Sec. 117-5. - Standards for subdivision improvements.

The following design and construction standards shall apply: (1) Monuments. Monuments shall be placed at all block corners, angle points, points of curves in streets, and at intermediate points as shall be required by the director of public works. The monuments shall be of such material, size and length as may be approved by the public works director. (2) Streets. Streets, alleys and appurtenances thereto shall conform to the following: a. All streets and alleys shall be constructed and surfaced in accordance with the standard specifications of the public works department. Such construction shall be subject to inspection and approval by the public works director. b. Drainage and drainage structures shall be provided on all streets and alleys in accordance with the standard specifications of the public works department. In addition, curbs and gutters shall be provided in all commercial, apartment, hotel, industrial and similar districts. Such construction shall be subject to the inspection and approval by the public works director. (3) Sidewalks. In all commercial, multi-family, industrial and similar districts concrete sidewalks shall be constructed along each side of every street shown on the plat in accordance with the standard specifications of the public works department. (4) Street name signs. Street name signs shall be placed at all street intersections within or abutting the subdivision. Such signs shall be of a type approved by the city, and shall be placed in accordance with the standard specifications of the public works department. (5) Street lighting. Street-lighting facilities shall be provided and installed in all subdivisions. The minimum requirement for such lighting facilities shall be one foot candle average maintained. However, no luminance ratio shall exceed twelve-to-one (12:1). A detailed plan showing the light standards, the locations of the light, wiring diagram and construction details, for the system shall be submitted to the public works director for approval. (6) Water supply. The subdivider shall furnish the public works director a plan showing all proposed and existing water mains, and give sufficient proof that arrangements have been completed to insure installation of such water system. The water main plan shall be subject to approval by the public works director. (7) Fire hydrants. Fire hydrants shall be installed in all subdivisions. Evidence shall be submitted to give proof that arrangements have been made to complete installation of such hydrants. The plan for hydrant locations shall be subject to approval by the public works director. (8) Sanitary sewer. Where a public sanitary sewer is reasonably accessible, each lot within the subdivided area shall be provided with a connection thereto. All connections shall be subject to the approval of the public works director. (9) Parkway landscaping. All parkways shall be properly treated with topsoil, sprigged, landscaped, and maintained until growth is relatively permanent. The plan for such landscaping shall be equal to the established standards of the city, and subject to the approval of the public service director. (10) Land filling. All land within subdivisions shall be filled to minimum average settled elevation of plus six feet above the national geodetic vertical datum (NGVD) or mean sea level (MSL), and no elevation shall be less than plus five and five-tenths (5.5) feet above the national geodetic vertical datum (NGVD) or mean sea level (MSL); provided, however, that where bulkheads are provided on waterfront property, the land within a distance of ten feet from the bulkheads may gradually slope to the minimum required elevation of such bulkheads. The plan and additional documents showing proposed elevations, test borings, sources and types of fill, methods of filling, and method of disposal of vegetation and undesirable materials shall be subject to approval by the public works director. After completion of land filling, the subdivider shall submit to the city a topographical survey prepared by a registered land surveyor or engineer to assure compliance with the minimum standards of this subsection. (11) Bulkheads. When contour of the land is changed, bulkheads shall be required on all waterfront property. The minimum elevation of such bulkheads shall be plus four and five-tenths (4.5) feet national geodetic vertical datum (NGVD) or mean sea level (MSL), and the type and design shall conform to the public works department standards and shall be subject to the approval by the public works director and the city's structural engineer. (12) Bridges. Bridges shall be provided by the subdivider across all canals and waterways to provide adequate ingress and egress to all areas. The design of such bridges shall be in accordance with the public works department standards and shall be subject to approval by the public works director. (13) Underground utilities. All utility lines shall be installed in conformance with the requirements of chapter 78—utilities.

(Ord. No. 2020-31, § 5(Exh. B), 11-10-2020)