§ 21-71 — General specifications for excavations

Code of Ordinances of the City of Davie, Florida (Codified through Ordinance No. O2026-016, enacted September 3, 2026 (Supp. No. 76)) · Davie Code of Ordinances § 21-71

Corpus is an independent public-information project, not the official City of Davie website. Stable reference: corpuslaw.us/code/da49cdd1-9ba0-40a0-8933-eaba57a44918

Sec. 21-71. - General specifications for excavations.

(a) Removal of pavement, drives, sidewalks, curbs and gutters. Edges of permanent type pavement shall be pre-cut, straight, clean and square at least twelve (12) feet beyond any damaged area including well point locations. Such utility cuts in existing pavement shall be as indicated on drawings as may be included in the appendix which is on file in the town clerk's office. When the removal of sidewalks, curbs or gutters is necessary for construction, they shall be removed in full sections or a minimum of five (5) feet in length and all broken edges cut smooth by use of a suit-able power saw or other appropriate means. (b) Traffic and utility controls. Excavation for pipe laying operations shall be conducted in a manner to cause the least interruption to traffic. Where traffic must cross open trenches, suitable temporary bridges at street intersections, driveways, houses or places of business shall be provided. Fire hydrants, valve boxes, fire and police call boxes, and other utility controls shall be left unobstructed and accessible during the construction period. (c) Barricades, guards and safety provisions. To protect persons from injury and avoid property damage adequate barricades, traffic signs, guards, et cetera, as required, shall be placed and maintained during the progress of construction work and until it is safe for traffic to use the trenched roadway. Lights shall be provided at night. (d) Interruption and restoration of services. Adequate provision shall be made for the continuous operation of any utilities, drainage facilities or watercourses encountered during construction. All such services and all structures shall be satisfactorily restored upon completion of work. (e) Drainage. Adequate provision shall be made for the satisfactory disposal of water as a result of dewatering or pumping operations or encounter with water in any manner. The method of handling or disposal of water shall not be in such manner as to be injurious to public health or private property. (f) Bracing and shoring. Sheeting, bracing, et cetera, shall be used as may be required to support the sides of the excavation and to prevent any movements which can in any way alter the grade, injure the pipe, diminish the width of excavation or otherwise injure or delay the work or endanger personnel, adjacent pavements or other structure. Standard safety procedure shall be followed and adequate protection to all personnel shall be furnished. All sheeting or bracing which is not left in place shall be removed in such manner as not to endanger the work, personnel or other structures. No portion of sheeting or bracing which has been driven or forced into the earth below the center of the pipe or bottom of the trench shall be removed. Bracing or sheeting may be cut off as high as one (1) foot above the top. of the pipe. (g) Restoring surfaces. The top surfaces of the backfill shall be restored to the original or planned conditions. Trenches shall be carefully examined upon the completion of backfilling and surface irregularities that are dangerous or obstructive to traffic are to be removed. Paved sections shall conform in grade with adjacent areas and shall be of at least equal quality. Design mixes for flexible pavements shall be subject to approval by the public works department. All damaged or undermined areas of existing pavement, not previously removed, shall be removed and restored to original condition or in the specified manner. (h) Driving pipe under existing pavements. When pipes are driven through the earth under pavements, jetting or use of air or water, to be forced into direct contact with the earth, shall be prohibited. Pipe driving shall leave no voids in the underlying earth. This requirement does not prohibit the use of air hammers for driving. (i) Backfilling and compaction. Backfill incapable of being compacted shall not be used in trenches. Materials and methods of backfill shall be of such type and manner to assure and guarantee adequate foundation and support of existing or planned pavements. Muck, peat or other yielding material, incapable of being compacted, shall not be used for backfill. Natural sand, as excavated, may be used under pavement location if it is compacted to a bearing valve sufficient to permanently support the pavement; otherwise, it shall be blended and mixed with a sufficient amount of rock, or replaced entirely by a more suitable material, adequate to permanently support the pavement and traffic without future settlement. Rock material, without sufficient fine material to fill the void after compaction, shall not be used as backfill. Approved type mechanical or manual compaction methods shall be used for consolidation of backfill under existing or proposed pavements. Materials and methods of backfill for trenches located in swale areas need only to be of sufficient density to prevent future settlement of surface and to retain the proper cross-section of the swale. It is desirable for backfill in swales to allow percolation of water.

(Code 1964, § 15-8)