For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 47-21.15 — Regulations for the preservation of trees and palms

Code of Ordinances, City of Fort Lauderdale, Florida (Supp. No. 67: codified through Ordinance No. C-26-32, enacted July 2, 2026) · Fort Lauderdale Unified Land Development Regulations § 47-21.15

Corpus is an independent public-information project, not the official City of Fort Lauderdale website. Stable reference: corpuslaw.us/code/7b4d0e30-1774-45d5-9230-31eba2a76d1c

Sec. 47-21.15. - Regulations for the preservation of trees and palms.

A. Tree and Palm Protection Requirements. 1. General. Property owners, tenants, contractor or agents thereof shall take every reasonable measure to prevent the destruction or damaging of trees and palms for which no Tree Permit has been issued on private or public property. Trees and palms destroyed or incurring irreparable damage must be replaced by trees and palms of equivalent value, as specified herein, prior to the issuance of the certificate of occupancy or certificate of use, unless removal of the trees and palms has been authorized pursuant to a Tree Permit. Tree and palm protection zones must be established for all trees and palms that remain in place on-site and for any trees and palms relocated within or to the site. When proposed development activities may damage the root systems or canopies of trees and palms to be retained or relocated on-site, alternatives to the proposed activities, or effective protective measures, shall be identified and used. 2. Landscape and Tree Document Packet. Landscape and tree documents shall be provided as required in 47-21.6. 3. Tree and Palm Protection Measures. The following tree and palm protection measures are required to be incorporated in all development plans submitted for permitting. a. Protection Barricades. i. Protection barricades are required to be placed around each existing and relocated tree or palm, cluster of trees or palms, and preservation areas. The placement is to include the critical root zone (CRZ) to the drip line or having a minimum radius of one (1) foot for every one (1) inch in trunk DBH, whichever is greater. ii. All protection barricades must be installed prior to the start of any construction or site development, including but not limited to tree or palm removal, demolition and land-clearing activities, and cannot be removed until development is completed, and the Department authorizes removal after a site inspection. iii. Protection barricades must: 1) Be a minimum height of four (4) feet above grade installed at a minimum eighteen (18) inches below grade; and 2) Be constructed of either a continuous sturdy chain link fence with minimum two (2) inch diameter metal posts installed in the ground at a maximum five (5) foot spacing, or four-by-four (4x4) inch wood posts installed in the ground at a maximum sixteen (16) linear foot spacing, with intermediate two-by-four (2x4) inch wood posts installed in the ground at a maximum eight (8) foot spacing with three (3) equally spaced two-by-four (2x4) inch wood rails; and 3) Be sturdy with vertical posts driven firmly into the ground so as to prevent any horizonal movement; and 4) Have a colored material enclosing the barricade structure according to ANSI Z535; and 5) Display signage on the protection barricade to indicate that the area within the protection barricade is a tree protection zone in which activities listed in subsection b are limited. A minimum of two (2) signs shall be posted and signs shall be between one hundred and ninety-six (196) and four hundred eighty (480) square inches. iv. An ISA Certified Arborist or Registered Landscape Architect can provide a report with recommendations for alternative barricade solutions to be reviewed by the Department. b. Activity within tree and palm protection zones enclosed by protection barricades are limited as follows: i. No placement or storage of oil, fill, equipment, building materials, building debris, or any other construction materials is allowed in the enclosure. ii. No disposal of any waste materials including but not limited to paint, oil, solvents, asphalt, concrete, mortar, or any other chemical materials is allowed in the enclosure. iii. The natural grade of the area that existed prior to its enclosure by the protection barricades is required to be maintained in its original, pre-enclosure state. iv. Grading activity within the tree and palm protection zone is limited to hand digging and hand grading activities. All areas surrounding and abutting the tree and palm protection zone are required to be graded in a manner that provides for the smooth transition of grade from the abutting area outside of the tree protection zone to the nature grade within the tree protection zone. v. Best effort will be made to place underground lines, including, but not limited to, irrigation, plumbing, electrical, infrastructure, or telecommunication lines, outside the areas enclosed by protective barriers. If such placement is not possible, techniques such as tunneling, hand digging, excavation with an air spade, or other options determined acceptable by the Department shall be used to limit soil disturbance and avoid root damage. vi. No vehicles or equipment are permitted within the tree and palm protection zones. c. The Department may require supplemental protection measures to ensure the protection of trees and palms including but not limited to retaining walls and drywells. Retaining walls and drywells are required in accordance with ANSI A300 standards and best management practices to protect any tree, palm, or both from impacts resulting from changes to the natural grade of the site as a result of site development and are anticipated to impact the health or condition of a tree palm, or both. d. The applicants will provide the Department with authorization to enter the property subject of the development plan for the purposes of ensuring compliance with required tree and palm protection measures. e. Any tree, palm, or both designated for preservation, which is damaged during construction shall be repaired at the direction of the Department by an ISA Certified Arborist to include: i. Corrective pruning of canopy or root damages or both to tree or palm; ii. Irrigation, fertilization, soil amendments, and other treatment to support recovery. 4. Fences, walkways, and walls shall be constructed to avoid disturbance to any tree and palm to remain. Post holes and trenches located within the CRZ shall be dug by hand and adjusted as necessary to avoid damage to major roots. 5. No attachments, signs, chains, ropes, or wires shall be attached to any trees or palms on any property in a manner that penetrates the surface of the trunk or inhibits growth at any time. 6. Any tree and palm which has been declared by resolution of the City Commission to be a City Commission Protected Tree shall not be removed or relocated, unless such action has been approved by resolution of the City Commission. When a protected tree and palm is on or adjacent to a site to be developed or redeveloped, the owner or agent, developer or contractor shall take all reasonable measures to prevent damage to the tree and palm and root system to the extent of the natural dripline. B. Root Cutting Requirements. The cutting of roots with a diameter of two (2) inches or larger is prohibited, unless there is no feasible alternative, as determined by the Department. Construction activities, such as trench lines and walkway construction, shall be redirected away from tree and palm critical root zones. Root cutting shall be done according to approved techniques as outlined herein: 1. Trees and palms shall be evaluated by the Department, in accordance with ANSI A300 and companion BMP publications to determine whether the root cutting will destabilize the tree and palm or cause unacceptable damage to the tree and palm. 2. Root cut within the CRZ shall be made at a distance from the trunk not less than five (5) times the DBH of the trunk. 3. Roots shall be cleanly severed with sharp hand saw or power root saws. Roots shall not be torn off with power equipment, and cut roots shall not be left with ripped, ragged or shredded ends. 4. When tunneling or otherwise avoiding roots is not possible, a trench shall be carefully excavated by hand or machine and, when a root with a diameter of two (2) inches or greater is encountered, a final clean cut shall be made with a saw. The cut shall be made flush with the side of the trench closest to the tree. The root pruning trench shall be backfilled with soil. 5. When adjacent to new curbing, uncurbed paved areas, or areas of grade changes, roots shall be cut no more than eighteen (18) inches towards the tree from the back of the curb, the edge of the pavement, or the point of intersection of old and new grades, respectively. After root pruning, no excavation for the installation of forms or for any other reason may be performed any closer than six (6) inches outside of the root pruning cut. The root pruning trench shall be backfilled with soil and root barriers installed as appropriate. C. Tree and Palm Relocation Requirements. 1. The issuance of a Tree Permit for tree and palm relocation is required for trees, palms, or both. 2. Any tree or palm shall be relocated on site unless it is demonstrated that relocation on site is not a viable alternative for the particular tree or palm. 3. Relocated trees or palms shall be transplanted to a location within the City. Tree and palm may be approved by the Department for relocation outside of the City limits, however, such relocation shall be considered a tree removal and all required equivalent replacements or equivalent value requirements shall apply. 4. Tree, palm, or both relocation activities shall not unnecessarily damage any other tree and/or palm to remain on the property. 5. Any tree, palm or both being relocated shall not be unnecessarily damaged during its removal, transport, or replanting. 6. Irrigation must be present and applied effectively for two (2) to four (4) weeks prior to root pruning, through the period of root pruning, and after root pruning and transplantation until the tree and palm has been completely reestablished at the new planting space. Irrigation shall be operated by automatic timer with water being applied directly to and just outside of the remaining intact root system. Watering frequency shall be such so as to ensure that free water is available to the root system at all times. Any temporary disruption in automatic operation shall be supplemented by hand watering. 7. Before transplanting, a relocated tree, palm or both shall be root pruned in accordance with ANSI A300 and companion BMP publications. 8. A tree or palm on public property shall be relocated to another public property upon demonstration that the property on which the trees and palms are located lacks available space for its relocation. If relocated to another public property, written authorization from the owner of the public property is required. 9. The tree, palm, or both when relocated, will be transplanted by the applicant following the ANSI A300 and Best Management Practices companion publications. This requirement includes all procedures, techniques, standards for minimum root ball size, and any other standards included in ANSI A300 Standards. 10. The relocated tree, palm, or both will be guaranteed by the permit holder for one (1) year from relocation installation date as verified by landscape inspector for trees of less than or equal to six (6) inches in DBH; two (2) years from the relocation installation date as verified by landscape inspector for trees greater than six (6) inches in DBH; one (1) year from the relocation date for palms. 11. A monetary assurance deposit may be required by the Department to ensure compliance with requirements. This monetary assurance deposit in favor of the City of Fort Lauderdale shall be computed based upon the equivalent value as defined in Section 47-21.2 and calculated in Section 47-21.15. G of the tree or palm in question. The monetary assurance deposit shall be held by the City one (1) year from relocation date for trees of less than or equal to six (6) inches in DBH; two (2) years from the relocation date for trees greater than six (6) inches in DBH; one (1) year from the relocation date for palms. The monetary assurance deposit shall be in addition to any bond required by any other governmental entity. 12. Release of monetary assurance deposit will occur upon successful completion of guaranteed date, and tree or palm has a sixty percent (60%) condition rating or better. If the tree or palm is determined to have a thirty-nine percent (39%) condition rating or less, and no maintenance efforts have been made to complete a successful relocation, and no replacements have been proposed, the monetary assurance deposit will be deposited into the Tree Canopy Trust Fund. 13. Replace, within sixty (60) days, a relocated tree or palm that dies within one (1) year of relocation installation date as previously verified by landscape inspector. The one (1) year maintenance period shall begin again whenever a tree or palm is replaced. The replacement trees or palms are to be determined from the equivalent value given for each at time of permitting or by the Department. D. Tree and Palm Pruning Requirements. 1. Tree pruning is to be performed in accordance with ANSI A300 and Best Management Practices companion publications. Tree abuse is prohibited. The Department may require that construction activities minimize negative impacts to tree and palm canopy. 2. Trees and palms shall be pruned in the following manner: a. All cuts shall always be made to the outside of the branch bark ridge and angled away from trunk. Cuts shall be made as close as possible to the trunk or parent limb, without cutting into the branch bark ridge, branch collar or leaving a protruding stub. Tree limb reduction cuts shall be the preferred option with tree limb removal cuts performed only as a last resort. b. Removal of dead wood, cross branches, branches with poor angles of attachment and thinning of suckers shall be accomplished simultaneously without any reduction in crown. c. Pruning of lateral branches that results in the removal of more than one-third (1/3) of all branches on one (1) side of a tree shall not be permissible. d. Lifting of lower branches or tree thinning shall be designed to distribute over half of the tree mass in the lower two-thirds (2/3) of the tree. e. No more than twenty-five percent (25%) of a tree's living canopy shall be removed within a one (1) year period. 3. Tree pruning shall comply with Broward County Code of Ordinances tree trimming regulations and ANSI A300 best practices. E. Tree Removal, Permitting, Licensing, Preservation and Mitigation Requirements for a Natural Forest Community: 1. A Broward County Resilient Environmental Department (BCRED) tree removal license must be obtained prior to the removal of any tree or trees from a site in areas designated as a Natural Forest Community. Damage to any tree or trees on the site in areas designated as a Natural Forest Community is prohibited. 2. Removal of trees in areas designated as a Natural Forest Community shall be pursuant to the Broward County preservation requirements to the extent determined to be practicable by BCRED. 3. Any proposed development activity which would negatively impact the Natural Forest Community must be mitigated through a resource management plan approved by BCRED. 4. In an area designated as a Natural Forest Community by Broward County where preservation is required, a conservation easement shall be granted by the applicant to Broward County. F. Tree Permit Requirements. 1. A development permit application for new development or redevelopment must be submitted prior to issuance of a Tree Permit for removal of all trees onsite. 2. A Tree Permit is required for demolition and land clearing activities unless site has been previously verified by the department to be devoid of any trees utilizing site inspection, aerial photographic records and other available historic data relative to the area. 3. The issuance of a Tree Permit for any tree and palm is required prior to the removal of: a. A dicot or conifer tree having a DBH of three (3) inches or more; and b. A monocot having eight (8) feet or more of clear trunk; and c. Desirable trees and palms; and d. City Commission protected trees and palms; and e. Specimen trees. 4. Application for a Tree Permit for removal shall be made to the Department. Upon receipt of an application for tree or palm removal, the Department shall determine the equivalent replacement or equivalent value of each tree and palm to be removed, and may request such calculations to be provided by applicant. 5. No permit nor replacements shall be required for removal of a plant species identified as prohibited and controlled pursuant to the Department of Agriculture and Consumer Services, Chapter 5B-57, Florida Administrative Code (FAC), as amended, and the Florida Invasive Species Council (FISC) Category I Invasive Plant Species List, as amended, and Araucaria heterophylla (Norfolk Island Pine). 6. No permit will be required for the removal of a dead tree or palm on any developed property. Any dead tree or palm on developed property shall result in the complete removal including the stump and roots. If a dead tree or palm fulfilled a requirement, a replacement tree or palm is required to be installed to meet that requirement. 7. The Department shall approve a Tree Permit for removal of a tree or palm upon reviewing the following findings: a. That the tree or palm removal is necessary to accommodate a proposed development after the proposed development has provided evidence that the tree or palm cannot remain, be relocated on site, or both despite every reasonable effort made to incorporate the tree or palm proposed to be removed into the development and to minimize the number of trees removed. b. That the tree or palm proposed to be removed is abused, diseased, injured, or otherwise of poor condition not greater than a forty percent (40%) condition rating. c. That the tree or palm proposed to be removed is obstructing safe vehicular cross visibility. d. That the proximity of the tree or palm proposed for removal to an existing structure endangers the structure or creates an ongoing safety issue for an existing development whereby risk cannot be otherwise mitigated and poses an imminent risk of failure as identified in a tree risk assessment report. The tree risk assessment report for a tree or palm shall be prepared by a Tree Risk Assessment Qualified (TRAQ) ISA Certified Arborist or a Registered Landscape Architect. The report shall be printed on the ISA Certified Arborist's business stationery and affixed with his or her signature or is signed and sealed by a Registered Landscape Architect. The ISA Certified Arborist's business stationery must contain the arborist's contact information and ISA Certification number. e. That the development plan designs around existing, large, desirable trees. A tree removal permit may be denied by the Department if it has been determined that large desirable existing tree(s) will be displaced by proposed site plan elements and or the placement of such site plan elements does not provide sufficient root system support for the tree(s), and such tree(s) are capable of being protected by a reasonable modification of said plan. f. That if a permit is sought to remove an existing, large, desirable tree because its root system is causing damage to the associated sidewalks, paved areas, or septic systems, or if falling tree debris is staining nearby surface area, then the tree removal permit may be denied by the department if alternatives such as sidewalk bridging, canopy reduction, or trimming have not been considered or attempted, and such action would address the problem while preserving the tree. An alternative or redesigned site plan shall then be submitted. 8. After the Department has issued a Tree Permit for tree or palm removal, the applicant for such permit shall fulfill one (1) or more of the following requirements: a. That the tree or palm will be replaced by trees or palms of equivalent replacement planted on the site from which the tree or palm was removed. Sufficient area must be reserved on the site to allow replacements to establish a mature canopy spread, based on usual growth characteristics of the species. A replacement planting plan may be required. In the event that less than the required amount of equivalent replacement trees or palms are planted to satisfy the above, the remaining quantity of the equivalent replacement trees or palms may be addressed by payment into the Tree Canopy Trust Fund as calculated by equivalent value described in Section 47-21.15.G. b. That the tree or palm will be replaced by the applicant by providing the equivalent value to the City's Tree Canopy Trust Fund. c. That a specimen tree having a diameter at breast height measurement (DBH) of eighteen (18) inches or greater for Large Trees, thirteen (13) inches or greater for Medium Trees, and eight (8) inches or greater for Small Trees, as listed in the City's Tree Classification List as maintained by the Department and having a condition rating of sixty percent (60%), or greater, as calculated using the CTLA Guide for Plant Appraisal, 10th edition, shall provide equivalent value deposited to the Tree Canopy Trust Fund at the time the Tree Permit for removal is issued. There shall be no size requirements for palms to be considered desirable palms. A written request to install replacement trees on site for a portion or all of the equivalent value shall be presented to the Department for review and approval prior to Tree Permit issuance. 9. Activities associated with authorized tree or palm removal shall not result in the cutting down, destroying, removing, relocating, or damaging of any other tree or palm on the site unless such action is authorized by a Tree Permit. 10. Any tree or palm removed without a tree permit having first been issued by the Department shall be replaced by equivalent replacement or equivalent value. The equivalent replacement(s) shall be made by planting onsite the largest tree(s) or palm(s) available. 11. In the event that insufficient trunk remains of the removed tree or palm so that equivalency cannot be determined thereby, size and equivalency shall be estimated based upon trees or palms of the same species existing within 500 feet of the location of the removed tree, considering, among other things, aerial photographic records and other available historic data relative to the area. 12. Failure of an applicant to replace a removed tree or palm within sixty (60) days after being notified in writing by the Department shall be a violation of this section. Removals necessitated by permitted construction may be replaced after the sixty (60) day limit, but prior to the issuance of a certificate of occupancy, certificate of completion, or final use approval. 13. Tree Permit is not required for the removal of trees or palms planted and grown in a state-certified plant nursery or botanical garden for sale to the general public for transplanting as landscape material. 14. A monetary assurance deposit may be required to ensure compliance with code requirements. This monetary assurance deposit, in favor of the City of Fort Lauderdale, shall be computed based upon the equivalent value of the trees or palms in question and shall be held by the City for a minimum of three hundred sixty-five (365) days past the replacement planting date. The monetary assurance deposit shall be in addition to any bond required by any other governmental entity. 15. In the event of storms, accidents, or other acts of nature of an emergency status by reason of which life, limb or property is in immediate jeopardy, or for trees or palms which have died due to lightning, disease, storm damage, or other natural causes, part or all of the terms and provisions of this section may be waived by the Department. 16. Mitigation for trees removed within the right-of-way shall be calculated and provided separately from onsite mitigation for the Landscape and Tree Document Packet submittal and plan review. Replacement within the right-of-way shall maximize caliper inches installed with trees that have a minimum twelve (12) foot height. G. Tree and Palm Mitigation Calculation Requirements. 1. The equivalent replacement for non-specimen trees is determined by multiplying the existing trunk diameter at breast height (DBH) in inches, by the tree condition rating, by the percentage assigned below according to the species classification (based on the Classification List on file with the Department) percentage as follows. The product of this calculation indicates the total caliper inches of trees to be provided as equivalent replacement. The minimum height of replacement tree shall be twelve (12) feet overall. a. Class A - 100% b. Class B - 80% c. Class C - 60% d. Class D - 40% e. Class E - 20% f. Class F - 0% 2. The equivalent replacement for a palm with a clear trunk greater than eight (8) feet shall be a palm with a minimum eight (8) foot clear trunk. Palms with less than eight (8) feet of clear trunk and Desirable Palms are exempt from the requirement of this subsection 47-21.15.G.2. 3. The equivalent replacement for Desirable Trees and Palms is determined an ISA Board Certified Master Arborist, ASCA Registered Consulting Arborist or Registered Landscape Architect by using a method outlined in the Council of Tree & Landscape Appraisers Guide for Plant Appraisal, 10 th edition. 4. The equivalent replacement for City Commission Protected Trees and Palms is determined an ISA Board Certified Master Arborist, ASCA Registered Consulting Arborist or Registered Landscape Architect by using a method outlined in the Council of Tree & Landscape Appraisers Guide for Plant Appraisal, 10 th edition. 5. The equivalent replacement for specimen trees is determined by subtracting the retail cost of the replacement tree or trees (wholesale cost multiplied by two and one half [wholesale x 2.5]) from the equivalent value of the specimen tree. The remainder of the equivalent value shall be provided by cash deposited to the Tree Canopy Trust Fund prior to Tree Permit issuance. The minimum height of replacement tree shall be twelve (12) feet overall. 6. The equivalent value for non-specimen trees is determined by multiplying the diameter at breast height (DBH) in inches, by the tree condition rating, by the retail cost of trees (wholesale cost multiplied by two and one half [wholesale cost x 2.5] to be not less than two hundred and fifty dollars [$250.00] per inch) expressed in dollars per inch, and by the percentage assigned below according to the species classification (based on the Classification List on file with the Department). The product of this calculation indicates the dollar amount to be deposited into the Tree Canopy Trust Fund. a. Class A - 100%. b. Class B - 80%. c. Class C - 60%. d. Class D - 40%. e. Class E - 20%. f. Class F - 0%. 7. The equivalent value of a palm, which is not protected under Desirable Palm status by the Department and has a minimum of eight (8) feet clear trunk, is determined by multiplying the clear trunk measurement of the palm to be removed by the retail cost per clear trunk foot (wholesale cost per clear trunk foot multiplied by two and one half [wholesale cost x 2.5] to be not less than twenty-five dollars [$25.00] per foot) expressed in dollars per clear trunk foot. The product of this calculation indicates the dollar amount to be deposited into the Tree Canopy Trust Fund. 8. The equivalent value of a Desirable Tree and Palm is determined by an ISA Board Certified Master Arborist, ASCA Registered Consulting Arborist or Registered Landscape Architect using a method outlined in the Council of Tree & Landscape Appraisers Guide for Plant Appraisal, 10 th edition. 9. The equivalent value for City Commission Protected Trees and Palms is determined by an ISA Board Certified Master Arborist, ASCA Registered Consulting Arborist or Registered Landscape Architect using a method outlined in the Council of Tree & Landscape Appraisers Guide for Plant Appraisal, 10 th edition. 10. The equivalent value for Specimen Tree is determined by an ISA Board Certified Master Arborist, ASCA Registered Consulting Arborist or Registered Landscape Architect using a method outlined in the Council of Tree & Landscape Appraisers Guide for Plant Appraisal, 10 th edition. 11. Money from the Tree Canopy Trust Fund shall be expended, utilized, and disbursed for: a. Enhancing tree canopy coverage within the City through the means below: i. Planting of trees or palms on public lands and rights-of-way; ii. Relocating trees or palms to public lands; iii. Distributing trees or palms to the publics; and iv. Replacement of hazardous trees on City projects or from within City property or rights of way as defined by Section 27-408(a)(3)(b) of the Broward County Code of Ordinances. b. Funding of ancillary costs associated with the planting of trees or palm on public lands shall not exceed twenty percent (20%) of any tree planting project for services and materials directly in support of tree or palm planting, which may include landscape design services, irrigation, soil amendments, or other materials necessary for the proper and successful installation and establishment of a tree planting project. c. Developing, publishing, and updating an Urban Forestry Master Plan to protect, preserve, and enhance the City's urban tree canopy and implementing the Master Plan recommendations. Cumulatively, the cost expenditures for this item shall not exceed fifteen percent (15%) of the Fund's balance in any given fiscal year. d. The cumulative expenditures from subsection b. and c. shall not exceed twenty percent (20%) of the total fund balance in any fiscal year. 12. The Urban Forestry Master Plan (UFMP) is a strategic and long-term investment in the City's urban tree canopy. Funding from the Tree Canopy Trust Fund shall be allocated to publish and regularly update the UFMP. H. Tree Services and Arborist Requirements. 1. All tree services working within the City of Fort Lauderdale shall comply with all Broward County Tree Trimmer regulations, as applicable, and ANSI A300 practices. 2. Vehicles used by a tree service/arborist operating within the City shall be clearly marked with the name of the tree service/arborist. ISA Certified arborists shall display the certified logo and registration number, if any. 3. A photocopy of the current business tax receipt shall be available for inspection at each job site. 4. Standards for cutting on or repair to tree and palm species shall be in accordance with the ANSI A300 standards as published. 5. Persons engaged in business as a tree service in the City shall adhere to the ANSI A300 standards on all tree species within the City of Fort Lauderdale. I. Tree Abuse. 1. Tree abuse of any species of trees and palms for any purpose is prohibited. Abused trees may not be counted toward fulfilling landscape requirements. Tree abuse shall include: a. All actions not in conformance with ANSI A300 and Z-133, 2017; b. Any action which effectively destroys a tree or palm, which permanently reduces the function of the tree, or causes unnatural decline; c. Unpermitted removal and relocation of a tree or palm; d. Damage inflicted upon any part of a tree within the dripline, including the root system, by machinery, storage of materials, soil compaction, excavation, vehicle accidents, chemical application, change to the natural grade, or other; e. Damage inflicted to or cutting upon a tree which permits infection or pest infestation; f. Damage caused by nailing or screwing to the trunk of any tree or palm to attach lights, signs, flags, ornaments, birdhouses, etc.; g. Damage caused by using inappropriate equipment, including but not solely limited to, inappropriate tool for cuts being made, inadequate tool for size cuts being made, dull cutting tool, and anvil-type pruners; h. Damage inflicted to trunk tissue caused by string trimmers; i. Unapproved cutting upon a tree which permanently alters the natural shape; j. Hatracking; k. Overlifting; l. Bark removal of more than one-third (1/3) of the DBH; m. Tearing and splitting of tree parts; n. Use of climbing spikes other than for total tree removal; o. Intentional neglect of tree nutrition; p. Inadequate irrigation necessary for establishment and continued growth; q. Damage caused from improper installation of and failure to remove guying and staking materials; r. Pruning of live palm fronds initiating at or above the horizontal plane. 2. Any owner of a parcel of land upon which tree abuse has occurred may be required to remove an abused tree or palm and replant an equivalent replacement upon such parcel, or at a different location selected by the Department, or, be required to make a payment into the Tree Canopy Trust Fund in the amount determined by the Department, within sixty (60) days after being notified by the Department. Additional corrective actions may also be required as determined by the Department which may include, but not be limited to, corrective structural pruning, installation and maintenance of tree protection barriers, corrective root pruning, or obtaining a written tree evaluation from an ISA certified arborist. J. Enforcement/Civil Remedies. 1. Enforcement and penalties for not obtaining a Tree Permit. a. Civil fine for violators. The following civil fines shall be imposed for a violation of any parts of this section for those violations incurred for not obtaining a Tree Permit: i. First offense committed within a twelve (12)-month period: $1,000.00 per tree plus a monetary payment made to the Tree Canopy Trust Fund for the equivalent value of the tree or palm; ii. Repeat offense within a twelve (12)-month period: $2,000.00 per tree plus a monetary payment made to the Tree Canopy Trust Fund for twice the equivalent value of the tree or palm; b. Enforcement procedures shall be governed by the City of Fort Lauderdale Code of Ordinances Chapter 11 Article III. 2. Reserved. K. Tree Preservation Credits. 1. Desirable or Specimen tree(s) that are retained and protected throughout construction pursuant to this section, may be credited toward the landscape requirements for the site based on the following: a. For one (1) Desirable or Specimen tree preserved between twelve (12) inches to twenty-four (24) inches DBH, the one (1) preserved tree may be counted towards two (2) onsite required trees. b. For one (1) Desirable or Specimen tree preserved with twenty-four (24) inches or more DBH, the one (1) preserved tree may be counted towards three (3) onsite required trees. c. A Desirable or Specimen tree(s) credit may be applied towards the new tree requirement but may not be applied towards mitigation for trees removed, VUA required trees, required street trees, buffer yard, or Interdistrict Corridor requirements. d. Any Desirable or Specimen tree which has been retained and are visibly in decline as a result of construction will not be considered for credit. e. Any Desirable or Specimen tree for which tree preservation credits have been granted shall be maintained to good industry standards in perpetuity. At any time the Desirable or Specimen Tree for which tree preservation credits were issued is damaged or destroyed by other than "Act of God", it shall be replaced by a tree with the same dbh amount as was listed in tree preservation credit. 2. Reserved.

(Ord. No. C-97-19, § 1(47-21.12), 6-18-97; Ord. No. C-99-15, §§ 2, 9, 3-16-99; Ord. No. C-04-8, § 2, 3-2-04; Ord. No. C-06-45, § 25, 1-4-07; Ord. No. C-08-04, § 4, 2-5-08; Ord. No. C-15-09, § 15, 2-17-15; Ord. No. C-24-44, § 5, 10-15-24)

Ask a question about Fort Lauderdale law

Corpus searches the Fort Lauderdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.