§ 32.336 — Meters and LP tank locations and delivery pressure
Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Code of Ordinances § 32.336
Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/e2b4d499-0a32-49cd-9a83-f4e96b446c31
Sec. 32.336. - Meters and LP tank locations and delivery pressure.
Gas service will be delivered to the customer for each premises at one point of service. The location of the meter or tank will be designated by the applicable gas system representative and will typically be within ten feet of the nearest corner of the premises to the gas main and in a location that is expected to be maintained by the customer as accessible, i.e., not expected to be enclosed by fencing or hedges. Locations that have multiple gas meters shall have them installed in the same point of service area as described above. Each gas meter and service regulator and propane LP tank shall be installed in a location readily accessible for reading, inspection, repairs, testing and changing of the meter/tank and operation of the gas shutoff valve, and shall be protected from corrosion and other damage. The customer is responsible for maintaining bushes, vegetation, sprinklers, etc. clear from the meter/tank to allow access and good operational performance. Sprinklers and their flow must be maintained clear of the meter/tank to avoid premature corrosion. Upon discovery of a deficiency and notification to the customer, remedial actions must be made including potentially requiring the relocation of the gas facilities to ensure life safety and to maintain required clearances. If this work is done by CGS personnel, then normal time and material charges will apply. The standard delivery pressure of natural gas at the point of delivery to the consumer (the meter) is established at the option of CGS at either two pounds per square inch (PSI) or seven inches water column (approximately¼ PSI) and for propane (LP) from the tank is established at the option of CGS at either 11 inches water column (approximately ⅜ PSI) or two PSI. An optional delivery pressure above the standard may be requested by the customer or the customer's contractor in advance and may be approved at the sole discretion of CGS. There are advantages to each pressure and not all may be operationally available at any given location.
(Code 1980, § 51.07; Ord. No. 5063, § 1, 1-3-91; Ord. No. 8153-10, § 2, 11-4-10, eff. 1-1-11; Ord. No. 8591-14, § 1, 10-15-14; Ord. No. 9433-21-C, § 1, 2-18-21; Ord. No. 9739-23, § 1, 2-1-24)
Ask a question about Clearwater law
Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.