For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 230-52.2 — Construction Procedures

City Code of the City of Milford, Delaware (Supplement 29 Update 1 (2025-01-27)) · Milford City Code § 230-52.2

Corpus is an independent public-information project, not the official City of Milford website. Stable reference: corpuslaw.us/code/b6863b23-75c2-4e01-9739-577e53ec3084

§ 230-52.2. - Construction Procedures.

A. Prior to commencement of construction, the developer shall request a pre-construction meeting with the City Engineer. Payment of the required development inspection fee, as adopted by City Council and found in the City Fee Schedule, shall be made prior to the scheduling of the pre-construction meeting. B. Improvements within the development shall be constructed per the approved construction plans and the City's Standard Construction Specifications. Any deviations from the construction plans must be submitted to the City Engineer in writing for review and approval. C. A performance bond in the amount of 125% of the cost of installation shall be required for the construction of recreational and open space amenities, including but not limited to community buildings, playgrounds, walking paths, landscaping and landscape screening. The performance bond shall be posted prior to the issuance of the first building permit. D. Conditional Acceptance of Infrastructure by City Engineer. (1) Prior to the issuance of building permits, the developer shall obtain conditional acceptance from the City Engineer as outlined in the City's Standard Construction Specifications. (2) A maintenance bond shall be provided by the developer in the amount of 10% of the improvements to be taken over and maintained by the City. (3) A performance bond shall be provided by the developer in the amount of 125% of the cost for any item that has not been satisfactorily completed as approved by the City Engineer. E. Final Acceptance of Infrastructure by City Council. (1) Final top coat shall be paved after 75% of building permits have been issued for a project or phase of a project and prior to 90% of building permits having been issued for a project or phase of a project. (2) Final acceptance of utilities shall not occur until after the paving top coat has been completed. (3) Upon completion of the top coat paving, the City Engineer may release the top coat performance bond. The 10% maintenance bond will remain in place until one year after acceptance of the final top coat paving. (4) Upon completion of the required one-year maintenance period, the right-of-way improvements may be accepted by City Council by resolution. (5) Upon acceptance by City Council, the maintenance bond may be released by the City Engineer in its entirety.

[Ord. No. 2022-06, 1-24-2022]

Ask a question about Milford law

Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.