§ 86-401 — Activities requiring permit; application requirements
Code of Ordinances of the City of Daytona Beach, Florida (Codified through Ordinance No. 2026-59, enacted February 18, 2026. (Supp. No. 78)) · Daytona Beach Code of Ordinances § 86-401
Corpus is an independent public-information project, not the official City of Daytona Beach website. Stable reference: corpuslaw.us/code/265bbef6-96d2-42d5-89b1-5154da8ac210
Sec. 86-401. - Activities requiring permit; application requirements.
(a) Permit required. A person shall not commence to place or maintain a division 2 communications facility in the public right-of-way until a division 2 communications facility permit has been issued by the city. In applying for a division 2 communications facility permit, the applicant shall be deemed to acknowledge that as a condition of granting the permit, the city may impose reasonable conditions governing the placement or maintenance of a division 2 communications facility in the public right-of-way as set forth in F.S. § 337.401, as amended. Such permits shall apply only to the areas of the public right-of-way specifically identified in the permits. (b) Permit not required. A person shall be allowed to perform routine maintenance or emergency maintenance within the public right-of-way without first obtaining a division 2 communications facility permit if such proposed routine maintenance or emergency maintenance does not involve excavation, or the closure of a sidewalk or vehicle lane. In the case of routine maintenance, a person shall provide at least three days' advance written notice to the city identifying the areas where such maintenance shall occur, scope of maintenance, date(s) and duration of work to be performed. In the case of emergency maintenance, a registrant shall provide notice to the city of the emergency maintenance as promptly as is practical, and in any event less than 15 days after completing such emergency maintenance. As used in this section, the term "emergency maintenance" means the repair or replacement of a facility as a result of a condition that affects the health, safety and welfare of the public, which includes an unplanned out-of-service condition of a pre-existing service. (c) Permit application. Application for a division 2 communications facility permit shall be made on forms provided or approved by the city. As part of the application, the registrant shall provide the following: (1) Engineering plan. An engineering plan that includes all of the following information: a. The type of proposed division 2 communications facility, location of the proposed facility, including the dimensions, footprint, height, and concealment features and other stealth design features of the proposed facility. b. Distances between the proposed division 2 communications facility and nearby pavement, sidewalks, driveways, ramps, trees, underground utilities and other at-grade and below-grade structures and utilities located within the public right-of-way. c. The global positioning system (GPS) coordinates of the proposed division 2 communications facility. The GPS coordinates shall be based on the reading from a handheld mobile GPS unit set to Datum NAD 83 or WGS84. GPS coordinates based on Google Earth or similar application may be used where areas of shading occur due to overhead canopy. GPS coordinates shall be provided with a precision of six decimal points. d. Sufficient specificity demonstrating the division 2 communications facility's compliance with the Florida Building Code, the FDOT's Manual of Minimum Standards and the utility Accommodation Guide, National Electrical Safety 16 Code and North American Reliability Corporation standards, as amended and as applicable. e. Trees to be removed upon the placement or maintenance of the proposed division 2 communications facility. f. Attestation that the proposed division 2 communications facility is located within the public right-of-way, or if the city engineer reasonably disagrees, then the applicant must submit a survey. (2) Description of installation or construction. The applicant shall provide a description of the manner in which the division 2 communications facility shall be installed and/or modified (i.e., anticipated construction methods or techniques). (3) Temporary sidewalk closure plan. The applicant shall provide a temporary sidewalk closure plan, if appropriate, to accommodate placement or maintenance of the division 2 communications facility. (4) Temporary maintenance of traffic (MOT) plan. The applicant shall provide a temporary traffic lane closure and maintenance of traffic (MOT) plan, if appropriate, to accommodate placement or maintenance of the facility. (5) Restoration plan and cost of restoration of the public right-of-way. A restoration plan and a good faith estimate of the cost of restoration of the public right-of-way to the condition prior to commencing work in the public right-of-way. Such good faith estimate shall be accepted by the city unless the city engineer determines such estimated costs are not representative of the actual costs of the restoration of the public right-of-way. Estimates of the cost to restore the public right-of-way shall include all costs necessary to restore the public right-of-way to the condition at the time immediately before the work. Such good faith estimate may include, but shall not be limited to, costs to restore the paving, curbs/gutters, sidewalks, multi-purpose trails, and landscaping. All planted or naturally occurring shrubbery or vegetation, including sod, damaged or destroyed during work in the public right-of-way shall be replaced. Tree removal shown on the permit shall not be considered damage or impairment to be restored to the original condition provided the person complies with the approved mitigation plan, if any. (6) Timetable for construction or installation and intended areas of service. The timetable for placement or maintenance of the proposed division 2 communications facility or each phase of the placement or maintenance thereof. (7) Registrant agrees to indemnification. A statement shall be included within the permit application that by execution of the application and by applying for the permit, the registrant agrees to be bound to the city with respect to the indemnification provisions set forth in section 86-333, as though such indemnification provisions are set forth verbatim in the permit application. (8) Airport airspace protection. The applicant shall comply with F.S. ch. 333 and all federal regulations pertaining to airport airspace protections. (9) Attestation. For a utility pole that is intended to support small wireless facilities, the applicant shall provide an attestation that a small wireless communications and shall be used by a wireless service provider to provide service within nine months after the date the application is approved. (10) Information regarding height limitations. For a proposed utility pole, the applicant shall provide information regarding the height of other utility poles located in the same public right-of-way, measured from grade in place within 500 feet of the location of the proposed utility pole. If there are no other utility poles within 500 feet of the location of the proposed utility pole, the applicant shall certify same. (11) Additional information as reasonably required for review of permit application. Such additional information as the city engineer finds reasonably necessary to demonstrate the applicant's compliance with applicable codes, and federal and state laws and regulation with respect to the placement or maintenance of the division 2 communications facility that is the subject of the permit application. (d) Application review time frames. An application for a permit for a division 2 communications facility in the public right-of-way shall be reviewed by the city as follows: (1) Notice of application deficiency. Within 30 days after the date of filing an application for an at-grade facility, below-grade facility, wireline facility, or utility pole not intended to support a small wireless facility, the city engineer shall determine whether the application is complete. If an application is deemed incomplete, the city engineer shall notify the applicant by electronic mail and specifically identify the missing information. (2) Application review period. Within 60 days after the date of filing an application for a division 2 communications facility, the city engineer shall approve or deny the application. (3) Notice of denial; resubmission. Should the application be denied, the city engineer shall notify the applicant by electronic mail and specify in writing the basis for denial, including the specific code provisions on which the denial is based. The applicant may cure the deficiencies identified by the city engineer and resubmit the application within 30 days after the notice of denial is sent. The city engineer shall approve or deny the revised application within 30 days after the date of filing the application. (4) Repurposed structures and utility poles intended to support small wireless facilities. An application for a repurposed structure or utility pole intended to support a small wireless facility shall be reviewed by the city pursuant to the application review timeframes set forth in section 86-502. (e) Additional requirements for certain repurposed structures and utility poles. An application for a division 2 communications facility permit for the purpose of placing or maintaining a repurposed structure or a utility pole intended to support a small wireless facility, shall be submitted prior to or contemporaneously with an application for a permit required under division 3 for such small wireless facility.
(Ord. No. 18-17, § 2, 1-3-2018)
Ask a question about Daytona Beach law
Corpus searches the Daytona Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
