§ 70-83 — Construction methods for placing or maintaining communications facilities in public rights-of-ways
City Code of the City of Coral Gables, Florida (Codified through Ord. No. 2026-40, enacted September 29, 2026. (Supp. No. 26, Update 1)) · Coral Gables City Code § 70-83
Corpus is an independent public-information project, not the official City of Coral Gables website. Stable reference: corpuslaw.us/code/752121aa-79d6-4e66-b73a-82567b718203
Sec. 70-83. - Construction methods for placing or maintaining communications facilities in public rights-of-ways.
(a) A registrant shall place and maintain its communications facility in public rights-of-way in a manner consistent with accepted industry practice and applicable codes and must comply with the 2017 edition of the Florida Department of Transportation Utility Accommodation Manual. For purpose of complying with the notice and approval requirements contained within the 2017 edition of the Florida Department of Transportation Utility Accommodation Manual, the registrant shall provide notice and seek approval from the city public works department. All safety practices required by applicable codes and accepted industry practices and standards shall be used during the placement or maintenance of communications facilities, including, but not limited to, chapter 33 of the Florida Building Code. Registrant shall use and exercise due caution, care and skill in performing work in the public rights-of-way, and shall take all reasonable steps to safeguard work site areas. (b) In connection with excavation in the public rights-of-way, a permit issued by the director of public works pursuant to this article shall satisfy the requirement of a permit for excavation in the public rights-of-way in chapter 62, article III, division 2, section 62-83(b) of the city Code. In the event of a conflict between requirements of chapter 62, and this article, this article shall control. Pursuant to chapter 62, article III, division 1, section 62-63 of the city Code, excavation shall not be allowed in the area encompassing the Miracle Mile and Giralda Avenue Streetscape Project consisting of Miracle Mile from Douglas Avenue to LeJeune Road and Giralda Avenue from Galiano Street to Ponce de Leon Boulevard, unless waived by the city commission. A registrant seeking to excavate in this area of the public rights-of-way to install, to perform maintenance, or to connect backhaul or other communications facilities shall be required to obtain a waiver from the city commission consistent with chapter 62, article III, division 1, section 62-63 of the city Code, prior to the time frame required for the city to grant or to deny an application filed pursuant to this article, or such application shall be denied, if such application requires excavation. (c) In addition, in connection with excavation in the public rights-of-way, a registrant shall, where applicable, comply with the Underground Facility Damage Prevention and Safety Act set forth in F.S. ch. 556, as it may be amended. In the event of any conflicts with existing utilities or utility service laterals, the proposed location of the communications facility will be adjusted, not the utility. (d) To the extent not inconsistent with applicable codes, underground cables, where required, shall have consistent alignment parallel with the edge of pavement, a 36-inch depth of cover for the paved portion of roadways, a 24-inch to 30-inch depth of cover in all areas except the paved portion of roadways, and shall have a two-foot horizontal clearance from underground utilities and their appurtenances. The lowest wire on any poles or micro wireless facility placed in any rights-of-way used by vehicular traffic shall be at a height from the ground in accordance with the National Electrical Safety Code and whenever telephone and electric power wires cross each other, wires shall cross and be maintained in accordance with the National Electrical Code, the National Electrical Safety Code and the "Safety Rules for the Installation and Maintenance of Electrical Supply and Communication Lines" established by the Department of Commerce, Bureau of Standards of the United States, as all may be amended. (e) Grounding rods and pull boxes. The grounding rod may not extend above the top of the public right-of-way or sidewalk and must be placed in a pull box, and the ground wire between the pole and ground rod must be inside an underground conduit. All pull boxes shall be vehicle load bearing, comply with applicable codes and applicable FDOT Standard specifications, comply with the city Public Works Department standards manual, and be listed on the FDOT Approved Products List. A concrete pad shall be installed around all pull boxes not located in the sidewalk. No new or replacement pull boxes shall be located in pedestrian ramps. (f) The city may require the use of trenchless technology (i.e., horizontal directional drilling, jack and bore, or micro trenching method) or may prohibit underground missile boring for the installation of facilities underground in the public rights-of-way. The registrant shall be solely liable for the displacement, damage, or destruction of any property, public rights-of-way, irrigation system, utility, or landscaping as a result of the placement or maintenance of its facility within the public rights-of-way. The city may issue such rules and regulations concerning the method for placement or maintenance of a communications facility in public rights-of-way as may be consistent with this article and other applicable codes and standards. The provisions of this subsection are not intended to prevent the use of any method of construction not specifically prescribed by this subsection, provided that any such method has been approved by the city. In the event a registrant will be performing excavation without a permit consistent with this article, the registrant shall provide the city Public Works Department advance notice of at least three business days prior to commencing construction to afford the city an opportunity to require a specific method of construction, as well as a plan for maintenance of traffic or pedestrians. Failure to comply with these requirements may result in a stop work order, the withholding of future permits, and enforcement remedies. (g) In an effort to minimize adverse impacts and disruption in the public rights-of-way and to other municipal improvements, the city may require a communications services provider to coordinate the placement or maintenance of its facilities with any work, construction, installation in or repairs of the subject public rights-of-way or other facilities therein, that is occurring or is scheduled to occur within a reasonable time from the date(s) requested in the communications services provider's permit application. The city may require a registrant to alter reasonably its placement or maintenance schedule as necessary to minimize disruptions and disturbance in the public rights-of-way. The city may provide a more definite time frame based on specific city construction or maintenance schedules. Within the public rights-of-way, every communications services provider shall make space available in its trench and/or conduit to other communications services providers consistent with the federal requirements of 47 U.S.C. §224. Every communications services provider shall utilize existing conduits, pathways and other facilities whenever possible, and shall not place or maintain any new, different, or additional poles, conduits, pathways or other facilities, whether in the public rights-of-way or on privately-owned property, until written approval is obtained from the city or other appropriate governmental authority, and, where applicable, from the private property owner. (h) Limits on excavation in restored rights-of-way. To avoid continual disruption and degradation to the public rights-of-way, and consistent with a registrant's guarantee of restoration of the public rights-of-way, a specific area of the public rights-of-way that has been subject to excavation and restored shall not be subject to re-excavation until at least four years following the completion of such restoration, to the extent not inconsistent with applicable law. The city may waive this requirement if a subsequent permittee applies for and the city issues a permit that requires the subsequent permittee to restore the public rights-of-way to the original condition and such subsequent permittee will warrant such restoration as provided herein. Registrants seeking to place communications facilities in the public rights-of-way through excavation are strongly encouraged to contact utilities, other registrants, and communications services providers to coordinate the placement of communications facilities in the public rights-of-way and to engage in joint trenching. (i) Trees. A registrant shall not prune, remove, or materially damage trees or tree roots in the public rights-of-way during placement or maintenance of communications facilities, including, but not limited to small wireless facilities, micro wireless facility, or utility poles in the public rights-of-way without a tree permit issued in accordance with chapter 82, of the city Code, as amended. Tree removal or pruning is not permitted within the public rights-of-way to increase signal strength or to provide a line-of-sight for wireless facilities. A registrant obtaining a permit to perform construction in the public rights-of-way shall be required to protect trees and tree roots as required by chapter 82 of the city Code, as amended, and as the city may require in a permit. The city may require that any landscaping or trees so removed shall be replaced or mitigated in accordance with the approved restoration plan and the city Code. (j) Restoration of public rights-of-way. A registrant shall, at its own expense, restore the public rights-of-way consistent with chapter 62, section 62-125 of the city Code, as amended, to at least its original condition before such work in public rights-of-way was initiated, subject to the city's satisfaction upon inspection. If the registrant fails to make such restoration within the completion date specified in the permit as may be required by the city, the city may perform such restoration using City employees, agents or contractors, and pursuant to F.S. § 337.402 and chapter 62, section 62-125 of the city Code, as they may be amended, the registrant shall reimburse the city for any such costs in an amount equal to the sum of the actual cost of any work or other activity undertaken by the city and 25 percent of such cost as compensation to the city for general overhead and administrative expenses associated with such work, and shall pay costs as directed by the city no later than 20 calendar days after receipt of an invoice. A registrant shall comply with section 62-125 of the city Code, as amended, with the exception that a registrant shall warrant restoration of the public rights-of-way for a period of 12 months after completion of such restoration or the time period set forth on a permit, or adopted pursuant to city public works standards. (k) A registrant shall immediately notify the city of any damage to utilities, including city utilities, city fiber, or other city facilities as a result of a registrant's construction in the public rights-of-way. The registrant shall repair such damage at its expense within the time frame required by the city given the nature of the damage and impact on city services. In its discretion, the city may repair or arrange for the repair of such damage and charge such expense to the registrant. (l) Any communications facilities heretofore or hereafter placed upon, under, over, or along any public rights-of-way that is found by the city to be unreasonably interfering in any way with the safe or continuous use or the maintenance, improvement, extension, or expansion of such public rights-of-way shall, upon 30 days' written notice to the registrant or its agent, be removed or relocated by such registrant at its own expense except as explicitly provided under F.S. § 337.403. The city may waive or extend the time within which a registrant shall remove or relocate a communications facility for good cause shown. (m) Removal or relocation at the direction of the city of a registrant's communications facility in public rights-of-way shall be governed by the provisions of F.S. §§ 337.403 and 337.404, as they may be amended. Subject to F.S. § 337.403 whenever an order of the city requires such removal or change in the location of any communications facility from the public rights-of-way, and the facility owner fails to remove or charge the same at its own expense to conform to the order within the time stated in the notice, the city may proceed to cause the communications facility to be removed. The expense thereby incurred except as provided in F.S. § 337.403(1)(a)—(c), shall be paid out of any money available therefor, and such expense shall be charged against the registrant of the communications facility and levied, collected and paid to the city. (n) Subject to F.S. § 337.403, whenever it shall be necessary for the city to remove or relocate any communications facility, the registrant of the communications facility shall be given notice of such removal or relocation and an order requiring the payment of the costs thereof, and shall be given reasonable time, which shall not be less than 20 nor more than 30 days in which to appear before the city commission to contest the reasonableness of the order. Should the registrant not appear, the determination of the cost to the registrant shall be final, in accordance with F.S. § 337.404. (o) A final order of the city shall constitute a lien on any property of the registrant and may be enforced by filing an authenticated copy of the order in the office of the clerk of the circuit court of the county wherein the registrant's property is located and/or by drawing upon the registrant's permanent performance bond or construction bond. (p) The city retains the right and privilege to cut or move any communications facilities located within the public rights-of-way of the city, as the city may determine to be necessary, appropriate, or useful in response to any public health or safety emergency. If circumstances permit, the city shall attempt to notify the registrant of the communications facility, if known, prior to cutting or removing a communications facility and shall notify the registrant of the communications facility, if known, after cutting or removing a facility. (q) The city shall have the right to make such inspections of facilities placed or maintained in public rights-of-way as it finds necessary to ensure compliance with this article. In the determination of the city, when practicable, such inspections shall be conducted by nonintrusive means. The city shall have access without charge to any manholes or handholes at any time, of a communications services provider in which the city has facilities, provided the city has given such provider reasonable prior notice so that such provider can have trained personnel present when the accesses such manholes. Notwithstanding the foregoing, the city, in the proper exercise of its municipal police powers and duties with respect to the public rights-of-way, shall have access to all manholes and handholes without charge of such provider. In the event the city determines that a violation exists with respect to registrant's placement or maintenance of facilities in the public rights-of-way that is not considered to be an emergency or danger to the public health, safety or welfare, the city will provide registrant with written notice setting forth the violation and requiring correction by a time specified in the notice, but in no event later than 30 days following notice. (r) Following the completion of construction to place a new or replace an existing communications facility in the public rights-of-way, the registrant shall promptly provide revised plans and as built plans upon completion of any installation or construction. The plans shall be in a digitized format, showing the two-dimensional location of the facilities, based on the city's geographical database or other format acceptable to the city. The registrant shall provide such plans at no cost to the city. The city shall maintain the confidentiality of such plans and any other information provided in accordance with F.S. § 202.195 as it may be amended. (s) The city reserves the right to place and maintain, and permit to be placed or maintained, sewer, gas, water, electric, storm drainage, communications, fire hydrants, smart city technology, public safety equipment, and other facilities, fiber, cables or conduit, and to do, and to permit to be done, any underground and overhead installation or improvement that may be deemed necessary or proper by the city in public rights-of-way occupied by the registrant. To the extent not inconsistent with applicable law, a registrant shall allow city facilities to be collocated within city's public rights-of-way through the use of a joint trench during registrant's construction project. Such joint trench projects shall be negotiated in good faith by separate agreement between registrant and city and may be subjected to other city rights-of-way requirements. The city further reserves without limitation the right to alter, change, or cause to be changed, the grading, installation, relocation, or width of the public rights-of-way within the limits of the city and within said limits as same may from time to time be altered. (t) A registrant shall, on the request of any person holding a permit issued by the city, temporarily raise or lower its communications facilities to permit the work authorized by the permit. The expense of such temporary raising or lowering of facilities shall be paid by the person requesting the same, and the registrant shall have the authority to require such payment in advance. The registrant shall be given not less than 30 days' advance written notice to arrange for such temporary relocation. If the city requests a temporary raising or lowering of a facility for a public purpose, the city shall not be charged for the temporary raising or lowering of the facility to the extent not inconsistent with applicable law. (u) This article does not authorize a person to collocate or attach wireless facilities, including any antenna, micro wireless facility, or small wireless facility, on a privately owned utility pole, a utility pole owned by an electric cooperative or a municipal electric utility, a privately owned wireless support structure, or other private property without the consent of the property owner. (v) Abandonment. Upon determination by a registrant or communications services provider that one or more of its communications facilities in the public rights-of-way is to be abandoned, the provider shall notify the city no later than 90 days from such determination, or no later than 30 days following such abandonment, whichever is sooner. The city may independently establish that a communications facility has been abandoned. In reaching such determination, the city may request documentation and/or affidavits from the communications services provider or registrant regarding the active use of the facility. If the provider or registrant fails to provide the requested documentation within 30 days, a rebuttable presumption shall exist that the provider or registrant has abandoned the communications facility. Any small wireless facility, micro wireless facility, utility pole for collocation of a small wireless facility, or other communications facility installed within the public rights-of-way that is abandoned constitutes a public nuisance and shall be removed by the registrant or communications services provider at its expense within 30 days of receipt of notice from the city. Failure to remove an abandoned facility within the 30 days' period shall be deemed to be the registrant's or communications provider's consent for the city to remove the facility at the registrant's or provider's expense or for the city to allow another person to remove the facility at the registrant's or provider's expense. The communications services provider or registrant shall be responsible for all damage to the public rights-of-way and any facilities or utilities damaged as a result of such removal, and shall restore the public rights-of-way as required in this subjection. (w) If there are two or more users of a single facility, then this provision shall not become effective until all users cease using the facility. Notwithstanding the foregoing, if the facility is attached to an existing structure that has an independent function such as a light pole, intersection signal, pedestrian signal, utility pole or the like, said abandonment of the facility requires removal of the facility only and does not require the removal of the existing structure.
(Ord. No. 2019-08, § 3, 1-22-2019; Ord. No. 2019-41, § 2, 12-10-2019)
Ask a question about Coral Gables law
Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.
