For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-1251.2 — Eligibility and review procedures

Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 28-1251.2

Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/295f5406-533f-4c47-b3c5-b5f8731efa31

Sec. 28-1251.2. - Eligibility and review procedures

(a) Eligibility. The PM-0.40 district shall be a zoning district available for: (i) lands which are designated PM on the future land use map of the city's comprehensive plan; (ii) lands which were designated as residential on the future land use map at the time of adoption of Ordinance No. 5144 on October 26, 2010; (iii) lands which are a minimum of 40 acres in gross land area. Land zoned PM-0.40 shall be noted as such on the city's zoning map; (iv) lands for which an applicant has submitted a concurrent master plan as required in chapter 28, article XVII, division 8, planned mobility development, which follows regulations and standards pursuant to applications for planned mobility development, as specified in chapter 28, article XVII, division 8, planned mobility development (including, without limitation, the notice and procedural requirements of master plans as set forth in article XVII, division 3), with the exception of perimeter setbacks, height, and perimeter landscape buffers (but allowing modifications to perimeter sidewalk buffers, as provided in section 28-1850(4)) and vehicular connections which shall not be eligible for modification and are specified in (and shall be controlled by the specific provisions of) this division (a master plan authorized pursuant to this subsection shall be referred to in this division as a "PMD master plan"); and (v) lands for which an applicant has provided a traffic analysis demonstrating that the development proposed, pursuant to a PMD master plan as required in chapter 28, article XVII, division 8, planned mobility development, is consistent with the assumptions and conclusions of the traffic analysis upon which rezoning of the subject lands was approved (specifically, that certain traffic analysis entitled "Traffic Impact Analysis Zoning Change (R1D to PM-1)" received by the development services department and dated May 23, 2013, prepared by J.M.D. Engineering, Inc., an official copy of which is on file with the city clerk) and that external trip generation resulting from development of the PMD master plan at the maximums proposed does not exceed the external trip generation that the assembly of land uses (including internalization and all other assumptions) would generate as set forth in the traffic analysis. If an application for a site plan is not filed and approved within 3 years from the date of adoption of an ordinance rezoning lands to PM-0.40, the traffic analysis shall be updated and the original assumptions and conclusions modified, if necessary, to ensure compliance with the city's requirements for testing traffic impacts associated with rezoning. (b) Traffic concurrency. Consistency and concurrency testing and analysis shall not be required for approval of the PMD master plan but shall be required prior to consideration of a site plan pursuant to section 28-1251.2(d). (c) Review criteria. In addition to the review criteria specified in chapter 28, article XVII, division 8, planned mobility development, both the planning and zoning board and the city council shall review the PMD master plan to ensure that the PMD master plan: (i) Is compliant with the assumptions and conclusions of the traffic analysis upon which rezoning of the lands within the PMD master plan was approved (as more particularly described in subsection (a)(v) above) or, in the event that the PMD master plan application (or any application to amend a PMD master plan) is filed more than 3 years from the date of adoption of the ordinance rezoning lands to PM-0.40, the traffic analysis shall be updated and the original assumptions and conclusions modified, if necessary, to ensure compliance with the city's requirements for testing traffic impacts associated with rezoning; (ii) Does not result in external trip generation exceeding that set forth in the traffic analysis (including internalization and all other assumptions within the traffic analysis); (iii) Is compliant with planned mobility program requirements set forth in section 28-1849(6); (iv) Is consistent with the comprehensive plan; and (v) Is compliant with the PM-0.40 zoning district purpose and regulations. (d) Modifications. If a site plan proposes any change in use, square footage for a category of use (provided such change is not de minimis as determined by city staff), configuration (provided such change is not de minimis as determined by city staff), access/roadway/infrastructure, or any other amendment as depicted, noted or otherwise provided for in the PMD master plan for that "parcel", "pod", or any other "parcel", "pod", or portion thereof, an amendment to the PMD master plan shall be required. In no event, shall a PMD master plan be revised to become a single use project for all of the phases and pods within the project. A PMD master plan shall be modified by the same procedure required for approval of a new PMD master plan. (e) Platting requirement. In conjunction with the first application for site plan approval, the applicant shall submit an application for an overall final plat showing all tracts within the PMD master plan which includes the entire parcel of land, with the location of the concurrent site plan shown on the final plat. The plat shall be amended as part of each successive application for site plan approval, if required. (f) Site plans in PM-0.40. After approval of a PMD master plan and prior to commencement of any development, an application for approval of a site plan for all parcels or a portion of parcels within the PMD master plan shall be filed within 5 years of approval of the PMD master plan. A PMD master plan shall expire in the event that a site plan is not obtained within 5 years. After approval of the first site plan implementing the PMD master plan, each subsequent site plan shall be obtained within 3 years after issuance of a certificate of occupancy for the construction authorized by the last approved site plan. In the event a site plan is not timely obtained as provided herein, or is obtained but expires or is abandoned, then the PMD master plan shall expire, be null and void, and of no further force and effect with respect to improvements for which no site plan was obtained or the site plan expired or was abandoned. Each application for site plan approval (and any amendment thereto) shall be reviewed pursuant to the provisions of chapter 28, article II, division 2, site plans, and provisions in chapter 28, article XVII, division 8, planned mobility development, except that the planning and zoning board shall make a recommendation regarding PM-0.40 site plans (and any amendment thereto) to the city council, and the city council shall review and render final decisions regarding any PM-0.40 site plan (and any amendment thereto). Each site plan and any amendment thereto, individually and in the aggregate taken together with all previously approved development orders, shall be compliant with the PMD master plan and PMD regulations and standards with the exception of perimeter setbacks, height, and perimeter landscape buffers (but allowing modifications to perimeter sidewalk buffers, as provided in section 28-1850(4)) and vehicular connections (which are specified in this division and shall not be eligible for modification), and the expiration and timing of the PMD master plan and subsequent site plans which are specified in (and shall be controlled by the specific provisions of) this division. Each site plan shall be consistent with the design concepts in the approved PMD master plan. The roadway, intersection, and infrastructure improvements (including roadway design cross-sections and alignments, public transit facilities, on-site bus transfer stations, internal shuttle circulator, bicycle facilities, and all pedestrian amenities such as seating areas, benches, street trees, trash receptacles, shelters, covered walkways, raised sidewalk locations, street lights and pedestrian scale lighting) for the phase within which a site is located shall be completed as part of the development of the first site within such phase, in addition to improvements required to provide access and services to any individual site plan regardless of whether located within the limits of such site plan. In reviewing site plans within a PMD master plan, in addition to consideration of the requirements described above, the planning and zoning board and the city council shall consider the following decisional criteria: (i) The site plan is consistent with and promotes the mobility goals, objectives, and policies of the comprehensive plan; (ii) The site plan demonstrates adequate infrastructure to support the use(s) proposed within the site plan and future uses on lands within the PMD master plan; (iii) The distribution of use(s) proposed in the site plan provides a land development pattern that encourages a balance of complementary uses that respects the existing character of surrounding land uses and allows for logical development of undeveloped lands within the PMD master plan; (iv) The location, sizes, and overall distribution of use(s) in the site plan support viable and economically stable projects appropriate to the surrounding area and the city overall in the context of the planned mobility objectives of the comprehensive plan; (v) The use(s) in the site plan are effectively dispersed and maximally located in relation to the other uses on lands within the PMD master plan; (vi) The proposed density, intensity, and distribution of use(s) in the site plan encourage the effective and harmonious development of the lands within the PMD master plan; (vii) The location of any use(s) on the site which exceeds the maximum density, intensity, and total development floor area (as provided in section 28-1251.4, Code of Ordinances) as measured on a parcel basis, advances the planned mobility initiatives of the comprehensive plan and the overall viability of the lands within the PMD master plan. (g) PMD master plan—Notice to subsequent owners/purchasers. The PMD master plan shall include language providing notice to all subsequent owners/purchasers, in a form approved by the city attorney, that proposed development of lands within the PMD master plan shall be limited to the development set forth on the PMD master plan, which may be amended pursuant to this division 7. The PMD master plan and any site plan (and any amendments thereto) approved pursuant to the PMD master plan shall also include language, in the form of a recordable notice, noting the following: (i) that the development regulations governing the PMD master plan (and amendments), as well as any site plan or amendments thereto approved pursuant to the PMD master plan, permit density, intensity, total development floor area, open space, and all other applicable Code requirements to be calculated on all lands within the PMD master plan rather than calculated on a per parcel basis (which is not the typical method of calculation utilized in conventional zoning districts); (ii) that the development that may be authorized pursuant to those calculations may be allocated to 1 or more of the parcels established within the PMD master plan; (iii) that, accordingly, development that may be authorized on parcels created within the PMD master plan may be limited by previous allocations of those rights (specifically, analysis/calculation of a parcel's development potential/rights cannot be confined to the acreage of, or development parameters applicable to, the parcel, but is dependent upon a comprehensive calculation of all development potential/rights previously approved under the PMD master plan compared to the maximum development potential/rights within the PMD master plan so as to determine the remaining development potential/rights which may be allocated to the parcel); (iv) that, in addition, as a result of calculating certain development parameters on all lands within the PMD master plan, as opposed to each parcel, the development parameters may be exceeded when calculated on a per parcel basis but shall not be exceeded when calculated on a PMD master plan basis; (v) that notice of the PMD master plan (and any amendments thereto) shall be recorded in the public records together with a unity of control in lieu of a unity of title for all lands encompassed within the PMD master plan within 30 days of the rezoning to PM-0.40 (executed by all owners of real property within the PMD master plan as of the date of recordation of such instruments); and (vi) with any PMD master plan amendment and site plan, the applicant shall provide the city with evidence that the applicant has notified all property owners within the PMD master plan, at least 10 days prior to a public hearing, of the proposed PMD master plan amendment or site plan and the public hearing by certified mail with return receipt.

(Ord. No. 5239, § 1, 8-27-13; Ord. No. 5327, § 1, 11-24-15)

Ask a question about Boca Raton law

Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.