§ 222-27. - Main extensions; public works agreement and aid-in-construction.
A. Property owner(s) and/or developer(s) proposing to submit for a Major Subdivision or Site Plan approval shall first submit a Utility Feasibility Study request to the City. Cost for the feasibility study shall be paid for by the applicant or applicants. The Utility Feasibility Study will be performed by the City and the results of the study used as the basis for defining the water service area(s) and associated core infrastructure improvements necessary to serve the development(s). B. If one or more property owner(s) or developer(s) proposes a new development with an average daily flow of 2,500 gpd (10 EDUs) or more, to connect to the City's water infrastructure, but the infrastructure is not sized to handle both the average and peak daily flows (average daily flow multiplied by a peaking factor of 2.0 to 3.5, depending on the size of the system) from the existing users of the water service area and the proposed new development, the developer shall perform one of the following in addition to the payment of the impact fees and entering into a Development Agreement: (1) If a single property owner/developer: Construct the necessary improvements to accommodate the existing users and the new proposed development as defined by the Utility Feasibility Study, prior to connecting to the City's system. All work shall be performed in accordance with City of Milford Standards and Specifications; or (2) If multiple property owners or developers; Sign a Public Works Agreement with the City as further described in Section 222-27 Paragraph C. C. Multiple Property Owners/Developers Public Works Agreements and Aid-in-Construction. (1) In a case where multiple developers and/or property owners propose to jointly utilize existing or future core infrastructure of an existing or proposed water service area at the same time, the costs of the associated improvements for each developer shall be determined based on the percentage of their contributing flow. The percentage of contributing flow for each entity shall be calculated on an Equivalent Dwelling Unit (EDU) basis. Service areas shall be defined by the City of Milford in its best interest. The City of Milford at its own discretion may elect to participate financially in the cost of the core infrastructure improvements. Should the City elect to participate in the project then the associated percentages for the core infrastructure between the City and each developer shall be specified in a Public Works Agreement. The City shall design, administer and inspect the project with construction of the improvements performed in a publicly bid process. An estimated cost for the design, administration and construction of the project will be prepared by the City as part of the Public Works Agreement and include a 10% contingency amount. The estimated cost to each developer and the City will be allocated in accordance with the executed Public Works Agreement with the contributions from each developer financially secured prior to execution of the Agreement by the City. Should total project costs exceed the estimated project cost plus 10% contingency then each party shall pay for the additional cost(s) on the determined percentage basis at the time the cost is incurred by the City. Should the total project cost be less than the estimated project cost plus 10% contingency then said funds shall be reimbursed to each party on the determined percentage basis. Should the City not elect to participate in the core infrastructure improvements then the developers are free to execute the design and construction of the core infrastructure privately. A Public Works Agreement will be prepared by the City to define the required improvements and determine the percentage contribution by each party. All work shall be performed in accordance with City of Milford Standards and Specifications and the developers will be responsible for all City costs to prepare the Public Works Agreement and perform all plan reviews, project coordination and inspections associated with the project. (2) In a case where multiple developers and/or property owners propose to jointly utilize existing or future core infrastructure of an existing or proposed water service area at different times, the costs of the associated improvements for each developer shall be determined based on the percentage of their contributing flow. The percentage of contributing flow for each entity shall be calculated on an equivalent dwelling unit (EDU) basis. Water service areas shall be defined by the City of Milford in its best interest. The City of Milford at its own discretion may elect to participate in the cost of infrastructure upgrades to accommodate future developers who are not either ready or unwilling to immediately move forward with the development of their property within the water service area. The City shall contact each property owner within the City defined water service area to determine whether or not they would like to participate financially in the service area core infrastructure improvements. The properties within the service area shall then be defined as immediate participants (those properties interested in contributing immediately in the core infrastructure improvements) and future participants (those properties in the water service area not interested in immediately contributing in the core infrastructure). The City shall then decide whether or not they will participate in carrying the cost for said future participants in the form of Aid in Construction. Should the City not elect to participate in the core infrastructure improvements then the immediate developers are free to execute the design and construction of the core infrastructure privately. The core infrastructure would then be sized to accommodate only the improvements necessary to meet the needs of the immediate participants. A Public Works Agreement will be prepared by the City to define the required improvements and determine the percentage contribution by each party. All work shall be performed in accordance with City of Milford Standards and Specifications. The developers will be responsible for all City costs to prepare the Public Works Agreement and perform all plan reviews, project coordination and inspections associated with the project. Should the City decide to participate in the project and construction of the core infrastructure, then the City will prepare a Public Works Agreement to define each immediate and future developer/property participant to be included within the water service area. The City shall design, administer and inspect the project with construction of the improvements performed in a publicly bid process. An estimated cost for the design, administration and construction of the project will be prepared by the City as part of the Public Works Agreement and include a 10% contingency amount. The estimated cost to each developer/property owner will be allocated in accordance with the executed Public Works Agreement with the contributions from each immediate developer financially secured prior to execution of the Agreement by the City. Should total project costs exceed the estimated project cost plus 10% contingency then each immediate developer shall pay for the additional cost(s) on the determined percentage basis at the time the cost is incurred by the City. Should the total project cost be less than the estimated project cost plus 10% contingency then said funds shall be reimbursed to each immediate developer on the determined percentage basis. If not defined by the future participant property owner, flow determinations for each future property included within the water service area shall be defined based on the maximum allowable density of the existing zoning at the time of the Agreement, or as determined practical by the City. Should the property be up zoned and/or future development exceeds the number of EDUs allocated to the property then said future participant or developer shall be responsible for all upgrades necessary to accommodate the increase. The immediate developer(s) and the City shall pay for the improvements on the percentage basis as defined in the Public Works Agreement. The City shall however be reimbursed for capital outlays plus interest by future participants/developer(s) for properties initially carried by the City as Aid in Construction. The Aid in Construction reimbursement to the City shall be based on the percentage of flow that each property defined as future will contribute to the core infrastructure up to the number of EDUs defined for said property in the Public Works Agreement. Aid in Construction costs allocated to future developer(s) shall be reimbursed to the City prior to plot plan recordation or commercial site plan approval, whichever applies. (3) The City Council has the right to modify, amend or waive any or all of the provisions contained in Subsection C(1) and C(2) above. (4) No public funds will be utilized for any extension outside the City limits. Costs will be borne exclusively by the developer(s). D. Mains shall be sized by the City to meet the applicant's domestic water needs. The applicant shall advise the City of main sizes necessary for fire protection. E. Reserved. F. No construction of water facilities shall commence until the plans submitted by the applicant are approved by the City, Fire Marshal, DHSS and other approval agencies as required. The main extension shall be referenced in the public works/utility agreement. No water service shall be provided by the City until the agreement is executed and the applicant has satisfied all municipal regulations. G. All main extensions shall extend the entire length of the property to be served in all directions, unless otherwise approved by the City Manager. All water mains shall be looped to ensure a continual flow from either direction, with valves installed at each connection. Mains shall be extended to the property lines in a minimum of two locations as required by the City Engineer. H. All main extensions shall be constructed in public rights-of-way or designated utility easements conveyed to the City. The applicant shall grant to the City any easements across his property that are necessary for the main extension or future extensions thereof. I. The applicant shall construct all main extensions to the requirements and specifications of the City and shall bear all costs of the main construction, including the costs of inspection, as required by the City. J. Normally, the applicant shall furnish and install, at his own expense, the necessary service connections. Each service connection will include the connection to the main, corporation stop, service line, curb stop, meter pit and appurtenances as per the latest edition of the City specifications. When the applicant furnishes and installs the service connection, the tapping and connection fees are waived. The applicant is responsible for any inspection and impact fees regardless of who furnishes and installs services. The City reserves the right, however, to furnish and install any service connection on its own. K. The owner shall dedicate and the City will accept by written notification the dedication of any water mains and appurtenances constructed under the main extension as contained in the public works/utility agreement, provided that the same are installed and tested in compliance with City specifications. All costs incurred by the City for said testing shall be reimbursed by the owner at a rate of actual cost plus 10%. L. The City reserves the right to construct the main extension on its own, at the applicant's expense. If the City decides to construct the main extension, an estimate of preconstruction costs including a 10% contingency fee will be furnished to the applicant for approval and for deposit of the estimated amount. After preconstruction engineering and administrative items are completed, an estimate of construction and related costs will be furnished to the applicant for approval and deposit. After receiving the deposits, the City will proceed with the main extension construction. A tabulation of the total main extension costs will be submitted to the applicant. If the total cost is less than the applicant's total deposits, the City will return any excess moneys deposited. If the total cost exceeds the applicant's deposits, the applicant shall pay the excess amount prior to the receipt of water service. M. Deposits for main extensions shall not bear interest. N. The public works/utility agreement, together with all its terms and conditions, shall be binding upon and inure to the benefit of the respective successors or assignees or personal representatives of the parties thereto, but the agreement, other than the right to receive such payments as may be due thereunder, may not be assigned by the applicant without the prior written consent of the City.
[Ord. No. 2015-23, § 2, 11-23-2015; Ord. No. 2019-01, § 15, 3-11-2019]
Ask a question about Milford law
Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.