§ 5.4 — Erosion, Sediment, and Stormwater Runoff Control Plan

Code of Ordinances of the City of Norwich, Connecticut (Codified through Ordinance No. 1871, enacted April 21, 2025. (Supp. No. 26)) · Norwich Code of Ordinances § 5.4

Corpus is an independent public-information project, not the official City of Norwich website. Stable reference: corpuslaw.us/code/96d64297-6ea4-4f32-9c11-07063b5affda

5.4 - Erosion, Sediment, and Stormwater Runoff Control Plan.

5.4.1 When submission of plan required. A soil erosion, sediment, and stormwater runoff control plan shall be submitted for any development or redevelopment when the disturbed area of such development is cumulatively more than one-half acre. The purpose of this plan is to prevent or minimize water quality impacts during construction and to provide for the operation and maintenance of post-construction facilities. 5.4.2 Exemptions. A lot proposed to be developed for a single-family dwelling that is not part of a subdivision. This exemption is applicable to land disturbed solely for the development of the single-family dwelling and the necessary amenities such as septic systems at sites where the proposed land disturbance is less than 1 acre. 5.4.3 Activities requiring a soil erosion, sediment, and stormwater runoff control plan. Projects where site disturbance: .1 Is cumulatively more than ½ acre; .2 Would result in excavation or filling involving 500 cubic yards or more of earth materials; .3 Is within 100 feet of critical coastal resources; or .4 Involves slopes greater than 15 percent. .5 This plan may be incorporated into other documents associated with Site Plan and Special Permit applications. 5.4.4 Permit Requirement. If more than 500 cubic yards of material is to be disturbed, the soil erosion, sediment, and stormwater runoff control plan shall be certified by a professional engineer licensed in the State of Connecticut. .1 The applicant may request a waiver for certification by a professional engineer. The Commission shall determine if a waiver is acceptable based on the size and scope of the proposed development. .2 Said plan shall then be submitted to and certified by the Commission on the City Plan. .3 Where a site plan is not required and more than ½ acre of land will be disturbed, a soil erosion, sediment, and stormwater runoff control plan must be submitted to the Commission for certification. .4 This includes all municipal projects that disturb over ½ acre of property. 5.4.5 Principles, methods and practices for certification. To be eligible for certification, a soil erosion, sediment, and stormwater runoff control plan shall contain proper provisions to adequately control accelerated erosion and sedimentation, prevent downstream flooding or sedimentation and reduce the danger from stormwater runoff on the proposed site based on the best available technology. Such principles, methods and practices necessary for certification are found in the "Connecticut Guidelines for Soil Erosion and Sediment Control," as amended. Alternative principles, methods and practices may be used with approval of the Commission. Both structural and non-structural post-construction facilities are acceptable, provided the facility serves the necessary purpose. In the event that structural stormwater management facilities are called for, the applicant will coordinate with the public works director to determine which facilities best serve the proposed development. 5.4.6 Plan requirements. Said soil erosion, sediment, and stormwater runoff control plan shall include, but not be limited to, the following: .1 A narrative describing: .1 The development; .2 The schedule for grading and construction activities including: (i) Start and completion dates; (ii) Sequence of grading and construction activities; (iii) Sequence for installation and/or application of soil erosion and sediment control measures; (iv) Sequence for final stabilization of the project site; .3 The design criteria for proposed erosion and sediment control measures and post-construction stormwater management facilities. All structural stormwater management facilities, except for those facilities regulated by the Connecticut Department of Environmental Protection, shall be designed for the twenty-five-year storm and shall be designed to ensure non-erosive velocities of stormwater runoff. Any detention facility whose failure could cause significant damage or loss of life shall be regulated as a dam pursuant to CGS §§ 22a-401 through 22a-409. Copies of all stormwater runoff calculations shall be submitted with the plan. .4 The construction details for the proposed soil erosion and sediment control measures (and post-construction stormwater management facilities); .5 The operations and maintenance program for proposed soil erosion and sediment control measures (and post-construction stormwater management facilities) shall provide for the periodic inspection no less than two times per year, removal of foreign materials from the system, silt removal (when needed to ensure that neither the storage volume nor the outlet capacity is reduced by more than twenty-five percent), and the general repairs to the facility. In addition, the submitted plan shall include: (i) The proposed operating plan for the stormwater management facilities; (ii) The proposed schedule of maintenance for the stormwater management facilities; (iii) The person or organization responsible for said operation and maintenance. .2 A site plan map at a sufficient scale (1:40) to show: .1 Location of the proposed development and adjacent properties; .2 The existing and proposed topographic conditions including soil types, wetlands, watercourses and water bodies; .3 The existing structures on the project site, if any; .4 The proposed area of alterations, including cleared, excavated, filled or graded areas and proposed structures, utilities, roads and, if applicable, new property lines; .5 Location of and design details for all proposed soil erosion and sediment control measures (and post-construction stormwater management facilities); .6 The sequence of grading and construction activities; .7 The sequence of installation and/or application and maintenance of soil erosion control measures; .8 The sequence for final stabilization of the development site. .3 Any other information deemed necessary and appropriate by the Commission. 5.4.7 Minimum acceptable standards. .1 Plans for soil erosion, sediment, and stormwater runoff control shall be developed in accordance with these regulations using the principles as outlined in the current "Connecticut Guidelines for Soil Erosion and Sediment Control," as amended. Soil erosion, sediment, and stormwater runoff control plans shall result in a development that: minimizes erosion and sedimentation during construction, is stabilized and protected from erosion when completed, and does not cause off-site erosion and/or sedimentation. .2 The minimum standards for individual measures are those in the "Connecticut Guidelines for Soil Erosion and Sediment Control," as amended. The Commission on the City Plan may grant exceptions when requested by the applicant if technically sound reasons are presented. .3 The appropriate methods from the "Connecticut Guidelines for Soil Erosion and Sediment Control," as amended, shall be used in determining peak flow rates and volumes of runoff unless an alternative method is approved by the Commission on the City Plan. 5.4.8 Issuance or denial of certification. .1 The Commission on the City Plan shall either certify that the soil erosion, sediment, and stormwater runoff control plan, as filed, complies with the requirements and objectives of this regulation or deny certification when the development proposal does not comply with these regulations. .2 Nothing in these regulations shall be construed as extending the time limits for the approval of any application under CGS Chapter 124, 124A or 126. .3 Prior to certification, any plan submitted to the municipality may be reviewed by the county soil and water conservation district which may make recommendations concerning such plan, provided such review shall be completed within 30 days of the receipt of such plan. .4 The Commission may forward a copy of the development proposal to the conservation commission or other review agency or consultant for review and comment. 5.4.9 Conditions relating to soil erosion and sediment control. .1 The estimated costs of measures required to control soil erosion and sedimentation, as specified in the certified plan, may be covered in a performance bond or other assurance acceptable to the Commission. .2 Site development shall not begin unless the soil erosion, sediment, and stormwater runoff control plan is certified and those control measures and facilities in the plan scheduled for installation prior to site development are installed and functional. .3 Planned soil erosion and sediment control measures and facilities shall be installed as scheduled according to the certified plan. .4 All control measures and facilities shall be maintained in effective condition to ensure the compliance of the certified plan. 5.4.10 Inspection. Inspections shall be made by the Commission or its designated agent(s) during and after development to ensure compliance with the certified plan and that control measures and facilities are properly performed or installed and maintained. If private land must be entered to inspect facilities, the designated agent, after showing proper credentials, shall not be refused access. The Commission may require the permittee to verify through progress reports that soil erosion and sediment control measures and facilities have been performed or installed according to the certified plan and are being operated and maintained in accordance with the certified plan. .1 If during construction, said measures are found to be ineffective, the Commission or its designated agent shall notify the applicant in writing. All earth moving related work on site shall cease until a revised plan has been submitted and approved by the Commission or its designated agent. .2 If said measures and facilities are found to not be in compliance with the certified plan, the plan shall become invalid: .1 If construction has not yet been completed, all earth moving related work on site shall cease until the site is in compliance with the plan and any damage resulting from non-compliance has been repaired. If necessary, the Commission or its designated agent may issue a stop-work order until the site is in compliance with the plan. .2 If the construction has been completed, the responsible party shall be served a notice of violation and will be given ten days to return the site to plan compliance. If, after 20 days, the responsible party has not returned the site to plan compliance, the city, or its designated agent, may perform the necessary corrective action and bill the responsible party for all associated costs. .3 If emergency action is required due to an imminent and substantial danger to public health, safety, welfare or natural resources, the city, or its designated agent, may perform any and all necessary work to bring the site into plan compliance. The responsible party will be billed for all costs associated with the emergency action. Also see Chapter 18.5 of the City Ordinances concerning excavations.

Ask a question about Norwich law

Corpus searches the Norwich sections it holds and shows the ones that match, with their citations. Free, no sign-in.