§ 28-1763 — Required improvements
Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 28-1763
Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/a77c0d32-8738-4333-87e0-300cec7933d5
Sec. 28-1763. - Required improvements.
(1) The applicant shall install and construct the following improvements: (a) Permanent reference monuments. Monuments shall be placed as required by the city. The monuments shall be of the material, size and length specified by the city; and installation shall be as prescribed in the engineering design standards manual. (b) Streets. All streets shall be constructed and surfaced in accordance with the applicable standards set forth in the engineering design standards manual. The construction shall be subject to inspection by the city and subject to the issuance of any required permits. (c) Curbs, gutters and drainage. When required, curbs, gutters, storm drainage and drainage improvements shall be in accordance with applicable specifications in the engineering design standards manual. The construction shall be in accordance with applicable specifications in the engineering design standards manual. The construction shall be subject to inspection by the city and subject to issuance of any required permits. (d) Fill. Where fill is necessary in a PD plat, it shall be placed to the elevation after settlement indicated by the flood criteria prepared by the city. The type of fill shall be satisfactory to and meet with the approval of the city, which shall require soil tests of the fill and the underlying material in areas where streets or other public facilities are to be located. The fill for the balance of the PD shall be certified by a registered engineer as to type and method of placement. (e) Street designation signs. Street designation signs shall be placed at all street intersections within or abutting the PD plat at the expense of the applicant. Design of such signs shall be approved by the city. (f) Sidewalks. Sidewalks shall be installed in accordance with the applicable specifications set forth in the engineering design standards manual. (g) Water supply. A potable water distribution system shall be constructed and shall be connected to the city water distribution system. Each lot or parcel within the PD plat shall be provided with a connection thereto. All systems and extensions thereto shall be in accordance with the public utilities manual and shall be subject to the approval of the fire chief, utility services director, the county board of health, and the state department of environmental regulation. (h) Fire hydrants. Installation of fire hydrants shall be required, subject to the approval of the fire chief, and utility services director, in accordance with uniform standards established by the Southeastern Underwriters Association and the engineering design standards manual. (i) Sanitary sewer system. A sanitary sewer collection system shall be constructed and connected to the city sewer collection system. Each lot or parcel shall be provided with a connection. All systems, extensions and connections shall be in accordance with the public utility manual and shall be subject to the approval of the utility services department, the county board of health and the state department of environmental regulation. (j) Seawalls and public waterways. 1. All public waterways shall have banks stabilized by seawalls or natural elements. Where seawalls are constructed, the waterside face shall be on the property line. 2. Seawalls, including caps, riprap or natural elements, shall be owned and maintained by the abutting property owners. 3. Seawalls shall be designed to at least the minimum standard set forth in the engineering design standards manual. Two sets of plans sealed by a state-registered professional engineer shall be submitted to the chief code administrator for issuance of a seawall permit. The plan shall indicate elevations, types of soil conditions and the proposed design. A certificate of construction, stating construction has been completed in accordance with the plans, shall be delivered to the city by the engineer in charge of the construction of the seawall. The chief code administrator shall issue a certificate of completion if the seawall as built satisfies all requirements. Any change in plans during construction shall be shown on a revised signed and sealed plan which shall be submitted to the city. (k) Pedestrian/bike paths. Pedestrian/bike paths shall be installed by the applicant. Where pedestrian/bike paths are not located in a public right-of-way and accepted by the city, maintenance by the abutting property owners or the owners' organization shall be required. (l) Streetlights. Streetlights shall be installed by the applicant, subject to the approval of the city, in accordance with the minimum criteria set forth in the engineering design standards manual. (m) Landscaping. Landscaping shall be installed by the applicant in accordance with the approved planned unit development master plan. In addition, any landscaping required pursuant to the provisions of section 28-1711(2) shall be included among the required landscaping for the purposes of this paragraph.
(Ord. No. 324 7, § 1, 9-27-83; Ord. No. 3762, § 1, 3-28-89; Ord. No. 4122, § 77, 9-28-93; Ord. No. 4170, § 35, 9-27-94)
Ask a question about Boca Raton law
Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
