§ 28-212 — Wastewater discharge permit application
Code of Ordinances, City of Fort Lauderdale, Florida (Supp. No. 67: codified through Ordinance No. C-26-32, enacted July 2, 2026) · Fort Lauderdale Code of Ordinances § 28-212
Corpus is an independent public-information project, not the official City of Fort Lauderdale website. Stable reference: corpuslaw.us/code/b593c3bc-91e7-4830-bfcf-259b3e5670c4
Sec. 28-212. - Wastewater discharge permit application.
(a) Wastewater survey. When requested by the director, a user must submit information on the nature and characteristics of its wastewater within thirty (30) days of the request. The director is authorized to prepare a form for this purpose and may periodically require users to update this information. Failure to complete this survey shall be reasonable grounds for terminating service to the industrial user and shall be considered a violation of this article. (b) Wastewater discharge permit requirement. (1) No significant industrial user shall discharge wastewater into the WWF without first obtaining a wastewater discharge permit from the director, except that a significant industrial user that has filed a timely application pursuant to section 28-212(c) of this article may continue to discharge for the time period specified therein. (2) The director may require other users to obtain wastewater discharge permits as necessary to carry out the purposes of this article. (3) Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and subjects the wastewater discharge permittee to the sanctions set out in Division 6 of this article. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (c) Wastewater discharge permitting: existing connections. Any user required to obtain a wastewater discharge permit who was discharging wastewater into the WWF prior to the effective date of this ordinance and who wishes to continue such discharges in the future, shall, within ninety (90) days after said date, apply to the director for an individual wastewater discharge permit in accordance with section 28-212(e) of this article and shall not cause or allow discharges to the WWF to continue after one hundred and eighty (180) days of the effective date of this article except in accordance with an individual wastewater permit issued by the director. (d) Wastewater discharge permitting: new connections. Any user required to obtain a wastewater discharge permit who proposes to begin or recommence discharging into the WWF must obtain such permit prior to the beginning or recommencing of such discharge. An application for this wastewater discharge permit, in accordance with section 28-212(e) of this article, must be filed at least one hundred eighty (180) days prior to the date upon which any discharge will begin or recommence. (e) Wastewater discharge permit application contents. All users required to obtain a wastewater discharge permit must submit a permit application. The director may require all users to submit as part of an application the following information: (1) Identifying information. The user shall submit the name and address of the facility, including the name or the operator and owners. (2) Permits. The user shall submit a list of any pollution control permits held by or for this facility. (3) Description of operations. a. The user shall submit a brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classification (SIC) codes of the operations carried out by such user. This description shall include a schematic process diagram which indicates points of discharge to the WWF from the regulated processes; b. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the WWF; c. Number and type of employees, hours of operation, and proposed or actual hours of operation; d. Type and amount of raw materials processed (average and maximum per day); and e. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. (4) Time and duration of discharges. (5) The location for monitoring all wastes covered by the permit. (6) Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow (in gpd), to the WWF from each of the following: a. Regulated process streams; and b. Other streams as necessary to allow for the use of the combined waste stream formula of Chapter 62-625.410, F.A.C. Verifiable estimates of these flows are permitted, where justified by cost or feasibility considerations. (7) Measurement of pollutants. a. The user shall identify the pretreatment standards applicable to each regulated process. b. In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the pretreatment standard or city) of regulated pollutants in the discharge from each regulated process. c. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations. d. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the director or the applicable standards to determine compliance with the standard; e. Sampling and analysis must be performed in accordance with procedure set out in sections 28-230 and 28-231 of this article. (8) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on section 28-223 of this article. (9) Any other information as may be deemed necessary by the director to evaluate the wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (f) Application signatories and certification. (1) All wastewater discharge permit applications must be signed by an authorized representative of the user, as defined in section 28-26, and contain the certification statement in section 28-232. (2) If the designation of an authorized representative of the user is no longer accurate because of a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the director prior to or together with any application signed by an authorized representative of the user. (3) A facility determined to be a nonsignificant categorical industrial user by the director pursuant to section 28-26 must annually submit the signed certification statement in section 28-232. (g) Wastewater discharge permit decisions. The director will evaluate the data furnished by the user and may require additional information. Within one hundred twenty (120) days of receipt of a complete wastewater discharge permit application, the director will determine whether or not to issue a wastewater discharge permit. The director may deny any application for a wastewater discharge permit.
(Ord. No. C-98-61, § 3, 10-20-98; Ord. No. C-08-26, § 3, 6-17-08; Ord. No. C-12-49, § 12, 12-18-12)
Ask a question about Fort Lauderdale law
Corpus searches the Fort Lauderdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
