§ 25-7 — Underground installation; relocation

Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Code of Ordinances § 25-7

Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/fd6904a6-e138-4cbd-8047-28ec2e258085

§ 25-7 - Underground installation; relocation.

(a) To the extent required by the city code and not inconsistent with applicable PSC rules and regulations, a registrant shall install its facilities underground. (b) Every registrant which places or constructs telecommunications facilities underground shall maintain appropriate participation in the regional notification center for subsurface installations. (c) Any telecommunications facilities heretofore or hereafter placed under, any public rights-of-way that are found by the city to be unreasonably interfering in any way with the convenient, safe or continuous use or the maintenance, improvement, extension or expansion of the public rights-of-way or any property located under the rights-of-way in which the city has an interest, including, but not limited to, pipes shall, upon written notice to the registrant or its agent, be removed or relocated, within 30 days of the notice, by the registrant at its own expense consistent with F.S. § 337.403. The City Manager may waive or extend the time within which a registrant shall remove or relocate a telecommunications facility, for good cause shown. (d) The registrant shall not, in any way, displace, damage or destroy any facilities, including, but not limited to, gas, sewer, water main, pipe, cable, conduit, fiber optic or other pathway or any other facilities belonging to the city, or to any third party who placed the facilities therein by express authority of the city and in compliance with all of the requirements which accompany such express authority. The registrant shall be liable to the city for the costs of any repairs made necessary by any such displacement, damage or destruction, of facilities belonging to the city, and the registrant shall pay the costs upon demand. In the case of an emergency, the city shall commence repairs without any prior notice to the registrant. The term emergency shall mean a condition that may affect the public's health, safety or welfare. In the event of an emergency the city shall cause the repairs to be made at the facility's owner expense, utilizing city employees, agents or contractors, charge any and all costs, and require reimbursement within 30 days after the submission of the bill by the city to the registrant. Rates for labor and equipment shall be in accordance with city regulations, if applicable. In all other non-emergency circumstances, the registrant shall be given prior written notice. If the repairs are not performed in a reasonable and satisfactory manner within the 30 calendar days after receiving notice, the city may cause the repairs to be made at the facility's owner expense, utilizing city employees, agents or contractors, and require reimbursement within 30 days after the submission of the bill by the city to the registrant. Rates for labor and equipment shall be in accordance with city regulations, if applicable. (e) Subject to F.S. § 337.403, whenever an order of the city requires the removal or change in the location of any telecommunications facility from the public rights-of-way, and the facility owner fails to remove or change the same at its own expense to conform to the directive within the time stated in the notice, the city may proceed to cause the telecommunications facility to be removed. The expense incurred, except as provided in F.S. § 337.403(1)(a)—(c), shall be paid out of any money available, and the expense shall be charged against the owner of the telecommunications facility and levied, collected and paid to the city. (f) Subject to F.S. § 337.403, whenever it shall be necessary for the city to remove or relocate any telecommunications facility, the owner of the telecommunications facility or the owner's chief agent, shall be given written notice ordering the removal or relocation and requiring payment of the costs thereof, and shall be given reasonable time, which shall not be less than 20 nor more than 30 days in which to file an appeal with the City Manager to contest the reasonableness of the order. Upon receipt of a written appeal, the City Manager shall place the matter on a Council agenda for consideration within 45 working days. Should the owner or the owner's representative not appear, the determination of the cost to the owner shall be final, in accordance with F.S. § 337.404. (g) A final order of the city imposed pursuant to Florida Statutes, and applicable provisions of the city code, if any, shall constitute a lien on any property of the owner and may be enforced as provided therein. (h) The city retains the right and privilege to cut or remove any facilities located within the public rights-of-way of the city, as the city manager in the exercise of reasonable discretion may determine to be necessary, appropriate or useful in response to any public health or safety emergency. If circumstances permit, the city shall attempt to notify the owner of the facility, if known, prior to cutting or removing a facility and shall notify the owner of the facility, if known, after cutting or removing a facility. (i) Upon abandonment of a facility within the public rights-of-way of the city, the owner of the facility shall notify the city within 90 days. Following receipt of the notice, the city may direct the facility owner to remove all or any portion of the facility if the city determines that the removal will be in the best interest of the public health, safety and welfare. In the event that the city does not direct the removal of the abandoned facility by the owner of the facility, the owner, by its notice of abandonment to the city, shall be deemed to consent to the alteration or removal of all or any portion of the facility by the city or another utility or person. (j) Notwithstanding anything to the contrary, a facility owner agrees to provide the city, within 30 days of filing or receipt of such, any document that may prevent compliance with the requirements of a permit in connection with the installation, construction or maintenance of its facilities, or use of facilities in the public rights-of-way. This obligation shall only extend to the work in the public rights-of-way for which a facility owner has applied for, or obtained, a permit from the city.

(Ord. 119-00, 12-18-2000)