§ 27-280.2 — Same—Testing
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-280.2
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/ef221764-d0b2-4a90-8b3c-458f880b543e
Sec. 27-280.2. - Same—Testing.
Before installation and periodically thereafter, each meter shall be tested and shall be considered commercially accurate if it measures not more than one (1) percent fast and not more than two (2) percent slow when installed. Meters in use shall be tested at the request of the consumer, and in his/her presence if desired, provided the consumer shall make a meter testing deposit in accordance with the schedule set out in Appendix A. If the meter is shown to be inaccurate in excess of five (5) percent slow or two (2) percent fast for residential customers' meters or two (2) percent, fast or slow, for non-residential customer's meters, the bills will be adjusted as specified in section 27-14.4. If the meter is more than two (2) percent fast, the meter testing deposit shall be refunded, otherwise it may be retained by the city as a service charge for the test.
(Ord. No. 3664, § 1, 9-24-90; Ord. No. 3754, § 80, 1-27-92; Ord. No. 950733, § 3, 10-9-95; Ord. No. 160253, § 6, 9-15-16)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
