For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-8.27 — Permits

Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 30-8.27

Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/fe0228f4-1bdc-4965-8be7-088c81b98aa3

Sec. 30-8.27. - Permits.

A. Permits required. Any owner or authorized agent who intends to undertake any development within the scope of FPO Division 5, including buildings, structures and facilities exempt from the Florida Building Code, which is wholly or partially within any flood hazard area shall first apply to the floodplain administrator, and the building official if applicable, and shall obtain the required permit(s) and approval(s). No such permit or approval shall be issued until compliance with the requirements of FPO Division 5 and all other applicable codes and regulations of the City of Gainesville has been satisfied. B. Floodplain development permits or approvals. Floodplain development permits or approvals shall be issued pursuant to FPO Division 5 for any development not subject to the requirements of the Florida Building Code, including buildings, structures and facilities exempt from the Florida Building Code. Depending on the nature and extent of proposed development that includes a building or structure, the floodplain administrator may determine that a floodplain development permit or approval is required in addition to a building permit. C. Buildings, structures and facilities exempt from the Florida Building Code. Pursuant to the requirements of federal regulation for participation in the National Flood Insurance Program (44 CFR 59 and 44 CFR 60), floodplain development permits or approvals shall be required for the following buildings, structures and facilities that are exempt from the Florida Building Code: 1. Railroads and ancillary facilities associated with the railroad. 2. Nonresidential farm buildings on farms, as provided in F.S. § 604.50. 3. Temporary buildings or sheds used exclusively for construction purposes. 4. Mobile or modular structures used as temporary offices. 5. Those structures or facilities of electric utilities, as defined in F.S. § 366.02, which are directly involved in the generation, transmission, or distribution of electricity. 6. Chickees constructed by the Miccosukee Tribe of Indians of Florida or the Seminole Tribe of Florida. As used in this paragraph, the term "chickee" means an open-sided wooden hut that has a thatched roof of palm or palmetto or other traditional materials, and that does not incorporate any electrical, plumbing, or other non-wood features. 7. Family mausoleums not exceeding 250 square feet in area which are prefabricated and assembled on site or preassembled and delivered on site and have walls, roofs, and a floor constructed of granite, marble, or reinforced concrete. 8. Temporary housing provided by the department of corrections to any prisoner in the state correctional system. 9. Structures identified in F.S. § 553.73(10)(k), are not exempt from the Florida Building Code if such structures are located in flood hazard areas established on flood insurance rate maps. D. Application for a permit or approval. To obtain a floodplain development permit or approval the applicant shall first file an application in writing on a form furnished by the city. The information provided shall: 1. Identify and describe the development to be covered by the permit or approval. 2. Describe the land on which the proposed development is to be conducted by legal description, street address or similar description that will readily identify and definitively locate the site. 3. Indicate the use and occupancy for which the proposed development is intended. 4. Be accompanied by a site plan or construction documents as specified in section 30-8.28 of FPO Division 5. 5. State the valuation of the proposed work. 6. Be signed by the applicant or the applicant's authorized agent. 7. Give such other data and information as required by the floodplain administrator. E. Validity of permit or approval. The issuance of a floodplain development permit or approval pursuant to FPO Division 5 shall not be construed to be a permit for, or approval of, any violation of FPO Division 5, the Florida Building Code, or any other subdivision of the city. The issuance of permits based on submitted applications, construction documents, and information shall not prevent the floodplain administrator from requiring the correction of errors and omissions. F. Expiration. A floodplain development permit or approval shall become invalid unless the work authorized by such permit is commenced within 180 calendar days after its issuance, or if the work authorized is suspended or abandoned for a period of 180 calendar days after the work commences. Extensions for periods of not more than 180 calendar days each shall be requested in writing and justifiable cause shall be demonstrated. G. Suspension or revocation. The floodplain administrator is authorized to suspend or revoke a floodplain development permit or approval if the permit was issued in error, on the basis of incorrect, inaccurate or incomplete information, or in violation of FPO Division 5 or any other ordinance, regulation or requirement of the city. H. Other permits required. Floodplain development permits and building permits shall include a condition that all other applicable state or federal permits be obtained before commencement of the permitted development, including but not limited to the following: 1. The St. Johns River Water Management District (SJRWMD), or Suwannee River Water Management District (SRWMD), whichever is applicable; F.S. § 373.036. 2. Florida Department of Health for onsite sewage treatment and disposal systems; F.S. § 381.0065, and Chapter 64E-6, Florida Administrative Code. 3. Florida Department of Environmental Protection for activities subject to the Joint Coastal Permit; F.S. § 161.055. 4. Florida Department of Environmental Protection for activities that affect wetlands and alter surface water flows, in conjunction with the U.S. Army Corps of Engineers; Section 404 of the Clean Water Act. 5. Federal permits and approvals.

(Ord. No. 210195, § 1, 10-21-21)

Ask a question about Gainesville law

Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.