§ 23-116 — Permit application and review procedure
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 23-116
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/275d91b9-bcf7-418d-a37e-1578196f01cc
Sec. 23-116. - Permit application and review procedure.
(a) Permit required. It is unlawful for any person to place, install, locate, relocate, construct, maintain, repair, operate, or remove any utilities under, on, over, across, or within the public rights-of-way without first obtaining a written permit from the city in accordance with this article, with certain exemptions as described below in this subsection. Permits issued shall: 1) apply only to the areas of the public rights-of-way specifically identified in the permit; 2) include and be subject to all conditions provided in section 23-114; and 3) remain effective for at least one year, but may be extended by the city manager or designee for good cause or if the permittee remains in compliance with this article. (1) Emergency conditions. In the case of an emergency condition that affects the public health, safety, or welfare, including an unplanned service interruption, an owner or agent of a utility existing in the public rights-of-way may take immediate action to remedy the emergency and shall within 30 calendar days provide notice and information to the city detailing the work performed. The city may require an after-the-fact permit for work that would otherwise have required a permit under this article. (2) Routine maintenance. A person may perform routine maintenance on a utility existing in the public rights-of-way without a new permit for such work, provided the work does not involve any excavation, closure of a sidewalk, or closure of a vehicle or parking lane. However, such person shall provide to the city reasonable advance written notice identifying the areas where the maintenance will occur, scope of work, and the dates and duration of the work to be performed. (3) Facility replacement. A person may replace a facility existing in the public rights-of-way without a new permit for such work, provided: 1) the replacement facility is substantially similar or of the same or smaller size; and 2) the work does not involve any excavation, closure of a sidewalk, or closure of a vehicle or parking lane. However, such person shall provide to the city reasonable advance written notice identifying the areas where the work will occur, scope of work, and the dates and duration of the work to be performed. (4) Micro wireless facilities. A communications services provider that has been permitted under this article to occupy the public rights-of-way and that is remitting communications service taxes imposed by the city pursuant to F.S. Ch. 202, may without a new permit for such work install, place, maintain, or replace a micro wireless facility that is suspended on cables strung between existing utility poles in compliance with this article. (b) Voluntary pre-submittal conference. Prior to submitting a permit application, the applicant is encouraged to schedule a pre-submittal conference with the city to coordinate submittal and compliance with this article. This provision is not mandatory. (c) Permit application. Applicants shall submit a complete permit application or complete consolidated permit application on forms or in a format as may be required by the city. A consolidated permit application is a single permit application for the collocation of up to 30 small wireless facilities within the public rights-of-way in accordance with this article. Applications must include the following: (1) Registration. Current and valid registration information must be provided and maintained in accordance with section 23-113, and updated information must be provided to the city within 90 calendar days of any change. (2) Communications services statement. A statement describing whether the applicant provides or intends to provide communications services within the city; whether the applicant is a pass-through provider or intends to have its communications facilities pass through the city; and whether the applicant leases or intends to lease its facilities to others who will be providing communications services within the city. (3) Collocation agreement. Applications for small wireless facility collocations on a city utility pole must include an executed collocation agreement, on a form provided by the city. Applications for small wireless facility collocations on any utility pole other than a city utility pole must include a copy of a valid agreement for such collocation. In lieu of the entire agreement, the applicant may provide the first page and the signature page of such agreement or a notarized letter of authorization from the owner of the utility pole, providing adequate identifying information and indicating the applicant is authorized to collocate. (4) Compensation. Applications must include all applicable compensation as provided in section 23-115. (5) Engineering and construction plans. Applications must include the following: a. The proposed dates, times, and locations for utility installation or work, including a description of the type, size, and number of proposed utilities or facilities. b. A description of the manner in which the utility will be installed or modified, including anticipated construction methods or techniques, and an engineering plan with drawings, photographs, and cross-section schematics prepared by a licensed engineer or person exempt from licensing under F.S. § 471.003, that is consistent with the city's engineering design and construction manual and that includes: 1) the type and location of proposed utilities, including the approximate size and linear mileage of utilities, facilities and equipment; 2) the type of installation or work proposed for the subject utilities; 3) maps showing the routing of new construction or any work that involves any alteration to the public right-of-way; 4) maps showing the locations of any known utilities located above, on, or below the subject public rights-of-way located within 50 feet of all work proposed; 5) maps showing the subject utility with distances in relation to utilities, facilities, pavement, sidewalks, driveways, ramps, trees, or other structures located within 50 feet of all work proposed in the public rights-of-way; and 6) engineering certification attesting that the proposed location of the utility work is structurally sufficient and otherwise appropriate for the proposed work. The city, at its sole discretion, may require the applicant to have the engineering and construction plans certified by an independent licensed engineer or person exempt from licensing under F.S. § 471.003, as selected by the city. c. Any trees or landscaping that may be impacted by the work proposed, which shall be regulated under applicable provisions of the city's Code of Ordinances. d. Maintenance of traffic or temporary sidewalk closure plan for any disruption of the public rights-of-way. e. A restoration plan and good faith estimate of the cost to restore the public rights-of-way to the condition it was in prior to proposed work. (6) Compliance with review criteria. Applications must include evidence demonstrating compliance with the review criteria provided in section 23-117, which may include information the city manager or designee finds reasonably necessary to demonstrate the application's compliance with such review criteria, including but not limited to a survey showing that the area is within the public rights-of-way and that the city has the appropriate authority to issue a permit under this article. (d) Permit review procedure. An application for a permit must be reviewed as follows: The city manager or designee may separately address small wireless facility collocation requests that were submitted under a consolidated permit application for which incomplete information has been received or which are denied. (1) Notice of application deficiency. Within 14 calendar days after the date of filing an application, unless mutually extended by the city and applicant, the city manager or designee shall determine whether the application is complete. If an application is deemed incomplete, the city manager or designee shall notify the applicant by electronic mail and specifically identify the missing information. An application will be deemed complete if the city manager or designee fails to notify the applicant otherwise within 14 calendar days after the date of filing an application. (2) Small wireless facilities—Request for alternative location. Within 14 calendar days after the date of filing an application to collocate a small wireless facility on a city utility pole, the city manager or designee may request that the proposed location of the small wireless facility be moved to another location and be placed on an alternative city utility pole. The city and applicant may negotiate the alternative location for 30 calendar days after the date of the request. At the conclusion of this negotiation period, if the alternative location is accepted by the applicant, the applicant shall notify the city of such acceptance and the application will be deemed granted as it relates to any new location for which there is agreement and all other locations in the application. If an agreement is not reached, the applicant shall notify the city of such non-agreement and the city shall grant or deny the original application within 90 calendar days after the date the application was filed. All notices must be in writing provided by electronic mail. (3) Application review period. Within 60 calendar days after the date of filing an application, unless mutually extended by the city and the applicant, the city manager or designee shall approve or deny the application, and a complete application is deemed approved if the city fails to approve or deny the application within this timeframe. (4) Notice of approval or denial. The city manager or designee shall approve an application unless it is incomplete or it does not comply with the requirements of this article, and notice of approval must be provided to the applicant by electronic mail. If an application is denied, the city manager or designee shall notify the applicant by electronic mail on the day the application is denied with specification as to the basis of denial, including the specific code provisions on which the denial is based. The applicant may cure the deficiencies identified and resubmit the application within 30 calendar days after notice of the denial is sent to the applicant. The city manager or designee shall approve or deny the revised application within 30 calendar days after receipt or the application is deemed approved. The review of a revised application is limited to the deficiencies cited in the denial.
(Ord. No. 170786, § 4, 3-1-18; Ord. No. 190129, § 1, 2-6-20; Ord. No. 2024-167, § 1, 3-21-24)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.