Sec. 105-33. - Demolition standards.
(a) A demolition permit for total or substantial demolition shall not be issued unless the following criteria are satisfied: (1) Historic properties. Prior to the issuance of a demolition permit for a designated building, structure, improvement, site district, or zone the applicant must show full compliance with article VIII, historic preservation, section 8-107 of the Zoning Code. (2) Demolition permits associated with new construction. Demolition permits issued in conjunction with new construction shall require the following: a. Issuance of a building permit application for new construction; b. Payment of all applicable upfront fees associated with the new construction permit. c. The development site shall be fenced with a fence material type and height pursuant to section 105-30(1)(f), construction fencing. d. Failure to commence construction. Within single-family dwelling (SFR) or duplex (MF1) zoned districts construction shall commence within 30 days of demolition permit issuance. Construction shall commence within 90 days of demolition permit issuance for multi-family, mixed-use, special use and preservation zoned districts. In cases of complex demolition requiring additional time to complete, the building official may grant an extension of time not to exceed an additional 90 days for threshold buildings, as defined by F.S. § 553.71. Failure to commence construction within these timeframes shall require the applicant to restore the site as follows: i. The development site shall be properly graded; ii. The entire site shall be sodded with drought and salt-tolerant sod, such as bahia sod or seashore paspalum sod; and (3) Standalone demolition permits. Where a demolition permit is submitted independently of a building permit for new construction, the applicant shall be required, upon completion of demolition, to restore the property in accordance with subsection (a)(2)(d) unless a building permit for new construction has been issued and construction has commenced. (4) Unsafe structures. Demolition permits associated with the demolition of unsafe structures shall comply with article III, unsafe structures, section 105-91. a. All mud, dirt, or debris deposited on any street, alley, crosswalk, sidewalk, or other public property as a result of demolition or construction activity shall be removed and broom-cleaned to the extent possible at the end of each day that work has occurred. Debris shall be disposed of in accordance with all applicable laws.
(Ord. No. 2026-08, § 2, 2-24-2026)
Ask a question about Coral Gables law
Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.