Sec. 30-89. - Design-build contracts.

(a) Purpose. This section will apply whenever the city elects to use design-build services for a construction project, and is intended to assure compliance with the CCNA. (b) Development of design criteria. A design criteria professional who is a city employee or a consultant selected and engaged in accordance with F.S. § 287.055(4), (5), will prepare a design criteria package specifying performance criteria for the project. The performance criteria will include but not be limited to size, net interior space provisions, location, material quality standards, cost, construction schedule, site development requirements, landscaping, grading, utility provisions for water, power, telephone, storm water disposal, and parking provisions. (c) Firm selection procedure. After preparation of the design criteria package, a design-build firm will be selected using a qualifications-based procedure in compliance with F.S. § 287.055(3)—(5), or a competitive proposal process. If a competitive proposal process is used, it will comply with sections 30-83 through 30-85 of this purchasing code, except as follows: (1) The request for proposals may provide for a single-step or a two-step proposal and evaluation process. In a single-step process, proposals will be ranked based on qualifications and weighted criteria including price, technical, and design aspects. In a two-step process, the first submittal will address only firm qualifications. Qualified firms will then have an opportunity to submit price, technical, and design information. After receipt of the additional submittal, proposals will be evaluated and ranked in accordance with the weighted criteria. (2) The city manager will negotiate with at least three of the highest ranked firms submitting proposals, or where fewer than three firms have submitted proposals, with all firms that submitted proposals. (d) Design criteria professional's assistance. The design criteria professional will assist the city in evaluating proposals, negotiating with firms, and administering the contract. This assistance includes review of detailed working drawings submitted by the selected firm and evaluation of the selected firm's compliance with the design criteria package. (e) Waiver. The city commission may waive some or all of the requirements of this section where a good faith estimate of the construction cost is less than the category five threshold set forth in F.S. § 287.017, or where the city commission determines that a valid public emergency exists.

(Ord. No. 12-121, § 1, 4-18-2012)