For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-84 — Wastewater discharge permit application

Code of Ordinances of the City of Davie, Florida (Codified through Ordinance No. O2026-016, enacted September 3, 2026 (Supp. No. 76)) · Davie Code of Ordinances § 25-84

Corpus is an independent public-information project, not the official City of Davie website. Stable reference: corpuslaw.us/code/bcdf1638-5cbd-4466-9999-51882e225527

Sec. 25-84. - Wastewater discharge permit application.

(a) Wastewater analysis. When requested by the control authority, a user must submit information on the nature and characteristics of its wastewater within sixty (60) days of the request. The control authority is authorized to prepare a form for this purpose and may periodically require users to update this information. (b) Individual wastewater discharge permit requirement. (1) No SIU shall discharge wastewater into the WWF without first obtaining an individual wastewater discharge permit from the control authority, except that a significant industrial user that has filed a timely application pursuant to subsection (c) may continue to discharge for the time period specified therein. (2) The control authority may require other users to obtain individual wastewater discharge permits as necessary to carry out the purposes of this article. (3) Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and subjects the individual wastewater discharge permittee to the sanctions set out in section 25-90 through 25-92. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (c) Individual wastewater discharge permitting; existing connections. Any user required to obtain an individual wastewater discharge permit who was discharging wastewater into the WWF prior to the effective date of the ordinance approving the inclusion of this article and who wishes to continue such discharges in the future, shall, within ninety (90) days after said date, apply to the control authority for an individual wastewater discharge permit in accordance with subsection 25-84(e), and shall not cause or allow discharges to the WWF to continue after one hundred eighty (180) days of the effective date of the ordinance approving the inclusion of this article except in accordance with an individual wastewater discharge permit issued by the control authority. (d) Individual wastewater discharge permitting; new connections. Any user required to obtain an individual wastewater discharge permit who proposes to begin or recommence discharging into the WWF must obtain such permit prior to the beginning or recommencing of such discharge. An application for this individual wastewater discharge permit, in accordance with subsection 25-84(e), must be filed at least thirty (30) days prior to the date upon which any discharge will begin or recommence. (e) Individual wastewater discharge permit application contents. (1) All users required to obtain an individual wastewater discharge permit must submit a permit application. The control authority may require all users to submit all or some of the following information as part of a permit application: a. Identifying information. 1. The name and address of the facility, including the name of the operator and owner. 2. Contact information, description of activities, facilities, and plant production processes on the premises. b. Environmental permits. A list of any environmental control permits held by or for the facility. c. Description of operations. 1. A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the WWF from the regulated processes. 2. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharge to the WWF. 3. Number and type of employees, hours of operation, and proposed or actual hours of operation; 4. Type and amount of raw materials processed (average and maximum per day); 5. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; d. Time and duration of discharges; and e. The location for monitoring all wastes covered by the permit. f. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the WWF from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in subsection 25-82(b)(3); (CFR 403.6(e), 62-625.410 (6)). g. Measurement of pollutants. 1. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. 2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the control authority, of regulated pollutants in the discharge from each regulated process. 3. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. 4. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection 25-86(j). Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard. 5. Sampling must be performed in accordance with procedures set out in subsection 25-86(k). h. Any other information as may be deemed necessary by the control authority to evaluate the wastewater discharge permit application. i. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (f) General permits. The town does not issue general wastewater permits. All permits issued by the town will be individual wastewater discharge permits. (g) Application signatories and certification. (1) All individual wastewater discharge permit applications and user reports must be signed by an authorized representative of the user and contain the following certification statement: (also found in subsection 25-86(n)(1)). "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (2) If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the control authority prior to or together with any reports to be signed by an authorized representative. (h) Individual wastewater discharge permit decisions. The control authority will evaluate the data furnished by the user and may require additional information. Within ninety (90) days of receipt of a complete wastewater discharge permit application, the control authority will determine whether or not to issue a wastewater discharge permit. The control authority may deny any application for a wastewater discharge permit.

(Ord. No. 2012-26, § 1(Exh. A, § 25-53), 12-5-12)

Ask a question about Davie law

Corpus searches the Davie sections it holds and shows the ones that match, with their citations. Free, no sign-in.