Sec. 47.007. - Threshold buildings.

Any building classified as a threshold building under the provisions of F.S. § 553.79, referred to in this section as the statute, shall, with regard to the issuance of building permits, special inspections during construction, and the issuance of certificates of occupancy, be subject to the following procedure: (1) The owner of any proposed building classified as a threshold building shall engage a special inspector to conduct all inspections required by the statute. (2) Prior to the issuance of a building permit, the special inspector shall perform structural inspections pursuant to a structural inspection plan prepared by the engineer or architect of record, and shall inspect shoring and reshoring for conformance with the shoring and reshoring plans submitted to the city, and shall furnish to the building services division an affidavit attesting that such inspections have been satisfactorily completed. The affidavit shall include the name and state certification number of the special inspector. (3) Throughout the course of construction the special inspector shall submit to the building services division a weekly report listing all structural elements put in place during the previous week for which inspection is required under the statute. The report shall state that the placement of all such structural elements was observed by the special inspector and found to comply with plans and codes. The report shall bear the signature of the special inspector and shall be due not later than Wednesday following the week covered by the report. A failure to file the weekly report by 4:00 p.m. on Friday following the week covered by the report shall be considered due cause for the building official to order construction stopped until all necessary reports have been filed. (4) Upon completion of construction of the threshold building, and prior to the issue of a certificate of occupancy, the special inspector and the contractor shall file with the building official affidavits attesting that all requirements of the statute have been complied with.

(Ord. No. 5767-95, § 1, 3-16-95)