Sec. 2-1057. - Construction manager-at-risk.
(a) Policy. It is the policy of this city to publicly announce all requirements for a construction manager-at-risk as defined in the appropriate Florida Statute, including F.S. § 287.055, Consultants' Competitive Negotiation Act, and to negotiate contracts on the basis of demonstrated competence and qualification for the type of services required at fair and reasonable prices. (b) Selection. (1) For each proposed project, the public works director or designee, upon consultation with the chief procurement officer or designee, shall recommend a selection committee, with the city manager's approval, to evaluate current statements of qualifications and performance data on file with the city, together with those that may be submitted by other firms regarding the proposed project, and shall conduct discussions with, and may require public presentations by, no fewer than three firms regarding their qualifications, approach to the project, and ability to furnish the required services. (2) The public works director or designee, upon consultation with the chief procurement officer or designee, in conjunction with the selection committee, shall select in order of preference no fewer than three firms deemed to be the most highly qualified to perform the required services. In determining whether a firm is qualified, the public works director or designee, upon consultation with the chief procurement officer or designee, may consider such factors as the ability of professional personnel; past performance; willingness to meet time and budget requirements; location; recent, current, and projected workloads of the firms; and the volume of work previously awarded to each firm by the city, with the object of ranking the companies based on qualifications and selection of the most highly qualified firms. The public works director or designee, upon consultation with the chief procurement officer or designee, in conjunction with the selection committee, may request, accept, and consider proposals for the compensation to be paid under the contract only during competitive negotiations under subsection (c)(2) of this section. (c) Negotiation. (1) The public works director or designee, upon consultation with the chief procurement officer or designee, shall negotiate a contract with the most qualified firm for professional services at compensation which the public works director or designee, upon consultation with the chief procurement officer or designee, determines is fair, competitive, and reasonable. In making such determination, the public works director or designee, upon consultation with the chief procurement officer or designee, shall conduct a detailed analysis of the cost of the professional services required in addition to considering their scope and complexity and shall negotiate a guaranteed maximum price including overhead and profit with approval from the city manager. For any lump-sum or cost-plus-a-fixed-fee professional service contract over $100,000.00, the chief procurement officer shall require the firm receiving the award to execute a truth-in-negotiation certificate stating that wage rates and other factual unit costs supporting the compensation are accurate, complete, and current at the time of contracting. Any professional service contract under which a certificate is required must contain a provision that the original contract price and any additions thereto will be adjusted to exclude any significant sums by which the city determines the contract price was increased due to inaccurate, incomplete, or noncurrent wage rates and other factual unit costs. All such contract adjustments must be made within one year following the end of the contract. (2) Should the public works director or designee, upon consultation with the chief procurement officer or designee, be unable to negotiate a satisfactory co with the firm considered to be the most qualified at a price determined to be fair, competitive, and reasonable, negotiations with that firm must be formally terminated. The public works director or designee, upon consultation with the chief procurement officer or designee, shall then undertake negotiations with the second most qualified firm. Failing accord with the second most qualified firm, the public works director or designee, upon consultation with the chief procurement officer or designee, must terminate negotiations and shall then undertake negotiations with the third most qualified firm. (3) Should the public works director or designee, upon consultation with the chief procurement officer or designee, be unable to negotiate a satisfactory contract with any of the selected firms, the chief procurement officer shall select additional firms in the order of competence and qualification and continue negotiations in accordance with this section until an agreement is reached. (d) Award. The public works director shall make a recommendation to the city commission indicating the guaranteed maximum product. Contracts shall be awarded in accordance with section 2-763.
(Code 2006, § 2-1089; Ord. No. 2003-23, § 2(466), 7-23-2003; Ord. No. 2005-17, § 2(2-466), 8-23-2005; Ord. No. 2005-20, § 2(2-466), 9-13-2005; Ord. No. 2008-27, § 2, 10-28-2008; Ord. No. CAO 2020-006, 2-14-2020)
Ask a question about Coral Gables law
Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.