For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3-1701 — Sidewalks required: new construction and major alterations or additions

Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Community Development Code § 3-1701

Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/1a625989-b691-486e-b729-7d61000b0a8c

Section 3-1701. - Sidewalks required: new construction and major alterations or additions.

A. Generally. To provide protection from traffic and other similar dangers, to provide areas which can be used by pedestrian traffic and to promote the general welfare and safety of the public, all development that abuts a public right-of-way shall provide a sidewalk or sidewalks constructed on, across or adjacent thereto as provided in this division. B. Plan considerations. Except as provided in subsection E hereof, in order to secure a building permit to erect a structure on vacant land, remodel an existing structure where such remodeling will exceed by 50 percent the assessed valuation of the property, or add an additional building or structure to land where a building or structure already exists and where the value of such additional building or structure will exceed by 50 percent the assessed valuation of the property, where a sidewalk does not exist, an applicant for development approval shall provide for construction of a sidewalk either in an easement where the property is abutting the public right-of-way, or upon such right-of-way. The building official, when reviewing the building plans and specifications, shall coordinate with the city engineer to insure that the plans meet all city sidewalk construction specifications and provide desirable, convenient and safe pedestrian routes. C. Specifications and construction. The design, materials, width and location of sidewalks shall be in accordance with city standards as established by the city engineer. D. Schedule of completion. Sidewalk construction shall be required to be completed at the property owner's expense before the building official may issue a certificate of occupancy for any building or structure for which sidewalks are required. E. Exceptions. The community development coordinator may grant an exception under one of the following conditions: 1. If the natural topographical conditions; existing ditches, tree location, inadequate right-of-way or other similar physical conditions peculiar to the premises exist to prevent the reasonable construction of a sidewalk, or 2. The property owner can demonstrate that the subject property would have the only sidewalk within 200 feet of the property on the streets which the property abuts, and that such sidewalk would not form a part of a route leading to a school or public park, and that the absence of a sidewalk would not create an imminent pedestrian hazard by reason of the proximity of the property to motor vehicle traffic. 3. If the property owner qualifies for an exception, the property owner shall pay a fee in lieu of constructing the sidewalk to be used to construct a sidewalk at a future date. The fee will consist of the cost of the sidewalk construction which is excepted as indicated in the city's most recent contract for sidewalk construction plus ten percent for handling and record keeping.

Ask a question about Clearwater law

Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.