Sec. 23-141. - Requirements; penalty.

(1) As used in this section, the term "1-inch rainfall" shall mean the first 1 inch of rainwater which falls on the proposed building site. (2) In any area of the city where city-approved positive drainage systems exist, the following shall be required: (a) All permit applications for new single-family or duplex residences and for all modifications, alterations or additions to any such residences which alter the existing drainage flow shall be accompanied by a final grading plan prepared, signed and sealed by a state-registered engineer or architect showing the proposed site plan, with flow arrows indicating the final direction of flow of rainwaters to the existing drainage system. (b) All permit applications for new buildings in multifamily residential districts (including planned unit developments and cluster developments) or new business, commercial or industrial buildings and for all modifications, alterations or additions to any such buildings which alter the existing drainage flow shall be accompanied by a drainage plan prepared, signed and sealed by a state-registered engineer or architect showing final elevations, with flow arrows indicating the final direction of flow of rainwaters to the existing drainage system. (3) In any area of the city where no city-approved positive drainage system exists, the following shall be required: (a) All permit applications for new single-family or duplex residences and for all modifications, alterations or additions to any such residences which alter the existing drainage flow shall be accompanied by a drainage plan prepared, signed and sealed by a state-registered engineer or architect, which will provide for adequate drainage on the site or within swale areas on adjacent and contiguous public rights-of-way to retain all runoff from the first 1-inch rainfall and to drain the additional rainfall above 1 inch so that adjoining, privately owned properties will not be adversely affected. When swales within public rights-of-way are utilized for retention, the swale shall be of adequate capacity to retain the runoff from a 1-inch rainfall on the right-of-way and the adjacent and contiguous sites. (b) All permit applications for new buildings in multifamily residential districts (including planned unit developments and cluster developments) or new business, commercial or industrial buildings and for all modifications, alterations or additions to any such buildings which alter the existing drainage flow shall be accompanied by a drainage plan prepared, signed and sealed by a state-registered engineer or architect, which will provide for adequate drainage on the site to retain all runoff from the first 1-inch rainfall and to drain the additional rainfall above 1 inch so that adjoining privately owned properties will not be adversely affected. (4) The following basic design criteria shall be used in the development of all drainage plans. The design computations shall be shown on or attached to and made a part of the drainage plan submitted with the application for a building permit. (a) Total proposed impervious and pervious lot area will be indicated. (b) Runoff coefficients for impervious and pervious areas are to be used to determine total runoff to be contained from the 1-inch rainfall. (c) The volume of computed runoff from a 1-inch rainfall will be controlled by means including, but not limited to, the use of holding ponds, swales or drainage structures. (5) No certificate of occupancy shall be issued until a final inspection has been made to assure compliance with the approved grading or drainage plan filed with the building permit documents. (6) The requirements of this section shall be cumulative to any other code requirements relating to drainage of property. (7) Property owners shall maintain required drainage improvements on their property in compliance with the approved grading or drainage plan. Failure to maintain drainage improvements shall be deemed a public nuisance and a violation of this section, and shall be punishable under section 1-16.

(Code 1966, § 7-60)