For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 78-103 — Sanitary sewer extensions

City Code of the City of Coral Gables, Florida (Codified through Ord. No. 2026-40, enacted September 29, 2026. (Supp. No. 26, Update 1)) · Coral Gables City Code § 78-103

Corpus is an independent public-information project, not the official City of Coral Gables website. Stable reference: corpuslaw.us/code/bad7003b-f02d-4f29-aab0-497c28422364

Sec. 78-103. - Sanitary sewer extensions.

(a) Construction. If a sewer connection is required that is outside an existing sewer district the sewer extension shall be constructed by the entity requesting the extension (original applicant) and at their expense. Design and construction shall be in accordance with city standards and all applicable codes. The city shall have the right to inspect the new sanitary sewer improvements at any time during construction. The city shall have final approval and acceptance of work. Upon completion of construction, and certification of acceptance by the health department, the city and any other appropriate entities, the original applicant shall convey to the city clear and clean title to the improvements, including any and all rights-of-way and easements. All expenses shall be the responsibility of the original applicant, including, but not limited to, design, construction, and recording of ownership transfer. (b) Refunds. The original applicant of an extension of sanitary sewer service dedicated to the city shall be entitled to repayment from subsequent connectors served by the lines installed by the original applicant. Repayments shall be paid for gravity sewers, wastewater lift/pumping stations, force mains and other facilities which service a subsequent connector's property. The original applicant shall be entitled to refunds for a period of ten years for gravity sewers, wastewater lift/pumping stations and for mains from the date commencing with the date of the date of transfer of ownership of the sewer facilities to the city and after a certificate from the department of environmental resources management (DERM), stating that the improvements have been approved for main clearance, and as further described below. All references in this section to the original applicant shall be deemed to include the lawful successors or assigns of the original applicant unless expressly provided otherwise herein. (1) Repayment shall be made from subsequent connector to the original applicant. Refunds shall be computed based on a fixed dollar amount per gallon per day (on an annual average day basis) of capacity required by the subsequent connector's property. The computation of a repayment shall be based upon the actual size, capacity and cost of the facilities installed. The city shall review the computation of all repayments and shall act as intermediary only in the event of a dispute over the amount of the refund arises. (2) Repayments must be paid to the original applicant by subsequent connector before physically connecting to the existing mains. The city shall not issue a permit for the connection until such time as good and sufficient proof that the reimbursement has been made is submitted. (3) Per annum simple interest will accrue on all construction connection charges from the date of the original applicant's bill of sale for the sewer facilities at the rate authorized from time to time by F.S. § 687.02. a. An original applicant shall not be repaid sums in excess of his or her original investment, less his or her use, in the sewer facilities. b. Such payment shall only be made during a ten-year period commencing with the date of transfer of ownership of the sewer facilities to the city and after a certificate from the department of environmental resources management (DERM) stating that the improvements have been approved for main clearance. It shall be the original applicant's responsibility to provide the city with a current mailing address during the ten-year period. (4) Should a subsequent connector connect to the existing main without a refund payment, the city, within 30 days of receipt of written notice of same, requires the subsequent connector to pay the full amount due or, at that time, the city may elect to terminate service to the subsequent connector. (5) The city shall maintain records to show which original applicant constructed and paid originally for the wastewater facility improvements. These records will be complete, to include engineering drawings, actual costs, date completed, materials used, etc. (6) It will be the original applicant's responsibility to inform the city of any changes in name, address, phone number or ownership status. (7) The original applicant and all subsequent connectors shall provide without cost to the city any right-of-way easements required to furnish the service requested by the original applicant. (8) When sewer mains are to be extended within the public right-of-way or when a public utility easement is used for such purposes, the original applicant must extend the main the entire length in accordance with sizes/capacities established by the city. Such length shall originate from the terminus of existing service to a point designated by the city for effective and efficient system operation. (9) The following is an example of the above-stated refund policy. In this example, to service his or her property, the original applicant requires an eight-inch gravity sewer line in this location. The city identifies a 16-inch gravity sewer line as necessary to accommodate the total average annual daily flow (AADF) of properties generating wastewater tributary to the sewer line in this area. The AADF capacity of a 16-inch gravity sewer in this location is designated F16 GPD. The original applicant is required to construct the 16-inch gravity sewer line in this location. Unless the city agrees to participate in the initial cost-sharing of the 16-inch gravity sewer line, the original applicant must initially bear the entire cost of the 16-inch gravity sewer line, which is designated C16. The fixed dollar amount of refund per gallon per day described in subsection (b)(1) of this section is represented in this example as C16/F16. When connector #1, the flow of whose parcel is designated FCA#1, wishes to connect to the 16-inch line, connector #1 must pay a refund to the city equal to FCA#1 x (C16/F16). Subsequent connectors/applicants must also pay refunds to the city computed in the same manner. The city shall, in turn, repay the appropriate amounts within the durations set forth in subsections (b)(1) and (3) of this section. (10) The city may require that an original applicant oversize facilities to service the subject property in order that the city may service future developers or to improve its service. (11) In order to offset the city's expense of maintaining records of repayment to be paid, subsequent connectors shall pay the city a repayment administration fee (RAF), which shall be in addition to the refund designated for payment to the original applicant. The RAF amount shall be five percent of the refund to the original applicant, but the RAF shall not be less than the amount established in section 1-8. The original applicant and those subsequent connectors not required to pay refunds designated for payment to an original applicant shall not pay a RAF. (12) Total amount of refunds to the original applicant shall not exceed the cost of the facilities less the cost of that portion of the facilities hydraulically required by the original applicant on annual average daily flow basis. In the event that the city has contributed to the over-sizing of the facilities, total amount of refunds to the original applicant shall be reduced by the amount contributed by the city. (13) The original applicant will be required to submit a cost estimate for all improvements prior to obtaining a city permit and approval to commence construction. If costs appear to be unusually excessive for market conditions at the time of application, the city may reject the project. (14) The city, or its agents, shall have the right to audit any records and books of the original applicant or any contractors or any sub-contractors to the extent such books and records related to the performance of this agreement or any subcontract to this agreement. Such records and books shall be maintained by the original applicant, contractor or any subcontractor for a period of three years from the date the transfer of ownership is recorded. a. Such records and books shall reflect control accounts and detail accounts prepared in accordance with generally accepted accounting principles. Such books and records shall be made available to the city, or its agents, within the Miami-Dade County area. b. If the city, or its agents' audit discloses a cumulative actual variance of three percent or more from amounts reported to the city the original applicant, contractor or subcontractor, such audit shall be at the original applicant's expense, in which case such audit costs and any overbilling shall be immediately paid to the city by the contractor. (15) Should unusual circumstances arise whereby a subsequent connector would be required to make excessive refunds designated for payment to one or more original applicants or insufficient refunds, the city may be requested to review and resolve such a case individually, upon written application to the city. (16) Refunds for gravity sewers, wastewater lift/pumping stations and force mains shall be due the original applicant from the date of transfer of ownership of the sewer facilities to the city is recorded and after the DERM "Final Construction Report" signed by a professional engineer who designed the system, stating that the system is ready for its intended use. (17) In those situations in which sanitary sewer improvements within the scope of this section have been made by a community development district (CDD) as authorized by F.S. ch. 190, any repayment which is due from the subsequent connector to the original applicant shall be payable to the CDD unless otherwise provided by the Miami-Dade County ordinance which created the CDD. Any such refund made to the CDD shall be administered by the city pursuant to an agreement (the "Refund Agreement") entered into between the subsequent connector, CDD and the city. The refund agreement shall be subject to the approval of the city manager and shall be approved as to form and legal sufficiency by the city attorney. It is intended that the refund agreement provides for the owners of the specially assessed property within the CDD to benefit from the authorized refund to the extent consistent with this section and F.S. ch. 190.

(Code 2006, § 78-107; Ord. No. 2007-29, 9-25-2007)

Ask a question about Coral Gables law

Corpus searches the Coral Gables sections it holds and shows the ones that match, with their citations. Free, no sign-in.