Sec. 19-71. - Action on application.
(1) The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject such application in writing, stating the reasons therefore. If the building official is satisfied that the proposed work conforms to the requirements of this building code and laws and ordinances applicable thereto, the building official shall issue a permit therefore as soon as practicable. When authorized through contractual agreement with a school board, in acting on applications for permits, the building official shall give first priority to any applications for the construction of, or addition or renovation to, any school or educational facility. (2) Upon approval of the application for permit and the accompanying drawings, specification and data sheets, verification that the contractor's certification, liability and workers compensation insurance is current and in force, assessment and posting of building permit and impact fees, and affixing a dated, approved stamp on the application and each of the accompanying drawings, specification and data sheets, the building official shall issue a permit for the work described in the application. The permit shall be considered issued on the date all of the preceding tasks are completed and the permit status is changed to issued. (3) If a state university, state college or public school district elects to use the services of the department, fees charged by the city for enforcement of the building code on buildings, structures, and facilities of state universities, state colleges and public school districts shall not be more than the actual labor and administrative costs incurred for plans review and inspections to ensure compliance with the building code. (4) No permit may be issued for any building construction, erection, alteration, modification, repair, or addition unless the applicant for such permit provides to the city all of the following documents which apply to the construction for which the permit is to be issued and which shall be prepared by or under the direction of an engineer registered under F.S. ch. 471: (a) Any electrical or plumbing or air-conditioning and refrigeration system meeting the following thresholds shall be designed by a state registered professional engineer if the system: 1. Requires an electrical or plumbing or air-conditioning and refrigeration system with a value of over $125,000.00; and 2. Requires either: a. An aggregate service capacity of over 600 amperes (240 volts) on a residential electrical system or over 800 amperes (240 volts) on a commercial or industrial electrical system. In addition, any repairs, modifications or alterations to any electrical service, electrical feeder or electrical branch circuit with a voltage exceeding 240 volts RMS, customer owned and regulated by the building code shall be designed by a state registered professional engineer; b. A plumbing system with 250 fixture units or more; or c. Heating, ventilation and air-conditioning system exceeding a 15-ton-per-system capacity; or if the project is designed to accommodate over 100 persons. (b) Fire sprinkler documents for any new building or addition which includes a fire sprinkler system which contains 50 or more sprinkler heads. A contractor I, contractor II or contractor IV, certified under F.S. § 633.521, may design a fire sprinkler system of 49 or fewer heads and may design the alteration of an existing fire sprinkler system if the alteration consists of the relocation, addition or deletion of not more than 49 heads, notwithstanding the size of the existing fire sprinkler system. (c) Any specialized mechanical, electrical, or plumbing document for any new building or addition which includes a medical gas, oxygen, steam, vacuum, toxic air filtration, halon, or fire detection and alarm system which costs more than $5,000.00. (5) Documents requiring an engineer seal by this section shall not be valid unless a state registered engineer has signed, dated, and sealed such document as provided in F.S. § 471.025. (6) A permit for a 1- and 2-family dwelling shall be issued within 30 working days of the date of the application therefore unless unusual circumstances require a longer time for processing the application or unless the permit application fails to satisfy the building code or the city's laws or ordinances. (7) Where an application consists of 1 or more separate sub-permit applications, the building official shall designate 1 of the constituent permits issued therefrom as the "principal" permit.
(Ord. No. 5455, § 2, 5-22-18)
Ask a question about Boca Raton law
Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.