§ 13-537.1 — Wireless communications facilities outside of city rights-of-way
Code of Ordinances of the City of Coconut Creek, Florida (Codified through Ordinance No. 2026-016, enacted June 25, 2026. (Supp. No. 6)) · Coconut Creek Code of Ordinances § 13-537.1
Corpus is an independent public-information project, not the official City of Coconut Creek website. Stable reference: corpuslaw.us/code/0b804242-550d-4ddc-b5c0-0c1ad0c8a131
Sec. 13-537.1. - Wireless communications facilities outside of city rights-of-way.
(a) This section does not authorize a person to collocate or attach wireless communications facilities, including any antenna, micro wireless facility, or small wireless facility, nor construct or install wireless communications facilities on a privately owned utility pole, a utility pole owned by an electric cooperative or a municipal electric utility, a privately owned wireless communications support structure, or other private property without first obtaining the consent of the property owner. (b) A wireless communications facility may be allowed on property owned by the city. The city may authorize the use of city property after a communications service provider submits the appropriate permit documentation and executes a written agreement acceptable to the city setting forth the applicable terms and provisions of such use. The city shall have no obligation whatsoever to execute such written agreement even if the applicant does meet the criteria set forth herein. As part of any written agreement, the city shall receive reasonable rental fees based on fair market value for the use of public lands, structures, and buildings. Any permit to develop a wireless communications facility on city-owned property, including city-owned structures, granted pursuant to this subdivision shall not become effective until the owner of the communications facility and the city have executed a written agreement. (c) Minimum standards for all wireless facilities outside rights-of-way. Except where a special land use grants otherwise, every wireless facility outside rights-of-way must meet the following minimum standards: (1) As part of a building, electrical, and/or an engineering permit, a site development plan shall be presented for approval to the department of sustainable development. Each application for a proposed wireless facility shall include all requirements for site development plan approval as required by sections 13-546 through 13-549 of the land development code. The city manager or his/her designee may waive all or some of these provisions for concealed towers which are designed to emulate existing structures already on the site, including but not limited to light, power, or telephone poles. Approval of the city manager or his/her designee to ensure consistency with the definition of concealed facility is required. Each application shall contain a rendering or photograph of the tower including, but not limited to, colors and screening devices. (2) Proposed new freestanding structures. a. When the construction of a new freestanding tower is proposed, a statement shall be submitted, including technical data demonstrating that all antenna attachments and collocation options (including all potentially useable high voltage electrical transmission (HVET) poles), replacement towers and other elevated structures within the proposed service area, and alternative antenna configurations have been examined, and found unacceptable. The report shall include reasons why existing facilities, such as HVET poles and other elevated structures, are not acceptable alternatives to a new freestanding tower. The report regarding the adequacy of alternative existing facilities or the replacement or mitigation of existing facilities to meet the applicant's need or the needs of service providers indicating that no existing wireless facility could accommodate the applicant's proposed facility shall consist of any of the following: 1. No existing wireless facility located within the geographic search ring meets the applicant's engineering requirements, and why. 2. Existing wireless facilities are not of sufficient height to meet the applicant's engineering requirements, and cannot be increased in height. 3. Existing wireless facilities do not have sufficient structural integrity to support the applicant's proposed wireless facility and related equipment, and the existing facility cannot be sufficiently improved or replaced. 4. Other limiting factors that render existing wireless facilities unsuitable. Technical data included in the report shall include certification by a radio frequency engineer or other qualified professional, which qualifications shall be included, regarding service gaps or service expansions that are addressed by the proposed wireless facility, and accompanying maps and calculations demonstrating the need for the proposed wireless facility. All new freestanding towers shall have the capacity to permit multiple users; at a minimum monopole towers shall accommodate four (4) users and self-support/lattice or guyed structures shall, at a minimum, accommodate five (5) users. (3) Aircraft hazard. Prior to the issuance of a building permit by the building division, department of sustainable development, the applicant shall provide evidence that the wireless facilities or antennas are in compliance with Federal Aviation Administration (FAA) regulation, and F.S. Ch. 333, pertaining to airport airspace protections. Where an antenna will not exceed the highest point of the existing structure upon which it is to be mounted, such evidence shall not be required. (4) Approval required from other governmental agencies. Each application for a wireless facility may be required to include written approval or a statement of no objection from other federal or state agencies that may regulate wireless facilities siting, design, and construction. (5) FCC emissions standards. All proposed wireless facilities shall comply with current radio frequency emissions standards of the Federal Communications Commission, or other legal regulating body. Applicants shall furnish a statement from a qualified professional engineer certifying to the compliance with such standards for the proposed installation of wireless equipment, both individually and on a cumulative basis. (6) Buffering. a. For ground mounted communications facilities, an eight (8) foot opaque fence or wall constructed in accordance with section 13-379, "Fences, walls and enclosures," of the land development code, as measured from the finished grade of the site, shall be required around the base of any lattice structure and may be required around any accessory buildings or structures. b. For ground mounted communications facilities, landscaping, consistent with the requirements of chapter 13, article II, division 4, subdivision IV of the land development code, shall be installed around the entire perimeter of any fence or wall. Additional landscaping may be required around the perimeter of the fence or wall and around any or all anchors or supports if deemed necessary to buffer adjacent properties. The city may require landscaping in excess of the requirements of the city code in order to enhance compatibility with adjacent residential and nonresidential land uses. Landscaping shall be installed on the outside of the perimeter fence or wall. Landscaping consistent with the perimeter and on-site requirements of chapter 13, article III, division 4, subdivision IV of the land development code, shall be installed around any accessory buildings or structures. c. Towers including appurtenances shall have a minimum horizontal separation of ten (10) feet from any city-owned utility and city-owned underground facility. Ten (10) feet from closest outer diameter (OD) or outer edge (OE) to OD or OE. (7) High voltage and "no trespassing" and other warning signs. a. If high voltage is necessary for the operation of the tower or any accessory structures, "HIGH VOLTAGE - DANGER" warning signs shall be permanently attached to the structure, fence, or wall and shall be spaced no more than forty (40) feet apart measured on a horizontal plane. b. Where an enclosure is required, "NO TRESPASSING" warning signs shall be permanently attached to the fence or wall and shall be spaced no more than forty (40) feet apart measured on a horizontal plane. c. The letters for the "HIGH VOLTAGE - DANGER" and "NO TRESPASSING" warning signs shall be at least six (6) inches in height. The two (2) warning signs may be combined into one (1) sign. The warning signs shall be installed at least five (5) feet above the finished grade of the structure, fence or wall. d. Where an enclosure is required, the warning signs may be attached to freestanding poles or wireless support structures only if the content of the signs is or will be obstructed by landscaping. e. Signs noting federal registration (if required) shall be attached to the wireless facility in compliance with federal regulation. (8) Equipment storage. Mobile or immobile equipment not used in direct support of a wireless facility shall not be stored or parked on the site of the wireless facility, unless repairs to the wireless facility is being made. (9) Signs and advertising. The use of any portion of a wireless facility or support structure for signs or advertising purposes including company name, banners, streamers, etc., shall be strictly prohibited. For purposes of emergency contact, the owner of the wireless facility shall place one (1) identification label on the wireless facility or support structure or its equipment not larger than two (2) square feet in size advising of the name and contact telephone number of the owner of the wireless facility and, if applicable, FCC antenna structure registration number. (10) Accessory buildings or structures. All accessory buildings or structures shall meet all building design standards as listed in this code, and in accordance with the provisions of the Florida Building Code. All accessory buildings or structures shall require a building permit issued by the building division, department of sustainable development. (11) Colors. Except where superseded by the requirements of other county, state, or federal regulatory agencies possessing jurisdiction over wireless facilities and their support structures, and accompanying equipment cabinets/hubs, same shall be painted or constructed in neutral colors, or design wrapped, for the purpose of blending into the surrounding environment or complying with the city's public art master plan. (12) Non-interference. Each application to allow construction of a wireless facility shall include a certified statement from a qualified professional engineer that the construction and placement of the wireless facility, will not unnecessarily interfere with public safety communications and the usual and customary transmission or reception of radio, and television, service enjoyed by adjacent residential and non-residential properties. A statement shall be prepared by a registered professional engineer identifying any interference that may result from the proposed construction and placement. Whenever the city has encountered radio frequency interference with its public safety communications equipment, and it believes that such interference has been or is being caused by one (1) or more wireless facilities, the city shall provide notification to all communications service providers operating in the city of possible interference with the public safety communications equipment, and upon such notifications, the owners shall use their best efforts to cooperate and coordinate with the city and among themselves to investigate and mitigate the interference, if any, utilizing the procedures set forth in the joint wireless industry-public safety "Enhanced Best Practices Guide," released by the FCC in Appendix D of FCC 04-168 (released August 6, 2004), including the "good engineering practices," as may be amended or revised by the FCC from time to time in any successor regulations. If any equipment owner fails to cooperate with the city in complying with the owner's obligations under this section or if the FCC makes a determination of radio frequency interference with the city public safety communications equipment, the owner who failed to cooperate and/or the owner of the equipment which caused the interference shall be responsible, upon FCC determination of radio frequency interference, for reimbursing the city for all costs associated with ascertaining and resolving the interference, including but not limited to any engineering studies obtained by the city to determine the source of the interference. For the purposes of this subsection, failure to cooperate shall include failure to initiate any response or action as described in the "best practices guide" within twenty-four (24) hours of city's notification. (13) Inspection report. a. Wireless communications facility owners shall submit a report to the city building division, department of sustainable development, certifying structural and electrical integrity on the following schedule: 1. Monopole structures—once every five (5) years; 2. Self-support/lattice structures—once every two (2) years; and 3. Guyed structures—once every two (2) years. b. Inspections shall be conducted by an engineer licensed to practice in the State of Florida. The results of such inspections shall be provided to the building division, department of sustainable development. Based upon the results of an inspection, the building official may require repair or removal of a wireless facility. c. The building division, department of sustainable development, may conduct periodic inspections, with the cost of such inspection paid by the tower owner and/or owner of the land in which the tower is situated, of towers containing wireless facilities to ensure structural and electrical integrity. The owner of the tower may be required by city to have more frequent inspections should there be reason to believe that the structural and electrical integrity of the tower is jeopardized. The city reserves the right to require additional inspections if there is evidence that the tower has a safety problem or is exposed to extraordinary conditions. d. Following the completion of construction of a wireless facility in the city, the owner shall submit a report to the department of sustainable development certifying "as-built" compliance with the permitted structural and electrical parameters. The city shall conduct a post-construction inspection to verify the submitted report and confirm the constructed facility does not present a public safety hazard. e. An owner of a wireless communications facility located within the city shall maintain its communications facility in a manner consistent with accepted industry practice and applicable law. (14) Existing towers. a. Notwithstanding the above provisions of this section, towers in existence as of January 23, 1997, may be replaced with a tower of equal or less visual impact after approval by the city manager or his/her designee, and proceed through the permitting process outline herein. However, if the proposed new tower would not be consistent with the minimum standards under this section, replacement must be approved by the city commission as a special land use. (15) Modifications or replacements. Modification or replacement of any communications facilities in the city shall be subject to permit approval of the city, subject to the exception provided herein. Any removal or replacement of communications facilities that substantially changes the physical dimensions of an antenna node site shall be subject to permit approval. Notwithstanding anything to the contrary in this section, for an "eligible facilities request" under section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, (47 USC § 1455(a)), the application shall be subject only to the city manager's or his/her designee's review and approval process. (16) Cooperative determination. In the event an applicant demonstrates, in writing, to the satisfaction of the city manager, or designee, that the operation of this section produces a result which is either: (i) overly burdensome and a hardship on the applicant, and is inconsistent with the general public welfare; or (ii) inconsistent with the intent of the particular provisions of this section, and inconsistent with the general public welfare, the applicant and the city manager, or designee, shall cooperate to determine an appropriate location and aesthetic design for the proposed facility. In any such cooperative determination there shall be a preference for collocation with existing wireless facilities or other utility facilities, or for use of unused capacity on existing wireless facilities. Where facilities cannot be collocated and no such unused capacity exists, there shall be a preference for the use of free-standing concealed type structures which are consistent, to the extent possible, with this section. The city manager, or designee, may require a written statement certifying that the proposed location is needed by a communication services provider to close a significant gap in its service to the affected areas. (d) Zoning for wireless communications facilities outside of the city's rights-of-way. (1) All wireless communications facilities, ("WCF"), installations located outside the city's rights-of-way, but still subject to the city's jurisdiction, require issuance of the appropriate permits prior to installation. New micro wireless facilities and neutral host antenna facilities shall be allowed in the following zoning districts subject only to an administrative review. All other WCFs are subject to the grant of a special land use as an accessory use in the following zoning districts: a. (B-2) Convenience shopping district; b. (B-3) Community shopping district; c. (B-4) Regional shopping district; d. (IO-1) Industrial office district; e. (IM-1) Industrial manufacturing district; f. (PCD) Portions designated a land use as noted in e. above; g. (RM-10) Medium high density multiple-family; h. (CF) Community facility; i. (P) Parks and recreation; j. (PUD) portions designated a land use as noted in i. above; k. (SU) Special utility overlay district (subject to the scope of the utility easement); and l. (PMDD) Planned MainStreet Design District. (2) Exceptions to zoning. The location of a new wireless communications facility outside of city rights-of-way in any zoning district other than those districts specified in this section shall be prohibited unless approved as a special land use and subject to the additional conditions specified below: 1. Antenna attachments (including DAS systems) proposed for location on utility poles outside of city rights-of-way may only be located on existing franchised utility poles or poles owned by the city and for poles owned by the city, subject to a separately executed agreement with the city. 2. The antenna shall be of a size and placement that is structurally compatible with the engineering design of the wireless support structure or utility pole desired for placement pursuant to the Florida Building Code (and relevant amendments) and attested to by a registered engineer. 3. The antenna shall not extend more than ten (10) feet above the existing pole height for which the antenna is proposed to be attached. If the pole is replaced to withstand the addition of communications equipment, then the same restriction shall apply except that the replacement utility pole may be no more than ten (10) feet higher than the adjacent pole heights. 4. No commercial advertising shall be allowed on the antenna, wireless facility equipment or support structure. 5. The location of a new wireless communications facility, including any micro wireless facility located on a tower, in any nonresidential zoning district other than those districts specified in this section, must be proposed as a concealed facility or monopole. (3) Subject to the above, a wireless communications facility that is proposed as part of existing high voltage electrical transmission poles located within the special utility overlay area shall be constructed as part of the existing high voltage electrical transmission ("HVET") poles or as replacements for existing HVET poles, but shall not be more than twenty (20) feet in height over the original existing HVET poles. The height restriction for utility poles within the special utility overlay area shall be limited to one hundred twenty (120) feet. No freestanding wireless communications facilities constructed exclusively for personal wireless services shall be permitted. Non-concealed attachments shall only be allowed on HVET utility poles subject to approval by the utility company, the development standards set forth in this subdivision and in compliance with existing legal restrictions contained in any easement or deed granted for the realty containing said HVET poles. Associated non-antenna equipment cabinets for wireless communications facilities on HVET poles shall be located on the ground and landscaped/screened in accordance with this subdivision. (4) Subject to the above, freestanding wireless communications facilities are allowed as a special land use in the industrial zoning districts and industrial portions of a planned commerce district (PCD) zoning district, provided the wireless communications facilities are an accessory use. This provision does not preclude the use of vacant property in the industrial zoning district; however, a concealed facility or monopole must be utilized and processed as a special land use. (5) A special land use granted pursuant to this section shall be revocable by the city commission upon a showing that the wireless communications facility has been abandoned as defined herein. (6) Exception for satellite earth station (SES). Satellite earth stations which are one meter (39.37 inches) or less in size, intended to receive signals from orbiting or geo-stationary satellites and other sources, or to link wireless service sites together by wireless transmission of voice or data shall be permitted as accessory uses in all zoning districts. (e) Design standards. (1) Height/setbacks and related location requirements related to towers, monopoles, and wireless support structures. a. The height of a tower shall not exceed one hundred fifty (150) feet. Tower height shall be measured from the crown of the road of the nearest public street. b. Towers shall conform with the setbacks established for the underlying zoning district. c. Monopole, lattice or guyed structures shall not be permitted within two hundred (200) feet of any residential district or residential portion of a PUD/PMDD unless the property is designated as a part of the special utility overlay area. d. Monopole, lattice or guyed structures shall not be located within seven hundred fifty (750) feet of any existing monopole, lattice or guyed structures. This distance restriction shall not apply to any monopole, lattice or guyed structure owned by a public agency or entity or be part of an AM broadcasting tower array. e. All buildings and other structures to be located on the same property as a tower shall conform with the setbacks established for the underlying zoning district. (2) Building or rooftop concealed antennas shall be subject to the following minimum standards: a. No lettering, text, logos, or commercial advertising shall be allowed on an antenna; b. No signals, lights, or illumination shall be allowed on an antenna, unless required by the Federal Communications Commission or the Federal Aviation Administration; c. Any related unmanned equipment compound or cabinet shall not contain more than seven hundred fifty (750) square feet of gross floor area or be more than twelve (12) feet in height, and d. If the equipment cabinet is located on the roof of the building, the area of the equipment cabinet shall not occupy more than twenty-five (25) percent of the roof area. e. Approval of the city manager or his/her designee to ensure consistency with the definition of concealed facility is required. Each application shall contain a rendering or photograph of the antenna including, but not limited to, colors and screening devices. f. Concealed antennas attached to, but not above, rooftop structures shall be exempt from a prohibition against extending more than twenty (20) feet above the highest point of a roof. (3) Building or rooftop non-concealed antennas shall be subject to the following minimum standards: a. Antennas shall only be allowed on nonresidential structures that are at least thirty (30) feet tall. Antennas may be placed on nonresidential structures that are less than thirty (30) feet tall in the parks and recreation or community facility districts, if public safety needs warrant the antenna; b. Antennas may not extend more than twenty (20) feet above highest point of a roof. Antennas may exceed twenty (20) feet above the roof in the parks and recreation or community facility districts if public safety needs warrant additional height; c. Antennas, and related equipment compounds or cabinets, shall be located or screened to minimize the visual impact of the antenna upon adjacent properties and shall be of a material or color which matches the exterior of the building or structure upon which it is situated; d. No lettering, text, logos, or commercial advertising shall be allowed on an antenna; e. No signals, lights, or illumination shall be permitted on an antenna, unless required by the Federal Communications Commission or the Federal Aviation Administration; f. Any related unmanned equipment compound or cabinet shall not contain more than seven hundred fifty (750) square feet of gross floor area of where it is proposed to be placed or be more than twelve (12) feet in height; and g. If the equipment cabinet is located on the roof of the building, the area of the equipment cabinet shall not occupy more than twenty-five (25) percent of the roof area. (4) Antenna types. To minimize adverse visual impacts, concealed antenna types shall be preferred. If a non-concealed antenna is proposed, the applicant shall be required to demonstrate, in a technical manner acceptable to the city manager or his/her designee, why the concealed antenna (i.e. an antenna incorporated into the architecture of the building or fully screened from view from sight proximate to the antenna) cannot be used for the particular application. This does not preclude a combination of the various types of antenna, including flush-mounting if concealed is not feasible. (5) Antenna dimensions. Antenna dimensions shall be reviewed by the city manager or his/her designee as required by existing technology. A statement shall be submitted, prepared by a professional registered engineer licensed to practice in the state or qualified professional exempt pursuant to F.S. § 417.003, as may be amended, and competent to evaluate antenna choices, to certify the need for the required dimensions, to include power level and type.
(Ord. No. 2018-012, § 2, 6-28-18)
Ask a question about Coconut Creek law
Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.
