§ 19-129 — Temporary use of right-of-way for construction material
Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 19-129
Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/2113ba56-6369-4a4b-877d-033b23a0edae
Sec. 19-129. - Temporary use of right-of-way for construction material.
(1) Maximum space used for building materials. Upon written request, the city manager or his designee may authorize building materials required for use immediately or in connection with the construction of a building to be placed or stored upon the street or sidewalk in front of the building in the course of construction or alteration. The maximum width of such occupied space shall not exceed ⅓ of the width of the street, measured between curbs, and in no case shall the space within 5 feet of the nearest rail of any railway tracks be occupied by building materials. The sidewalk space may be occupied for building construction purposes providing the owner or his agent constructs a temporary sidewalk not less than 5 feet in width in the outer portion of the permissible occupied space. Such temporary sidewalk shall be protected on the building side by a tight fence not less than 8 feet in height and shall be open on both ends and on the side next to the street. The city manager or designee may impose reasonable conditions upon any such proposed use of a street or sidewalk, or portion thereof. (2) Placing building material in front of adjoining property. Building materials may be placed in front of the property adjoining a building site under the same conditions as provided for the occupation of the street immediately in front of the building site, provided the written consent and waiver of claim for damages against the city is obtained from the owner of such adjoining property, and approved by the city attorney. (3) Mixing mortar or concrete; cleaning of pavement. Mortar or concrete may be prepared in the space permitted for storage of building materials, but shall be done in a mechanical mixer or in a tight box or on a tight mixing board in such a manner that dripping or splashing shall be prevented. All pavement shall be well cleaned of all building materials at all times. A construction runoff control plan shall be approved by the city manager or his designee and implemented prior to the commencement of mixing, cleaning or other work to ensure that construction runoff which may enter any city drainage structure or facility is in compliance with all applicable federal and state standards.
(Ord. No. 5455, § 2, 5-22-18)
Ask a question about Boca Raton law
Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.