§ 86-502 — Permit requirements; application; review timeframe

Code of Ordinances of the City of Daytona Beach, Florida (Codified through Ordinance No. 2026-59, enacted February 18, 2026. (Supp. No. 78)) · Daytona Beach Code of Ordinances § 86-502

Corpus is an independent public-information project, not the official City of Daytona Beach website. Stable reference: corpuslaw.us/code/7c1ae4ad-f987-4721-a46c-74a2224d9930

Sec. 86-502. - Permit requirements; application; review timeframe.

(a) Permit required. A registrant shall not commence to place or maintain a wireless facility in the public right-of-way until all applicable permits required under this article have been issued by the city, except for limited work as provided in subsection (b), unless otherwise authorized by applicable codes, or state or federal laws or regulations. A registrant may submit a consolidated permit application and receive a single permit for the collocation of up to 30 small wireless facilities. The registrant acknowledges that as a condition of granting a division 3 communications facility permit, the city may impose reasonable conditions governing the placement or maintenance of a wireless facility in the public right-of-way as set forth in F.S. § 337.401, as amended. Permits shall apply only to the areas of the public right-of-way specifically identified in the permit. (b) Permit not required. A registrant shall be allowed to perform limited work, as defined below, within the public right-of-way without first obtaining a permit if such proposed limited work does not involve excavation, or the closure of a sidewalk or vehicle lane. (1) As used in this section, the term "limited work" shall mean any of the following: a. Routine or emergency maintenance. b. Replacement of an existing wireless facility with a wireless facility that is substantially similar or of the same or smaller size. c. Installation, placement, maintenance, or replacement of a micro wireless facility that is suspended on cable strung between existing structures in compliance with applicable codes by or for a communications services provider authorized to occupy the public right-of-way and who is remitting taxes under F.S. ch. 202, as amended. (2) Prior to performing any limited work, with the exception of emergency maintenance, a registrant shall provide at least three days' advance written notice to the city identifying the areas where such maintenance shall occur, scope of maintenance, date(s) and duration of work to be performed. In the case of emergency maintenance, a registrant shall provide prompt notice to the city of the emergency maintenance and, within 15 days of completing the emergency maintenance, apply for a permit if such activity required a permit under this article. As used in this section, the term emergency maintenance means the repair or replacement of a wireless facility or as a result of a condition that affects the health, safety and welfare of the public, which includes an unplanned out-of-service condition of a pre-existing service. (3) The city engineer may cause an immediate stop work order where any limited work poses a serious threat to the health, safety and welfare of the public until such time as such serious threat has been abated. (c) Pre-submittal conference. Prior to submitting an application for a division 3 communications facility permit, the applicant shall schedule a pre-submittal conference with the city. During the pre-submittal conference, at a minimum, the proposed facility, proposed location, potential alternative locations and coordination of work within the public right-of-way shall be discussed. The city, at its sole discretion, can waive the pre-submittal conference requirement. (d) Permit application. An applicant for a division 3 communications facility permit to place or maintain small wireless facilities in the public right-of-way shall be submitted on forms provided by or approved by the city. As part of any application, including a consolidated permit application, the registrant shall provide the following information: (1) Engineering plan. An engineering plan, signed and sealed by a state licensed professional engineer, which includes all of the following information: a. The type of proposed wireless facility including the dimensions, volume, height, and stealth design features of the proposed small wireless facility, and location of the proposed small wireless facility, including whether the proposed small wireless facility is proposed within a location subject to restrictions pursuant to section 86-504(g). b. The distance of the proposed small wireless facility from the edge of pavement, sidewalks, driveways, and other structures used by the traveling public. c. The global positioning system (GPS) coordinates of the proposed small wireless facility. The GPS coordinates shall be based on the reading from a handheld mobile GPS unit set to Datum NAD 83 or WGS84. GPS coordinates based on Google Earth or similar application may be used where areas of shading occur due to overhead canopy. GPS coordinates shall be provided with a precision of six decimal points. d. Sufficient specificity demonstrating compliance with the Florida Building Code and other applicable codes, including but not limited to the National Electric Safety Code. e. A sketch showing pavement, sidewalks, driveways, ramps, trees, underground utilities, and other above-grade and below-grade structures and facilities located within a 50-foot radius of the public right-of-way. f. Trees and landscaping to be removed or impacted upon the placement or maintenance of the proposed small wireless facility. (2) Description of installation or construction. A description of the manner in which the small wireless facility shall be placed or maintained (i.e., anticipated construction methods or techniques). (3) Pole attachment agreement. For collocations on private utility poles, a copy of a valid pole attachment agreement for the collocation of the proposed wireless facility. In lieu of providing the complete pole attachment agreement between the owner of the private utility pole and the applicant, the applicant may provide the first page of such agreement and the signature page or a notarized letter of authorization from the owner of the private utility pole, providing adequate identifying information, acceptable to the city, and indicating the applicant is authorized to collocate on the identified private utility pole. (4) Stealth design. A description of stealth design to be used pursuant to section 86-504(b). (5) Temporary sidewalk closure plan. A temporary sidewalk closure plan, if appropriate, to accommodate placement or maintenance of the small wireless facility. (6) Temporary maintenance of traffic (MOT) plan. A temporary traffic lane closure and maintenance of traffic (MOT) plan, if appropriate, to accommodate placement or maintenance of the small wireless facility. (7) Restoration plan and estimated cost of restoration of the public right-of-way. If applicable, a restoration plan and a good-faith estimate of the cost of restoration of the public right-of-way. Such good faith estimate shall be accepted by the city unless the city determines such estimated costs are not representative of the actual costs of the restoration of the public right-of-way. Estimates of the cost to restore the public right-of-way shall include all costs necessary to restore the public right-of-way to its condition as it existed immediately before the permitted work. Such good faith estimate shall include, but shall not be limited to, costs to restore the paving, curbs/gutters, sidewalks, multi-purpose trails, and landscaping. All planted or naturally occurring shrubbery or vegetation, including sod, damaged or destroyed during work in the public right-of-way shall be replaced. Tree removal shown on the permit shall not be considered damage or impairment to be restored to the original conditions provided the registrant complies with the approved mitigation plan, if any. (8) Timetable and intended areas of service. The timetable for construction, installation, placement or maintenance of the proposed small wireless facility or each phase of the placement or maintenance thereof. (9) Consolidated permit applications. For consolidated permit applications, a single structural certification may be provided by a Florida licensed professional engineer, rather than a separate certification for each small wireless facility, so long as the single certification covers all small wireless facilities covered by the application. (10) Indemnification. A statement shall be included within the permit application that by execution of the application and by applying for the permit, the registrant agrees to be bound to the city with respect to the indemnification provisions set forth in section 86-333. (11) Airport airspace protection. To the extent applicable, information showing the applicant's compliance with F.S. ch. 333, and all federal regulations pertaining to airport airspace protections. (e) Application review time frames. An application for a division 3 communications facility permit for a small wireless facility in the right-of-way shall be reviewed in accordance with the following time frames. Where specifically noted below, these time frames shall also apply to applications for division 2 communications facility permits for utility poles intended to support small wireless facilities, as required by section 86-401(d). (1) Notice of application deficiency. Within 14 days after the date of filing an application, unless the time frame is mutually extended, to place or maintain a small wireless facility or utility pole intended to support a small wireless facility, the city engineer shall determine whether the application is complete. If an application is deemed incomplete, the city engineer shall notify the applicant by electronic mail and specifically identify the missing information. An application shall be deemed complete if the city engineer fails to notify the applicant otherwise within 14 days after the date of filing the application: (2) Request for alternative location. Within 14 days after the date of filing the application for collocation of a small wireless facility, the city engineer may request that the proposed location of the small wireless facility be moved to another location and be placed on another existing structure or by placing a new wireless support structure. The city and applicant may negotiate the alternative location, including objective design standards and reasonable spacing requirements for ground-mounted equipment for 30 days after the city submits the request. The applicant shall notify the city of its acceptance or rejection within this 30-day negotiating period. If the applicant accepts the alternative location, the application shall be deemed granted for the agreed-upon alternative location and all other locations in the application. If the requested alternative location is rejected by the applicant, the city engineer shall approve or deny the original application within 90 days after the date the application was filed. (3) Application review period. Within 60 days after the date of filing an application for the collocation of a small wireless facility or for the placement of a new utility pole intended to support a small wireless facility, the city engineer shall approve or deny the application. If the city engineer does not submit a request for an alternate location as provided in subsection (2), the city engineer and the applicant may mutually agree to extend the 60-day application review period. (4) Notice of denial; resubmission. Should the city deny an application for a permit to place, maintain, or collocate a small wireless facility, or to place or maintain a utility pole intended to support a small wireless facility, the city engineer shall notify the applicant by electronic mail on the day the application is denied and specify in writing the basis for denial, including the specific code provisions on which the denial is based. The applicant may cure the deficiencies identified by the city engineer and resubmit the application within 30 days after the notice of denial is sent. The city engineer shall approve or deny the revised application within 30 days after the date of filing the application. Any subsequent review shall be limited to the deficiencies cited in the notice of denial. A denial of a permit is appealable pursuant to section 86-331. (5) Consolidated permit applications. The city may separately address each proposed collocated small wireless facility for which incomplete information has been received or which are denied. (6) Deemed approved. Prior to commencing construction, a person with a deemed approved permit must satisfy all registration requirements of division 1 of this article.

(Ord. No. 18-17, § 2, 1-3-2018)