Sec. 62-121. - Mandatory pre-excavation procedures.

(a) Construction permit. (1) Single permit. A single construction permit shall be issued for each job. (2) One thousand feet of excavation allowed at one time; exception. No more than 1,000 feet of excavation or boring will be allowed at any one time; provided, however, that the public works director may approve construction in increments greater than 1,000 feet upon showing of good cause. (3) Additional construction prior to completion of outstanding work. No additional construction will be allowed until all outstanding work on prior sections of the job is completed and approved by the public works department. (b) Time limit for restoration; extensions. Restoration for a 1,000-foot section of work must be completed within 20 days of completion of installation or such longer period of time as approved in advance by the public works director after determining that such extension is warranted and reasonable. Any excavator in violation of any portion of this article shall not be issued any new permits until all violations have been cleared to the satisfaction of the public works department. (c) Permit requirements. (1) As-built drawings. Except in the case of maintenance work and jobs where total length of construction is less than 1,000 feet, no excavator shall apply for or receive a permit for a proposed excavation unless the excavator has first either requested copies of as-built drawings from any party whom the excavator knows may have underground facilities along the path of the proposed excavation, or if such party accepts planning or design location tickets, that the excavator submitted a planning or design location ticket request to the state one-call notification system. No excavator who has requested as-builts or submitted a planning or design location ticket shall be denied a permit irrespective of whether such as-builts or location ticket information was in fact received by the excavator. (2) Requests for planning and design locations. The city shall accept requests for planning and design locations of city underground facilities within the right-of-way. The fee for each request shall be as established in section 1-8. (3) State one-call notification system. Notification of the state one-call notification system for planning or design tickets shall not be mandatory. When requesting parties choose to request planning or design tickets through the system, the information specified in F.S. ch. 556 shall be provided. a. Request for planning or design tickets. Requesting parties of planning or design tickets shall only submit such request for bona fide excavation or demolition projects for which the requesting party has an active role. Requests for planning or design tickets shall not be made during the bidding or selection process for such projects. b. Information exchanged. Information exchanged via planning, design or construction tickets shall be considered valid for only the subject excavation or demolition project, and only for the duration specified in F.S. § 556.105(1)(c). c. Planning tickets. If the city determines that it has underground facilities within the limits of the proposed excavation or demolition project defined by the planning ticket, the city shall, upon request, provide copies of available information directly to the requesting party within 14 days of the receipt of the request and receipt of reimbursement of reproduction charges by the requesting party. Alternatively, the city may mark its utility locations on the site plan of the project defined by the planning ticket within 14 days of receipt of such site plan from the requesting party, or such longer period as provided by F.S. ch. 556. d. Design tickets. 1. If the city determines that it has underground facilities in proximity to or in conflict with the proposed excavation or demolition project defined by the design ticket, the city shall identify the horizontal route to within 24 inches from the other edge of either side of the underground facility by the use of stakes, paint, flags, or other suitable means within five days excluding days other than business days, after the time the notification is received or such longer period as provided by F.S. ch. 556. If the city is unable to respond within such time, the city shall communicate with the person making the request and negotiate a new schedule and time that is agreeable to, and should not unreasonably delay, the excavator. 2. As an alternative to providing field location information, the city, at its option, may provide written documentation of underground facilities within the project limits defined by the design ticket. (d) Marking site. No excavator shall engage in any excavation or demolition in a public easement or right-of-way without first marking the location of such proposed excavation with white paint, white flags, or white buoys, as appropriate; such markings shall conform to the recommended guidelines for uniform temporary markings of underground facilities as established by the American Public Works Association or the state, and shall occur before the person or entity provides the state one-call notification system, and any information as required by either subsection (c) of this section or F.S. ch. 556. (e) Renotification before excavation. Renotification is required for each 20-day period until excavation in the area is complete, or at any time when markings are not visible. In the event that the work has not commenced within 20 days of the initial location, a re-marking fee as established in section 1-8 shall be required for re-marking of city underground facilities. (f) Exploratory digging by excavators engaged in directional boring. (1) Any excavator engaged in directional boring, where markings cross or overlap the directional bore path or where markings show a conflict exists, shall engage in exploratory digging. Where the conflict is created by installation of a new facility parallel to an existing facility, the excavator shall be required to engage in exploratory digging only at those points where the existing facility deflects from the plane along which it is laid by more than 22 degrees in any direction, as determined by reference to existing markings or reference to as-built drawings, if such as-built drawings are provided to the excavator before excavation. (2) A separate permit shall be secured from the public works department for any exploratory digging, unless the exploratory work is done concurrently with the installation work. Restoration of all dig locations must comply with public works department standards. (g) Indemnification. Prior to any excavation or demolition in any public right-of-way or easement, an excavator shall either confirm that they have previously registered with the city or shall register with the city. The excavator shall, at its sole cost and expense, indemnify, hold harmless and defend the city, its officials, boards, members, agents and employees, against any and all claims, suits, causes of action, proceedings, judgments for damages or equitable relief, and costs and expenses incurred by the city arising out of work performed in the public right-of-way, regardless of whether the act or omission complained of is authorized, allowed or prohibited by this division. This provision includes, but is not limited to, the city's reasonable attorney's fees incurred in defending against any such claim, suit or proceedings. The city agrees to notify the excavator in writing, within a reasonable time, of the city receiving notice of any issue it determines may require indemnification. Nothing in this section shall prohibit the city from participating in the defense of any litigation by its own counsel and at its own cost, if, in the city's reasonable belief, there exists or may exist a conflict, potential conflict or appearance of a conflict. Nothing contained in this section shall be construed or interpreted as: (1) Denying to either party any remedy or defense available to such party under the laws of the state; (2) Consent by the city to be sued; (3) A waiver of sovereign immunity beyond the waiver provided in F.S. § 768.28. (h) Construction bonds. Except in the event of an emergency, prior to issuing a permit where the work under the permit will require restoration of public right-of-way, the city may require a construction bond to secure the restoration of the public right-of-way in the amount of the estimated cost of restoration or such lesser amount as the public works director may determine appropriate. Such bond shall not be required where the city determines it is not necessary to secure restoration considering by way of example and not limitation, the amount of restoration for the subject work or the ability of the excavator to cover any claims without the need for additional security. The city may allow an excavator to provide a blanket bond for such purposes, in which case a construction bond may only be required for any work of the excavator to the extent that the cost of the restoration exceeds the amount of the blanket bond. (i) Materials to be used for marking. Any markings made by an excavator or member operator pursuant to either this section or F.S. ch. 556 shall be made using chalk-based paint, except as permitted below. Any excavator or member operator who fails to comply with the requirements enumerated herein shall be required to remove all markings and fully restore any damage, by methods approved by the public works department. Markings shall be made with chalk-based paint on sidewalk, brick pavers and any other surface other than asphalt, earth or vegetation surfaces. Where markings are made on asphalt paving, earth or vegetation surfaces, acrylic paint can be used. In areas where chalk-based paint is required, off-set marks can be made with acrylic paint provided that such marks are made on asphalt paving, earth or vegetation surfaces. (j) Penalty. Violations of this section shall be punishable as provided in section 1-7.

(Code 2006, § 62-96; Ord. No. 3534, § 1(22-118), 10-9-2001)