Section 3-702. - Minimum criteria and design guidelines.

The following erosion control standards and procedures shall apply to all development: A. Plan review. All erosion control methods to be employed during construction shall be shown on the final construction plans submitted for approval to the building official. If any land clearing or grubbing is proposed, a permit shall be required pursuant to Article 4, Division 13. B. Stabilization of denuded areas. No disturbed area may be left denuded, and every disturbed area must be covered by mulches such as straw, hay, filter fabric, seed and mulch, sod or other approved material to the extent necessary to cover otherwise denuded areas unless the community development coordinator determines that the circumstances do not require such covering. Within 30 days after the final grade is established on any portion of a project site, that portion of the site shall be provided with established permanent soil stabilization measures according to the original construction plan, whether by impervious surface or landscaping. C. Protection and stabilization of soil stockpiles. Soil stockpiles shall be protected at all times by onsite drainage controls which prevent erosion of the stockpiled material. Control of dust from such stockpiles may be required, depending upon their location and the expected length of time the stockpiles will be present. D. Protection of existing storm sewer systems. During construction, all storm sewer inlets receiving drainage from the project shall be protected by sediment traps, such as but not necessarily limited to synthetic hay bales, sod or stone, which shall be maintained and modified as required by construction progress and which shall be approved by the community development coordinator before installation. In no case shall sediment or debris be allowed to enter a public right-of-way or adjacent properties in such a manner as to create a traffic hazard, a public nuisance or a threat to existing drainage ways. Should the erosion and sedimentation controls shown on the plan be insufficient, it is the responsibility of the contractor to provide controls that perform adequately. E. Sediment trapping measures. Sediment basins and traps, perimeter berms, filter fences, berms, sediment barriers, vegetative buffers and other measures intended to trap sediment or prevent the transport of sediment onto adjacent properties or into storm sewer systems or existing water bodies shall be installed, constructed or, in the case of vegetative buffers, protected from disturbance, as the first step in the land alteration process. Such systems shall be fully operative and inspected by the community development coordinator before any other disturbance of the site begins. Earthen structures, including but not limited to berms, earth filters, dams or dikes, shall be stabilized and protected from drainage damage or erosion within one week of installation. F. Sedimentation basins. Areas of three acres or more shall be required to have temporary sedimentation basins as a positive remedy against downstream siltation, which shall be shown and detailed on construction plans. During development, permanent detention areas may be used in place of sedimentation basins, provided they are maintained to the satisfaction of the community development coordinator. The contractor shall prohibit the discharge of silt through the outfall structure during construction of any detention area and shall clean out the detention area before installing any permanent subdrain pipe. In addition, permanent detention areas shall be totally cleaned out and operating properly at the time of final inspection and at the end of any applicable warranty period. When temporary sedimentation basins are used, they shall be capable at all times of containing at least one cubic foot of sediment for each 100 square feet of area tributary to the basin. Such capacity shall be maintained throughout construction by regular removal of sediment from the basin. G. Working in or crossing waterways or water bodies. Land alteration and construction shall be minimized in all waterways and in a 25-foot-wide strip adjacent to the water, measured from the top of the bank of the waterway. Construction equipment and motor vehicles shall be kept out of waterways and the 25-foot buffer area whenever possible. Barriers shall be used to prevent access by construction equipment and motor vehicles. Where in-channel work cannot be avoided, precautions shall be taken to stabilize the work area during land alteration, development and construction to minimize erosion. If the channel or buffer area is disturbed during land alteration, it shall be stabilized within three calendar days after the in-channel work is completed. Silt curtains or other filter/siltation reduction devices shall be installed on the downstream side of the in-channel activity to alleviate increased turbidity. Wherever stream crossings are required, properly sized temporary culverts shall be provided and shall be removed when construction is completed. Upon completion of construction, the area of the crossing shall be restored to a condition reasonably equal to that which existed prior to the construction activity, or to a condition consistent with what is detailed in the development/building approval. H. Swales, ditches, and channels. All disturbed or constructed swales, ditches and channels leading from the site shall be sodded within three days of excavation. All interior swales and detention areas shall be sodded prior to issuance of a certificate of occupancy. I. Trench excavation. The construction of underground facilities shall be accomplished in an expeditious manner, with backfill and restoration lagging no more than 100 feet behind excavation and installation. Where appropriate, excavated materials shall be cast onto the uphill side of any trench and shall not be cast into any channel or channel bank. J. Maintenance. All erosion control devices shall be checked regularly and after each rainfall, and shall be cleaned or repaired as required.

(Ord. No. 6526-00, § 1, 6-15-00; Ord. No. 6928-02, § 43, 5-2-02; Ord. No. 8931-16, § 12, 9-1-16)