Sec. 47.111. - Required inspections.
The permit holder or his agent shall request a final inspection upon completion of the work, and other inspections as required by the permit, in a timely manner. The building official upon request by the permit holder or his agent shall make the following minimum inspections and such other inspections as may be necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the standard codes adopted in this chapter: (1) Roof. (a) Deck. To be made after the deck is clean, tightly fitted, sound and free of debris. (b) Dry-in inspection. During the course of applying roofing paper. (c) Roof covering inspection. During the course of installing roof covering material. (d) Tile inspection. During the course of installing roof tiles, if applied. (e) Final. After all work is completed on roof. (2) Gas. (a) Underground piping inspection. To be made after trenches or ditches are excavated, after piping or tanks are installed, and before backfill is put in place. All joints shall be open and piping shall be uncovered at least every 20 feet. Tank tie down strips shall be visible. (b) Rough-in inspection. To be made after the roof, framing, fireblocking and bracing are in place and all gas and vent piping is complete, and prior to the installation of wall or ceiling membranes. (c) Final inspection. To be made after the equipment and vent piping are in place and properly connected. (d) Exceptions. When one of the following appliances has been installed, only a final inspection shall be required, provided that the installer shall have complied with the requirements for underground piping and the installer shall have furnished a notarized letter to the building official before requesting final inspection. The letter shall contain the address and permit number of the job, shall state that the piping and appliance are free of leakage, and shall be signed by the license holder or other authorized person. Any such appliance may be placed in operation prior to requesting final inspection. This exception shall be available for the installation of any one of the following: 1. Water heater; 2. Pool or spa heater; 3. Mobile home furnace; or 4. Other appliance as may be approved by the building official. (e) Testing. Testing shall be done in accordance with Part 4 of NFPA 54 adopted by section 47.051, except that section 4.1.4 is amended to read in its entirety: 4.4.4. Test of pipe for tightness. a. Procedure and precautions. Before any system of consumer's gas piping is put in service, it shall be carefully tested to assure that it is gas tight. Where any part of the system is to be enclosed or concealed, this test shall precede the work of closing in. To test for tightness, the piping shall be filled with air or inert gas, but not with any other gas or liquid. In no case shall oxygen ever be used. b. Method of testing. Low pressure (not in excess of 0.5 psi) gas piping shall withstand a pressure of at least 10 psi or 6 inches of mercury for not less than 10 minutes without showing any drop in pressure. Higher pressure gas piping shall withstand a pressure of at least twice the maximum pressure to which the piping will be subjected in operation, but not less than 10 psi, for not less than 10 minutes without showing any drop in pressure. Piping, regulators, valves and appliances shall not be subjected to pressures higher than their rated capacity. c. Test instruments. For pressure tests, pressure shall be measured with a manometer, slope gauge, or other accurate and sensitive pressure indicating device, the scale of which is so graduated that variations in pressure may be accurately read. A bourdon tube type gauge calibrated in a maximum of quarter-pound increments shall be acceptable. There shall be a tag attached to the gauge indicating the date, time and pressure applied to the system upon completion of the test. (3) Pools and spas. (a) Shell. To be made when excavation and structural framework, as appropriate, are complete. (b) Deck. To be made after electrical bonding is complete and pool plumbing is installed. (c) Final. To be made when pool or spa is complete and ready for use.
(Ord. No. 5767-95, § 1, 3-16-95)
Ask a question about Clearwater law
Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.