For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-6 — Building official and code enforcement division; powers

City Code of the City of Coral Gables, Florida (Codified through Ord. No. 2026-40, enacted September 29, 2026. (Supp. No. 26, Update 1)) · Coral Gables City Code § 27-6

Corpus is an independent public-information project, not the official City of Coral Gables website. Stable reference: corpuslaw.us/code/c4fd128d-0b17-4bd5-ba6b-3fd345e3db2d

Sec. 27-6. - Building official and code enforcement division; powers.

(a) During a state of emergency, the building official has full jurisdiction over any construction site and can give any orders deemed appropriate which can be enforced by the city attorney or code enforcement. (b) Hurricane inspections. (1) During a state of emergency or once the five-day forecast cone from the National Hurricane Center predicts that the city will be impacted by a tropical storm or hurricane, whichever comes first, best efforts shall be used by owners and/or any occupants of real property to secure all furniture, display racks, materials and similar loose objects in exposed outdoor locations, including loose materials or equipment at construction sites that must be secured or otherwise appropriately braced to rigid construction or stored in buildings to the extent practicable, given the conditions. The city shall give oral or written orders to any person on the premises most logically responsible for maintenance and such orders shall be carried out before winds of tropical storm velocity begin. In the event of construction, the city shall also attempt to give notice to the contractor, if practicable. (2) Failure to comply with the requirements in (1) will subject the property owner and/or contractor to the following fines: a. A property owner who fails to remove or secure furniture, display racks, materials and similar loose objects in exposed outdoor locations, $1,000.00 per day, through the duration of the storm; b. A property owner who fails to remove or secure loose materials or equipment at a construction site, including items in dumpsters, $5,000.00 per day, through the duration of the storm; c. A contractor who fails to remove or secure loose materials or equipment at a construction site, including items in dumpsters, $5,000.00 per day, through the duration of the storm. (3) If damage is caused to property due to the owner or contractor's failure to remove or secure loose materials or equipment at a construction site, a fine of up to $15,000.00 may be issued. (4) City employees may enter onto private property to secure items, if necessary, to protect life, safety and welfare, and will not be held liable for any damage caused while doing so. This authority to enter private property does not impose a duty on the city or its employees to do so or to otherwise inspect private property or secure items. (c) Cranes are regulated as set forth in the city's crane ordinance, should one exist at the time of the state of emergency.

(Ord. No. 2017-42, § 2, 11-14-2017)

Ask a question about Coral Gables law

Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.