Sec. 74-89. - Installation inspection.
(a) The contractor or owner securing the permit for any sign shall notify the planning and development department and request an inspection whenever such sign is being installed and before any concrete is poured or support work is undertaken. Work on signs that require welding shall be performed by AWS-certified welders. A final inspection shall be requested upon completion. At the time of the final inspection, a photograph of the completed sign shall be taken by the inspector and placed with the plans or file records of the building permit for the sign. (b) At the time of final inspection, the inspector shall attach a metal label or decal to the sign, visible from ground level, which shows the permit number and date of installation.
(Code 1960, § 24B-7(c), (d); Ord. No. 94-114, § 1, 12-13-1994)
Ask a question about Hialeah law
Corpus searches the Hialeah sections it holds and shows the ones that match, with their citations. Free, no sign-in.