For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 51.74 — PERMIT REQUIRED FOR DISCHARGE OF CERTAIN WASTES

Code of Ordinances of the City of Waterbury, Connecticut (2026 S-8) · Waterbury Code of Ordinances § 51.74

Corpus is an independent public-information project, not the official City of Waterbury website. Stable reference: corpuslaw.us/code/8699230b-86d0-4e0a-ace9-db35d39532a8

§ 51.74 PERMIT REQUIRED FOR DISCHARGE OF CERTAIN WASTES.

(A) In accordance with Conn. Gen. Stat. § 22a-430 as amended, a permit from the Commissioner of Environmental Protection is required prior to the initiation of a discharge of any of the following waste waters to a public sewer: (1) Industrial waste water of any quantity; and (2) Domestic sewage in excess of 5,000 gallons per day through any individual building sewer to a public sewer. (B) A potential discharger must submit a permit application to the Department of Environmental Protection not later than 90 days prior to the anticipated date of initiation of the proposed discharge. A copy of the application shall also be provided to the City Engineer and the Superintendent. (1967 Code, § 17-65) (C) (1) All establishments discharging industrial wastes into the city sewerage system shall obtain a permit from the city. (2) Acceptable average and peak rates of flow and concentrations of pollutants shall be as determined by the Superintendent. (3) In no instance shall the flow in any one day exceed 100,000 gallons, and at no time shall the flow rate exceed 200 gallons per minute. (4) All permits shall be valid for a period not to exceed five years. (1967 Code, § 17-66) (Ord. passed 9-7-1983) Penalty, see § 51.99

Ask a question about Waterbury law

Corpus searches the Waterbury sections it holds and shows the ones that match, with their citations. Free, no sign-in.