§ 23-87 — Construction plans for public utility, roadway and other public improvements

Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 23-87

Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/471d943e-cf33-4300-ba1f-c26378738da1

Sec. 23-87. - Construction plans for public utility, roadway and other public improvements.

(1) Preparation. With respect to projects not requiring subdivision or PUD plat approval, the applicant or his engineer shall confer with the city staff to determine the standards and specifications which will govern the proposed improvements. The applicant shall submit to the city staff complete construction plans, as required by city staff. The construction plans shall be prepared by an engineer registered in the state, for the entire development of the area for which application has been submitted, together with a complete and accurate contour map using National Geodetic Vertical Datum (NGVD) and a drainage plan showing elevations of adjacent properties. Sewer and water systems shall be reviewed and approved by city staff and all applicable regulatory agencies. Construction plans shall include the complete design of required sanitary sewer systems, water supply systems, storm drainage systems, street systems and solid waste storage and collection points for the entire area to be developed. Due consideration shall be given to the problems that may be created by the development of adjacent lands, especially storm drainage. The construction plans shall conform with the requirements of the public utilities manual, engineering design standards manual and all applicable ordinances. The submission of construction plans shall be accompanied by a fee as provided in the city municipal facilities and services user fee schedule. (2) Approval of plans. All construction plans are to be reviewed and approved by the city staff. Water and sewer plans shall also be reviewed and approved by all applicable regulatory agencies, and no water or sewer construction shall commence prior to receipt of all applicable regulatory agency permits. (3) Construction of improvements; inspection fees. (a) After approved construction plans have been received, the applicant may construct the required improvements, subject to obtaining the required permits. The city shall be notified at least 48 hours in advance of the date that such construction shall be commenced. Construction shall be subject to inspection by the city, which inspection shall not relieve the applicant and his engineer of close field supervision and final compliance with approved plans and specifications. The city shall establish detailed regulations governing the inspections to be furnished by the applicant or his engineer and may refuse to accept work done without proper inspection. Prior to the issuance of the required permits, the applicant's engineer shall submit a certified signed and sealed estimate of construction costs of the project's water, sewer, drainage and pavement required to be installed for the site development; and the applicant shall pay the applicable fee to the city to cover inspection by the city during construction as provided in the city municipal facilities and services user fee schedule. (b) Work started without a permit. Where work for which a permit is required by this Code is started or proceeded with prior to obtaining the permit, the fees specified shall be doubled. The payment of such double fee shall not relieve any person from fully complying with the requirements of this Code and all other applicable regulations and laws in the execution of the work. (c) The applicant shall employ a state-registered engineer for complete supervision of the construction and installation of the improvements involved, and shall provide progress reports, 2 sets of signed and sealed as-built plans, 1 reproducible Mylar of the as-built plans, and a final signed and sealed certification that all work has been constructed in accord with plans, specifications and all governmental regulations, to be filed with the city. (d) Reinspection fee. The fee for each reinspection, due to wrong address, work rejected because of faulty construction, work not ready for inspection at time requested, code violations, repairs or corrections not made when inspection is scheduled, or premises not accessible to the inspector, is as set forth in the schedule which is on file in the city clerk's office. (e) The inspection fees for water and sewer improvements to be constructed outside the corporate limits of the city shall carry a surcharge of 25 percent of the fees provided in the city municipal facilities and services user fee schedule.

(Code 1966, § 7-58; Ord. No. 4122, § 23, 9-28-93; Ord. No. 4170, § 35, 9-27-94; Ord. No. 4850, § 4, 2-23-05)