§ 25-257 — Construction standards
Code of Ordinances, City of Fort Lauderdale, Florida (Supp. No. 67: codified through Ordinance No. C-26-32, enacted July 2, 2026) · Fort Lauderdale Code of Ordinances § 25-257
Corpus is an independent public-information project, not the official City of Fort Lauderdale website. Stable reference: corpuslaw.us/code/458d5aac-785b-47b9-81a8-ba56d9c04f9f
Sec. 25-257. - Construction standards.
(a) Rights-of-way construction. Prior to commencing any construction in the city, a grantee must comply with the requirements of the Fort Lauderdale Rights-of-Way Administration Ordinance, codified in Articles III and IX of Chapter 25 of the Code, as amended, obtain all necessary permits and licenses required by federal, state and local laws, ordinances and rules, and pay all associated fees. Further, a grantee shall comply with all applicable laws, ordinances, rules, and standards relating to the construction, operation and maintenance of a cable system. (b) Compliance with laws. At a minimum, and without limitation, a grantee shall adhere to all applicable building, electrical and zoning codes. The construction, installation, and maintenance of the cable system shall be performed by grantee in a manner that is consistent with the Fort Lauderdale Rights-of-Way Administration Ordinance, codified in Articles III and IX of Chapter 25 of the Code, National Electrical Safety Code, National Electrical Code, laws, ordinances and construction standards adopted by the City, the State of Florida, the Occupational Safety and Health Administration, the FCC, and the Recommended Practices for Measurement on Cable Television Cable Systems of the National Cable Television Association to the extent applicable, as well as all other applicable laws, rules, regulations and ordinances, all as may be amended. All open connections on splitters, couplers and other devices shall be properly terminated. (c) Restoration. Cable drop lines, cable trunk lines, or any other type of outside wiring that comprise part of the grantee's cable system that are located underground, shall be placed in such locations in accordance with City Code, and the surrounding ground shall immediately be restored in accordance with the standards set forth in section 25-108 of the Code. For private properties, such restoration shall occur within seventy-two (72) hours after connection to the cable system. Except for the grantee's maintenance facilities, no cable drop line, cable trunk line, or any other type of outside wiring shall be permitted to lay upon the ground within the city for any period of time, except for the express purpose of being immediately connected to the cable system of the grantee. The requirements of this subsection shall apply to all installation, reinstallation, service or repair commenced by the grantee within the city during normal operating conditions. (d) Erection of poles prohibited. Grantee shall not erect, for any reason, any pole on or along any rights-of-way in an existing aerial utility system. Grantee may obtain the lease of pole space and facilities from the existing utility pole owners. Upon advance written approval of city, if additional poles in an existing aerial route are required, grantee may negotiate with the utility for the installation of the needed poles, provided that grantee may not install its facilities on any such utility facility if the utility has not obtained all required authorizations to locate within any rights-of-way. (e) Underground installation. (1) In those areas within the city where cable system facilities are currently placed underground, all cable system facilities shall remain or be located underground. In areas where either telephone or electric utility facilities are above ground at the time of installation, grantee may install its cable system facilities above ground, provided that when such above ground facilities are thereafter located underground, grantee shall likewise locate its cable system facilities underground at no cost whatsoever to the city. Nothing contained in this section shall require a grantee to construct, operate and maintain any ground-mounted appurtenances underground. Grantee shall be in compliance with the Florida Underground Facility Damage Prevention and Safety Act, Chapter 556, Florida Statutes, or may make separate provision for a program ensuring the timely and accurate location of its underground facilities. (2) Where aerial extension is allowed by regulation but underground installation is requested by benefitted subscribers, the cost of undergrounding that exceeds estimated aerial extension cost may be charged to benefitted subscribers. (f) Conduit. All new trunk and distribution plant which must be buried underground pursuant to section 25-257(e) that also must to cross under major intersections, as identified by the city engineer, shall be encased in conduit. (g) Least disruptive technology. All construction and maintenance of cable systems shall be accomplished in the manner resulting in the least amount of damage and disruption to the rights-of-way. Specifically, every grantee installing underground facilities for a cable system shall utilize trenchless technology, unless the city engineer approves an alternative method. (h) Aerial drop lines. For subscribers requesting connection requiring an aerial drop in excess of one hundred twenty-five (125) feet, unless the franchise agreement specifies otherwise, grantee shall extend cable service at a rate not to exceed grantee's actual direct incremental cost of installation from its main distribution system beyond one hundred twenty-five (125) feet only. (i) Clearing poles and cables. In order to protect its poles, cables, underground conduits, and related equipment, grantee shall have the right, with city approval and upon acquisition of a permit, to remove, trim, cut the trees in and along the public streets; but, in exercising such right, grantee shall not cut such trees to any greater extent than is reasonably necessary for the construction, erection, installation, maintenance and use of cable system equipment. Grantee shall not remove, trim or cut such trees from any public streets without first providing reasonable notice to the city of its intention to do so, such notice to be delivered not less than fifteen (15) days in advance to the city's landscape inspector or designee. The landscape inspector shall, within ten (10) days provide grantee with a written notice to proceed, a denial, or a response requiring grantee to modify its request in accordance with the response. All pruning and trimming of trees and palms shall be done in accordance with the National Pruning Standards for Utility Companies. The grantee shall compensate the city or any private owners of such trees for any damage whatsoever caused by such trimming. Any authority provided herein does not extend to private property and privately owned trees. (j) Moving facilities. Grantee, upon the request of the city, or any person holding a building permit issued by the city, or any permit issued by an appropriate state agency, shall temporarily move its wires, cables, poles or other cable system facilities to permit the moving of large objects, vehicles, buildings or other structures. The expense of such temporary moves shall be paid to grantee by the person requesting the same and grantee shall have the authority to require such payment in advance. Grantee shall be given not less than thirty (30) days advance notice to arrange for such temporary moves, unless emergency conditions warrant otherwise.
(Ord. No. C-00-32, § 1, 7-18-00; Ord. No. C-01-38, § 8, 10-16-01)
Ask a question about Fort Lauderdale law
Corpus searches the Fort Lauderdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
