§ 185-26. - Multiple property owners/developer public works agreement and aid-in-construction.
A. In a case where multiple developers and/or property owners propose to jointly utilize existing or future core infrastructure of an existing or proposed sanitary sewer drainage basin at the same time, the costs of the associated improvements for each developer shall be determined based on the percentage of their contributing flow. The percentage of contributing flow for each entity shall be calculated on an Equivalent Dwelling Unit (EDU) basis. Drainage basins shall be defined by the City of Milford in its best interest. The City of Milford at its own discretion may elect to participate financially in the cost of the core infrastructure improvements. Should the City elect to participate in the project then the associated percentages for the core infrastructure between the City and each developer shall be specified in a Public Works Agreement. The City shall design, administer and inspect the project with construction of the improvements performed in a publicly bid process. An estimated cost for the design, administration and construction of the project will be prepared by the City as part of the Public Works Agreement and include a 10% contingency amount. The estimated cost to each developer and the City will be allocated in accordance with the executed Public Works Agreement with the contributions from each developer financially secured prior to execution of the Agreement by the City. Should total project costs exceed the estimated project cost plus 10% contingency then each party shall pay for the additional cost(s) on the determined percentage basis at the time the cost is incurred by the City. Should the total project cost be less than the estimated project cost plus 10% contingency then said funds shall be reimbursed to each party on the determined percentage basis. Should the City not elect to participate in the core infrastructure improvements then the developers are free to execute the design and construction of the core infrastructure privately. A Public Works Agreement will be prepared by the City to define the required improvements and determine the percentage contribution by each party. All work shall be performed in accordance with City of Milford Standards and Specifications and the developers shall be responsible for all City costs to prepare the Public Works Agreement and perform all plan reviews, project coordination and inspections associated with the project. B. In a case where multiple developers and/or property owners propose to jointly utilize existing or future core infrastructure of an existing or proposed sanitary sewer drainage basin at different times, the costs of the associated improvements for each developer shall be determined based on the percentage of their contributing flow. The percentage of contributing flow for each entity shall be calculated on an equivalent dwelling unit (EDU) basis. Drainage basins shall be defined by the City of Milford in its best interest. The City of Milford at its own discretion may elect to participate in the cost of infrastructure upgrades to accommodate future developers who are not either ready or unwilling to immediately move forward with the development of their property within the sewer basin. The City shall contact each property owner within the City defined sewer basin to determine whether or not they would like to participate financially in the basin core infrastructure improvements. The properties within the basin shall then be defined as immediate participants (those properties interested in contributing immediately in the core infrastructure improvements) and future participants (those properties in the sewer basin not interested in immediately contributing in the core infrastructure). The City shall then decide whether or not they will participate in carrying the cost for said future participants in the form of Aid in Construction. Should the City not elect to participate in the core infrastructure improvements then the immediate developers are free to execute the design and construction of the core infrastructure privately. The core infrastructure would then be sized to accommodate only the improvements necessary to meet the needs of the immediate participants. A Public Works Agreement will be prepared by the City to define the required improvements and determine the percentage contribution by each party. All work shall be performed in accordance with City of Milford Standards and Specifications. The developers shall be responsible for all City costs to prepare the Public Works Agreement and perform all plan reviews, project coordination and inspections associated with the project. Should the City decide to participate in the project and construction of the core infrastructure, then the City will prepare a Public Works Agreement to define each immediate and future developer/property participant to be included within the sewer basin. The City shall design, administer and inspect the project with construction of the improvements performed in a publicly bid process. An estimated cost for the design, administration and construction of the project will be prepared by the City as part of the Public Works Agreement and include a 10% contingency amount. The estimated cost to each developer/property owner will be allocated in accordance with the executed Public Works Agreement with the contributions from each immediate developer financially secured prior to execution of the Agreement by the City. Should total project costs exceed the estimated project cost plus 10% contingency then each immediate developer shall pay for the additional cost(s) on the determined percentage basis at the time the cost is incurred by the City. Should the total project cost be less than the estimated project cost plus 10% contingency then said funds shall be reimbursed to each immediate developer on the determined percentage basis. If not defined by the future participant property owner, flow determinations for each future property included within the sewer basin shall be defined based on the maximum allowable density of the existing zoning at the time of the Agreement, or as determined practical by the City. Should the property be up zoned and/or future development exceeds the number of EDUs allocated to the property then said future participant or developer shall be responsible for all upgrades necessary to accommodate the increase. The immediate developer(s) and the City shall pay for the improvements on the percentage basis as defined in the Public Works Agreement. The City shall however be reimbursed for capital outlays plus interest by future participants/developer(s) for properties initially carried by the City as Aid in Construction. The Aid in Construction reimbursement to the City shall be based on the percentage of flow that each property defined as future will contribute to the core infrastructure up to the number of EDUs defined for said property in the Public Works Agreement. Aid in Construction costs allocated to future developer(s) shall be reimbursed to the City prior to plot plan recordation or commercial site plan approval, whichever applies. C. The City Council has the right to modify, amend or waive any or all of the provisions contained in subsections (A) and (B) above. D. No public funds will be utilized for any extension outside the City limits. Costs of such extensions shall be borne exclusively by the developer(s).
[Ord. No. 2015-22, § 4, 11-23-2015; Ord. No. 2017-07, § 5, 2-13-2017]