§ 13-169 — Water and wastewater extension regulations
Code of Ordinances of the City of Coconut Creek, Florida (Codified through Ordinance No. 2026-016, enacted June 25, 2026. (Supp. No. 6)) · Coconut Creek Code of Ordinances § 13-169
Corpus is an independent public-information project, not the official City of Coconut Creek website. Stable reference: corpuslaw.us/code/675805cd-4a98-45cc-8349-80089b0737e9
Sec. 13-169. - Water and wastewater extension regulations.
(a) This section and the following ten (10) sections of the Code of Ordinances are hereby declared to be the "Water and Wastewater Extension Regulations" of the city. Property owners who wish to develop or redevelop their property may be required to execute a "water and wastewater agreement" setting forth such reasonable provisions governing the property owners and the city's responsibility pertaining to the installation of water and wastewater service facilities; the connection of consumer installations with the facilities of the city; the manner and method of payment of impact fees; standards of construction or specifications; time commitments to "take and use water and wastewater services"; engineering errors and omissions; rules, regulations and procedures of the city and other reasonable regulations. (b) The city is willing to provide, in accordance with the provisions hereinafter set out, central water and wastewater facilities, and to extend such facilities by way of water distribution mains and wastewater collection and transmission mains, and to thereafter operate such facilities so that the occupants of each residence, building, or unit constructed on properties will receive an adequate water and wastewater service from the city. (c) General requirements. The city hereby adopts this regulation regarding the extension of all water and wastewater facilities within its service area, as further defined in section 13-169.1, "Definitions." In addition to the other provisions set forth herein, a real property owner who plans to extend the city's water and/or wastewater infrastructure must, at a minimum and at his/her/its sole expense: (1) Build infrastructure that meets all standards and specifications described herein, and in accordance with engineering plans that have been prepared by a Florida registered professional engineer and previously approved by all federal, state, or county regulatory agencies prior to submitting an application for a city engineering permit to the city pursuant to section 13-40, "Engineering permits," as may be amended; (2) Build any supporting infrastructure, to ensure that water quality standards are met, or to ensure compatibility for connection to then-existing city-owned facilities, as deemed necessary by the city engineer, or designee, in his/her sole discretion based on the standards and specifications described herein; (3) Build infrastructure terminus that provide ready access to each individual adjacent lot or tract of land, as described herein. The access point must be provided at the property line(s) of the unserved adjacent lot(s) or tract(s), as determined by the city engineer, or designee, based on the surrounding conditions. As such, no partial or halfway installations will be permitted. New development extending water and/or wastewater facilities must provide adequate assurance to the city that unserved adjacent lots or tracts will have access to infrastructure for purposes of extension; and (4) Restore any disturbed lands as required by the city, the City of Parkland, or unincorporated Broward County based on having concurrent jurisdiction within the city's service area. (5) Enter into a water and wastewater agreement with the city pursuant to subsection 13-169(a). (d) Exceptions to adjacent property access required under subsection 13-169(c)3 herein. To the extent that a real property owner can demonstrate that the city's mandatory adjacent property access requirement, as applied to the real property owner's land, will cause an unfair, disproportionate, or inordinate burden upon the individual's property, the city engineer, or designee, may grant appropriate relief consistent with the provisions herein. Evidence of expenses or costs, without consideration of the totality of the circumstances, will not be sufficient to show an unfair, disproportionate, or inordinate burden as required by this subsection. (1) To prove unfair, disproportionate, or inordinate burden, the property owner must have standing to challenge the regulation and has the initial burden of: a. Showing the degree of burden suffered by the property owner; b. Identifying and resolving any specifc environmental, public health, and safety concerns that may arise if the regulation is not applied; c. Providing justification for why the extension is not needed; and d. Indicating the specific relief sought. (2) The city engineer, or designee, will determine if the property owner has met the burden of demonstrating sufficient facts to support an exception. The decision to grant relief pursuant to this section rests in the sound discretion of the city engineer, or designee, in the exercise of his/her professional expertise and accepted industry practices. the relief granted must be based on the following factors: a. The degree of burden (or potential burden) suffered by the property owner; b. The nature and significance of the public interest that is served by the application of the regulation to the property; c. The purposes that the extension regulations are intended to serve; d. The burden (or potential burden) carried by other property owners who are similarly situated, if any; and e. The burden that will be carried by other property owners if the waiver is granted. (3) Resolution of extension of facilities disputes. The decision of the city engineer may be appealed pursuant to section 13-34, "Appeals."
(Ord. No. 145-95, § 1, 10-13-94; Ord. No. 2024-048, § 2, 10-24-24)
Ask a question about Coconut Creek law
Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.
