§ 51.1601 — General requirements for other development
Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Community Development Code § 51.1601
Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/57283fea-bd22-4af4-b145-093c7b45020e
Sec. 51.1601. - General requirements for other development.
All development, including man-made changes to improved or unimproved real estate for which specific provisions are not specified in this chapter or the Florida Building Code, shall: (1) Be located and constructed to minimize flood damage; (2) Meet the limitations of Section 51.1204 if located in a regulatory floodway; (3) Be anchored to prevent flotation, collapse or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during conditions of the design flood; (4) Be constructed of flood damage-resistant materials; (5) Have mechanical, plumbing, and electrical systems above the design flood elevation or meet the requirements of ASCE 24, except that minimum electric service required to address life safety and electric code requirements is permitted below the design flood elevation provided it conforms to the provisions of the electrical part of building code for wet locations; and (6) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage.
(Ord. No. 9189-18, § 1, 11-1-18)
Ask a question about Clearwater law
Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.
