot grades at or more than two-foot intervals; i. Locations of existing and proposed buildings with dimensions, area, elevations and number of stories and distances between all buildings and property lines; j. Locations of other improvements and structures to include signs, fences, and walls; k. Existing and proposed sanitary and storm water drainage facilities with elevations; l. Existing and proposed water lines and hydrants; m. Existing and proposed sidewalks, curbs and curb cuts, and adjacent streets; n. Soil erosion and sedimentation control measures as required by section 58; o. Coastal zone management areas and/or flood zones as applicable; p. Inland wetland and watercourse areas as applicable; q. Drainage design for roof area, parking lot and driveways; r. Existing and proposed landscaping including a listing of all trees and shrubs to be planted, by common and botanical names, size (caliper, height, time until maturity) at planting, and height and spread at maturity; s. Layout of all off street parking areas showing details and dimensions of aisles, driveways, each parking space, all loading and unloading areas, pavement markings, location of directional signs and ADA-compliant spaces; t. Exterior Lighting Plan as required by Section 60.1; u. Fire lanes and traffic control signs as required by government authorities; v. Outside storage areas with proposed screening; w. Location of outside recycling and refuse storage area and proposed screening; x. A construction staging plan indicating the site logistics for all phases and the estimated time for construction of each stage and staging-related site improvements together with any public right-of-way encroachments; y. A table denoting and comparing the density, bulk and yard, parking, and loading standards required by the Zoning Regulations with the density, bulk, parking, and loading standards proposed in the site plan; z. Plan certification: Notation on site plan that plan's preparer certifies to the best of his/her knowledge, belief, and ability, and after research and inquiry, that the proposed plan meets all of the standards of the New Haven Zoning Ordinance except as might be otherwise noted in such certification; aa. Copy of preliminary application for access to state highways, to state-owned storm drainage facilities, and for DEP Coastal Permits where such state permits are required; bb. Copy of Board of Zoning Appeals decision letter with proof of recording, if zoning relief has been granted; cc. Stormwater Management Plans as required by Section 60; dd. Reflective Heat Impact Calculations as required by Section 60.2. (6) Other site plan requirements. a. Engineering data: 1. Any improvements which are proposed to become owned, operated, or maintained by the city shall have documentation that such improvements have been designed in accordance with accepted engineering practices and will be in compliance with all applicable City Codes and regulations governing such areas as pipe size, flow lines, invert and top of grate elevations, existing and proposed elevations, and construction practices and materials. 2. Applications must document appropriate storm water system designs. Quantity and velocity calculations, profiles, cross-sections, and other engineering documentation may be required for the City Engineer's review. b. Structural plans: 1. One copy of the plan of all proposed buildings, structures, signs, including floor plans and exterior elevations. c. Other information or exhibits: 1. Applicants may submit such other information or exhibits which the applicant believes address material site plan issues. All such submissions become the property of the city and are public information unless exempted by the laws of the State of Connecticut. 2. Other requested information and exhibits submitted under this section shall be submitted no later than five working days prior to the meeting scheduled for the application. Such information and exhibits shall be open for public inspection. (7) Administration. a. The Commission may, upon application of the applicant, waive or limit the requirement to provide information on any specific site plan when, in its opinion, the information is not necessary to reach a decision. Such waiver shall be based upon the particular character or limited nature of the proposal or due to special conditions peculiar to a site. The Commission may also request additional information that it determines is necessary for proper administration and enforcement. b. It is strongly recommended that for large projects or for projects with significant site constraints, a pre-application review of the submission be undertaken with the City Engineer and/or the City Plan Department. c. The Commission may hold a public hearing regarding any site proposal if, in its judgment, the specific circumstances require such action. Notice of public hearings and procedures shall be as prescribed by statute. d. All abutting property owners and other property owners within 200 feet of the property borders shall be notified by the applicant of the date, place, and time of the public hearing along with a summary of the proposal being considered at the hearing. That notification shall be on a form provided by the City Plan Department and shall be mailed to said property owners by regular mail no more than 14 nor less than seven days prior to the date of the public hearing. The applicant shall provide the Department with a copy of mailing labels of all property owners within 200 feet and certify that notification has been given in accordance with this section. e. The plan may be forwarded to any city or state agency or department for comment. f. When minor changes to approved site plans are requested which do not require revised vehicle/pedestrian access, do not require additional parking spaces, do not impact on necessary landscaping, or which may be required by field conditions, site plan approval may be granted by the City Plan Staff. An application, fee and plans shall be filed in the City Plan Department and Staff shall report all such approvals to the Commission at its next meeting. g. City Plan Department staff may determine that a proposed site plan does not meet threshold requirements of site plan review and may therefore be approved administratively, without formal Commission review. See Section 64(f)(10). (8) Decision procedures. a. The Commission shall receive complete site plan applications at the next meeting after submission or within 35 days of filing with the City Plan Department, whichever is shorter. The Commission shall render a decision upon the plan within 65 days of an application's receipt unless the site plan accompanies an application that requires a public hearing. Applicant may grant an extension of up to 65 days within which to act upon a site plan. b. The Commission's failure to render a decision on a completed site plan within the time limitations set above shall indicate approval of said site plan. c. Denial or modification of any site plan must be based upon Zoning Ordinance or other city standards. All denials or modifications of a site plan shall state specifically the reasons for said action. d. A copy of a final decision shall be mailed by certified mail to the applicant and property owner within 15 working days of the decision and a notice of said decision shall be published within 15 days of the decision in a newspaper with general circulation in New Haven. e. The applicant shall record a final decision on the City's Land Records, and shall present proof of such recording the City Plan staff, prior to issuance of building permit. f. Prior to the issuance of a building permit, a site restoration bond, if required by the City Plan Commission, shall be posted. (9) Maintenance and enforcement. a. The maintenance of the site before and after issuance of a certificate of occupancy shall be the sole responsibility of the owner. b. Lack of maintenance in a proper, neat and habitable condition shall be construed to be a violation of these regulations and subject to enforcement pursuant to section 62 of this ordinance and other penalties as provided by law. (10) Administrative site plan review. For proposed activities which do not meet the threshold for site plan review by the City Plan Commission as contained in section 64(f)(2) of this Ordinance, but still require a building permit and/or staff level zoning review, an administrative site plan review by the City of New Haven is required. Prior to commencement of any site activity, including but not limited to clearing and grubbing, grading, footings and/or foundations work, the applicant shall submit a site plan for review and approval consistent with guidelines approved by the City Plan Commission. (11) Effective date. This subsection (f) shall govern development activity initiated or proposed on vacant property, improved property or as otherwise applicable following enactment of Ord. No. 1416, as established by the effective date. (g) Motor vehicle uses. The City Plan Commission shall hear and determine applications for certificates of approval of location (CALs) for vehicle uses as provided for by the General Statutes of Connecticut. In passing upon any such application, the Commission shall be strictly cognizant of the provisions of the zoning ordinance, and may appropriate conditions and safeguards. Failure to comply with any such condition or safeguard shall constitute a violation of this ordinance. (h) Duration of approval, lapse of approval, renewal, transferability, and revocation. (1) Duration of approval. Pursuant to Section 8-3(i) of the Connecticut General Statutes, any site plan approved after June 30, 2011 is valid for a period of five years after the date of decision. Upon petition of the applicant, the Commission may, at its discretion, grant extensions totaling no more than an additional five years to complete all work connected to the original approval. Pursuant to Section 8-3(m) of the Connecticut General Statutes, any site plan approved prior to July 1, 2011 and that has not already expired prior to May 9, 2011 is valid for a period of nine years after the date of decision. Upon petition of the applicant, the Commission may, at its discretion, grant extensions totaling no more than an additional five years to complete all work connected to the original approval. Applications for extensions shall be made in writing between not less than 30 nor more than 60 days prior to the lapse of the original approval. (2) Lapse of approval. Consistent with Section 62.D, the Zoning Enforcement Officer shall determine the status of an approval and make a determination if the approval is valid or if approval has lapsed. (3) Transferability. The validity of an approval shall not be affected by changes in ownership.
(Ord. No. 1416, § 3, 5-1-06; ord. No. 1419, 6-5-06; Ord. No. 1662, 9-19-11
Ask a question about New Haven law
Corpus searches the New Haven sections it holds and shows the ones that match, with their citations. Free, no sign-in.
