Sec. 25-325. - Engineering permit fees.

(a) The fee amounts for Permits and services provided by the Engineering Division in the Development Services Department shall be based on the rates and fee calculation methodologies established herein. (b) Permit Fees Based on Percentage of Estimated Construction Value (1) The Permit fees in this subsection shall be based on the percentage of Estimated Construction Value as indicated in the fee schedule herein. Applicant shall submit the Estimated Construction Value with the Permit Application for review and acceptance by the Plans Reviewer. The estimates shall be based on commonly accepted cost estimating practices in the industry and may include additional documentation such as an executed contract for construction for the Permit work. Should there be a disagreement between the Plans Reviewer and the Applicant, the City Engineer shall have final authority in determining the Estimated Construction Value. (i) Exception: At no time shall the permit fee in this category be less than $120. (2) The Permit fees based on the Estimated Construction Value shall be paid prior to the second cycle of review comments or prior to issuance of permit, whichever occurs first. (3) Fee Schedule: Authority in determining the Estimated Construction Value. (i) Sidewalk and Curb - Installation, repair and restoration of concrete sidewalks, curbs, gutters, concrete flatwork, decorative streetscape improvements and similar construction: 2% of Estimated Construction Value. (ii) Paving Installation, repair and restoration of surfacing, base, subbase for any public transportation facility, restoration of pipe trench and similar construction: 2% of Estimated Construction Value. (iii) Stormwater Design and construction of stormwater management facilities and the installation, repair, maintenance of stormwater collection systems, including piping, manholes, junction structures and similar construction: 2% of Estimated Construction Value. (iv) Water Main System Extensions and Connections, fire hydrants, water services and similar construction: 3% of Estimated Construction Value. (v) Sanitary Sewer - Gravity and Force Main Extensions and Connections, manholes, pump stations, lift stations, force and similar construction, but not including installation of sanitary sewer service laterals: 3% of Estimated Construction Value. (c) Fixed Permit Fees. (1) The Permit fees in this subsection shall be based on the fixed fee amounts established herein. (i) Exception: At no time shall the review fee for a permit exceed fifty (50) percent of the cost of material and labor required to complete the job. Upon request by the Plans Reviewer, proof of the actual cost of material and labor shall be submitted to the City Engineer and approval obtained for this exception to be granted. (ii) The fixed Permit fees shall be paid prior to Permit Application Acceptance. (iii) The fixed fees shall include three cycles of reviews and/or inspections, as applicable. Should the review or inspection for a Permit exceed three cycles due to noncompliance with engineering standards, governing laws or permit conditions, final written comments itemizing same, along with any necessary corrective actions, shall be provided to the Applicant. At the discretion of the City Engineer a mandatory staff meeting may be scheduled with Applicant and/or Applicant's representatives as a prerequisite to any further reviews or inspections. The hourly rates for re-reviews, reinspections and staff meetings established in Section 25-325(e)(3) shall apply. (2) Fee Schedule: (i) Landscaping Small Project .....$186 (ii) Landscaping Large Project .....$625 (iii) Monitoring Well .....$122 (iv) Transit/Bus Shelter Permit .....$186 (v) Sidewalk Waiver Request .....$186 (vi) Seawall Elevation Waiver Request .....$186 (vii) Street Lighting .....$313 (viii) Application for water service - (Fire Hydrant, Fire Service, Domestic/Irrigation 4" and Larger) .....$286 (ix) Sanitary Sewer Laterals in accordance with Sections 28-51 through 28-59 .....$769 (x) FDEP and Broward County permits for water and sewer ..... Small Project .....$360 Large Project .....$726 (xi) Water and Sanitary Sewer Capacity Allocation Letter ..... Small Projects .....$1,018 (xii) Modifications to small projects that require capacity re-analyses .....$1,018 Large Projects .....$2,544 (xiii) Modifications to large projects that require capacity re-analyses .....$2,544 (xiv) Bond Processing - Construction Value $40,000 or less .....$111 (xv) Bond Processing - Construction Value more than $40,000 .....$392 (xvi) Easement Dedication .....$694 (xvii) Maintenance Declaration .....$721 (xviii) Change of Contractor .....$27 (xix) Permit Renewal or Extension .....$27 (xx) Expired Permit Renewal .....$27 (xxi) Lost Plans .....$106 (d) Permit Fees Based on Fixed Amount Plus Inspection Time ..... (1) The Permit fees in this section shall be based on the fixed fee amounts plus a variable Inspection fee, as established herein. The added Inspection fee shall be calculated by multiplying the number of Days by the Inspection Rate per Day, as set forth below. ..... (2) The fixed amount plus Inspection fee Permit fees shall be paid prior to Permit Application Acceptance. ..... (3) Inspection Rate Per Day .....$32 (4) Fee Schedule: ..... (i) Site Preparation and Erosion Control .....$175 plus Inspection Fee (ii) Dewatering .....$199 plus Inspection Fee (iii) Temporary Traffic Control/Maintenance of Traffic .....$223 plus Inspection Fee (iv) Crane Operation .....$1,018 plus Inspection Fee (v) Revocable License .....$4,452 plus Inspection Fee (vi) Revocable License Extension .....$1,060 plus Inspection Fee (e) Permits Fees Based on Hourly Review and Inspection Rates (1) The permit fees in this section shall be based on the actual review and inspection times, at the rates established herein. Review and inspection times shall be charged in 15-minute increments and rounded to the nearest 15-minute increment. (2) Fee Schedule: (i) Permit Revisions | $127 per hour (3) The fees for permit revisions shall be paid prior to any further reviews or prior to issuance of permit, whichever occurs first. (i) Re-review | $127 per hour (ii) Reinspection | $117 per hour (iii) Meetings | $122 per hour/staff member (4) Re-review fees shall be paid prior to any further reviews or prior to issuance of permit, whichever occurs first. Reinspection fees shall be paid within ten (10) business days after inspection or prior to final inspection, whichever occurs first. Meeting fees shall be paid within ten (10) business days of the meeting, prior to final inspection or prior to issuance of permit, as applicable. No further plan reviews or inspections will be conducted when fees are past due. Plan reviews and inspections will resume when all outstanding fees are paid. (5) Expedited Review - After Hours: (i) Minimum Fee/First Three Hours | $323 (ii) Each Additional Hour | $85 (6) Upon request by the Applicant an expedited review may be provided subject to the availability of resources at the time of the request. The minimum fee shall be paid prior to Permit Application Acceptance by the City and will cover up to three (3) hours of review. Any remaining balance shall be paid prior to issuance of the Permit. (7) Inspection After Hours: (i) Minimum Fee/First Three Hours | $286 (ii) Each Additional Hour | $74 (8) Upon request by the Applicant, After Hours Inspections may be provided for Permits and franchise utility construction subject to the availability of resources at the time of the request. The minimum fee shall cover up to three (3) hours of Inspection time and be paid prior to the inspection. Any remaining balance shall be paid within ten (10) business days after the inspection or prior to the final inspection, whichever occurs first. No further Plan Reviews or Inspections will be conducted when fees are past due. Plan Reviews and Inspections will resume when all outstanding fees are paid. (9) Miscellaneous Permits - Permit fees for construction or activities that are not defined by any of the permit categories in this article shall be based on actual review time. (i) Miscellaneous Permit Fee | $170/hour (10) $40 fee for the first 15-minute increment shall be paid at the time of building permit application and any remaining balance shall be paid prior to issuance of the Permit.

(Ord. No. C-20-29, § 2, 9-1-20; Ord. No. C-22-13, § 64, 4-19-22; Ord. No. C-23-32, § 2, 9-5-23)