Sec. 46-4. - Impact protection of natural gas and LP gas devices.

All natural gas and LP gas installations shall be installed per adopted NFPA and International codes, with the following amendments: (a) When required. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms. The fire marshal and/or chief building inspector shall reserve the right to apply this section whenever it is deemed necessary to provide impact protection to address a life or fire hazard. (b) Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) and embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection. (c) Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. (d) Responsibility. It shall be the responsibility of the property owner and/or contractor for the new installation to ensure that natural gas and LP gas meters, regulators, and valves are protected in accordance with these regulations. (e) Compliance period. All new construction projects shall comply with the provisions of this section. All existing multiple dwellings, schools, nursing homes, hospitals, and day care centers shall be protected in accordance with this section. All other existing structures shall be protected when deemed a life or fire hazard by the fire marshal. (f) Exemptions. Single-family homes, including townhouses, duplexes, and manufactured housing, except where natural gas and LP gas devices are located directly in front of head-in parking spaces and driveways, and where the fire marshal deems that impact protection is not necessary, shall be exempt from this section.

(Code 1981, § 7-5; Ord. of 5-10-1999; Ord. No. 2014-21, 9-22-2014; Ord. No. 2024-16, 6-24-2024)